ODOT contract 260184 bid tabulation
WAR-SR 123-16.79 (MINOR RECONSTRUCTION). Let by Ohio DOT on April 9, 2026, WAR. 3 bids received; low bid $818,000 by Barrett Paving Materials Inc, +4.7% against the engineer's estimate of $781,000.
- Owner
- Ohio DOT
- Letting
- 09 APR 2026
- Pay items
- 67
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Barrett Paving Materials Inc | $818,000 | Low | +5.0% |
| 2 | John R Jurgensen Company | $846,720 | +4.0% | +8.0% |
| 3 | Sunesis Construction Co | $943,480 | +15% | +21% |
Engineer's estimate: $781,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Barrett Paving Materials Inc | 2. John R Jurgensen Company | 3. Sunesis Construction Co |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $2,500.00 | $1,018.25 | $6,739.41 |
| 2 | Pavement removed (202E23000) | SY | 1,863 | $15.00 | $8.41 | $5.19 |
| 3 | Guardrail removed (202E38000) | FT | 422 | $6.00 | $6.00 | $6.00 |
| 4 | Excavation (203E10000) | CY | 292 | $45.00 | $20.15 | $59.15 |
| 5 | Embankment (203E20000) | CY | 356 | $35.00 | $30.36 | $19.49 |
| 6 | Subgrade compaction (204E10000) | SY | 1,999 | $2.00 | $2.28 | $1.41 |
| 7 | Excavation of subgrade (204E13000) | CY | 671 | $50.00 | $46.34 | $57.74 |
| 8 | Granular material, type C (204E30020) | CY | 671 | $105.00 | $94.40 | $102.93 |
| 9 | Proof rolling (204E45000) | HR | 1 | $1,850.00 | $239.42 | $510.83 |
| 10 | Geotextile fabric (204E50000) | SY | 1,999 | $2.25 | $3.18 | $1.25 |
| 11 | Preparing subgrade for shoulder paving (209E72000) | STA | 6 | $225.00 | $614.96 | $410.38 |
| 12 | Guardrail, type MGS (606E15050) | FT | 225 | $27.25 | $27.25 | $27.25 |
| 13 | Guardrail, type MGS with long posts (606E15100) | FT | 50 | $31.50 | $31.50 | $31.50 |
| 14 | Guardrail, type MGS half post spacing (606E15150) | FT | 62.50 | $40.00 | $40.00 | $40.00 |
| 15 | Guardrail, type MGS half post spacing with long posts (606E15200) | FT | 312.50 | $47.50 | $47.50 | $47.50 |
| 16 | Anchor assembly, MGS type T (606E26550) | EACH | 1 | $1,275.00 | $1,275.00 | $1,275.00 |
| 17 | Special - mailbox removed and reset (690E50350) | EACH | 1 | $400.00 | $677.34 | $227.45 |
| 18 | Inspection and compaction testing of unbound materials (878E25000) | LS | 1 | $8,500.00 | $5,913.69 | $3,000.00 |
| 19 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 5 | $100.00 | $562.21 | $351.23 |
| 20 | Topsoil (659E00300) | CY | 41 | $125.00 | $131.55 | $45.00 |
| 21 | Seeding and mulching (659E10000) | SY | 370 | $4.00 | $4.00 | $20.76 |
| 22 | Repair seeding and mulching (659E14000) | SY | 19 | $4.00 | $4.00 | $2.20 |
| 23 | Inter-seeding (659E15000) | SY | 19 | $1.00 | $1.00 | $2.20 |
| 24 | Commercial fertilizer (659E20000) | TON | 0.05 | $2,500.00 | $2,500.00 | $1,400.00 |
| 25 | Lime (659E31000) | ACRE | 0.08 | $200.00 | $200.00 | $450.00 |
| 26 | Water (659E35000) | MGAL | 2 | $1.00 | $1.00 | $0.01 |
| 27 | Ditch erosion protection mat, type B (670E00720) | SY | 560 | $3.15 | $3.15 | $3.00 |
| 28 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 | $1.00 |
| 29 | 4" unclassified pipe underdrains (605E05200) | FT | 25 | $10.00 | $74.31 | $36.80 |
| 30 | Aggregate drains (605E31100) | FT | 245 | $20.00 | $43.15 | $19.52 |
| 31 | 4" conduit, type F (611E00406) | FT | 25 | $10.00 | $63.42 | $52.92 |
| 32 | Precast reinforced concrete outlet (611E99710) | EACH | 2 | $250.00 | $770.27 | $796.32 |
| 33 | Pavement repair (253E02000) | CY | 118 | $450.00 | $765.00 | $795.19 |
| 34 | Pavement planing, asphalt concrete, T=2" (254E01000) | SY | 7,099 | $10.00 | $5.50 | $5.50 |
| 35 | Pavement planing, asphalt concrete, T=3" (254E01000) | SY | 310 | $13.00 | $25.00 | $25.00 |
| 36 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 315 | $220.00 | $300.00 | $300.00 |
| 37 | Aggregate base (304E20000) | CY | 321 | $115.00 | $95.12 | $107.85 |
| 38 | Non-tracking tack coat (407E20000) | GAL | 908 | $4.00 | $5.00 | $5.00 |
| 39 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 78 | $375.00 | $475.00 | $475.00 |
| 40 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 111 | $300.00 | $380.00 | $380.00 |
| 41 | Asphalt concrete surface course, 12.5 MM, type A (448) (442E20000) | CY | 395 | $355.00 | $420.00 | $420.00 |
| 42 | Compacted aggregate (617E10100) | CY | 18 | $225.00 | $306.52 | $174.27 |
| 43 | Removal of delineator (620E31200) | EACH | 9 | $10.00 | $20.00 | $10.00 |
| 44 | RPM (621E00100) | EACH | 72 | $62.65 | $62.65 | $62.65 |
| 45 | Raised pavement marker removed (621E54000) | EACH | 72 | $8.00 | $20.74 | $31.14 |
| 46 | Barrier reflector, type 2, bidirectional (626E00110) | EACH | 14 | $15.00 | $15.00 | $14.00 |
| 47 | Ground mounted support, no. 3 post (630E03100) | FT | 70 | $15.00 | $15.00 | $15.00 |
| 48 | Sign post reflector (630E08600) | EACH | 5 | $50.00 | $50.00 | $50.00 |
| 49 | Removal of ground mounted sign and reerection (630E85100) | EACH | 5 | $50.00 | $50.00 | $50.00 |
| 50 | Removal of ground mounted post support and disposal (630E86002) | EACH | 5 | $30.00 | $30.00 | $30.00 |
| 51 | Signing, misc.:LED flasher reinstallation (630E97700) | EACH | 2 | $1,350.00 | $1,350.00 | $1,350.00 |
| 52 | Edge line, 6" (644E00104) | MI | 1.67 | $4,670.00 | $4,670.00 | $4,595.00 |
| 53 | Center line (644E00300) | MI | 0.13 | $7,185.00 | $7,185.00 | $15,000 |
| 54 | Stop line (644E00500) | FT | 114 | $9.00 | $9.00 | $10.00 |
| 55 | Wrong way arrow (644E01360) | EACH | 4 | $269.00 | $269.00 | $373.00 |
| 56 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 40 | $100.00 | $137.26 | $85.00 |
| 57 | Detour signing (614E12420) | LS | 1 | $5,600.00 | $5,600.00 | $5,400.00 |
| 58 | Portable changeable message sign, as per plan (614E18601) | SNMT | 6 | $925.00 | $925.00 | $925.00 |
| 59 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $6,971.10 | $4,129.83 | $5,835.15 |
| 60 | Maintaining traffic (614E11000) | LS | 1 | $65,000 | $30,449 | $57,011 |
| 61 | Construction layout stakes and surveying (623E10000) | LS | 1 | $15,000 | $5,283.11 | $7,300.00 |
| 62 | Mobilization (624E10000) | LS | 1 | $20,000 | $40,000 | $82,229 |
| 100 | Work zone center line, class I, 642 paint (614E21100) | MI | 0.13 | $2,670.00 | $2,670.00 | $25,000 |
| 101 | Work zone center line, class III, 642 paint (614E21550) | MI | 0.13 | $2,670.00 | $2,670.00 | $25,000 |
| 102 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 0.25 | $1,780.00 | $1,780.00 | $12,500 |
| 103 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 1.67 | $1,780.00 | $1,780.00 | $5,232.00 |
| 104 | Work zone stop line, class III, 642 paint (614E26610) | FT | 114 | $7.40 | $7.40 | $5.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of April 9, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.