ODOT contract 260063 bid tabulation
PIK-SR 32-09.27/09.96 (Safety) (INTERSECTION). Let by Ohio DOT on January 29, 2026, PIK. 4 bids received; low bid $2,231,803 by Shelly & Sands Inc, -12% against the engineer's estimate of $2,538,000.
- Owner
- Ohio DOT
- Letting
- 29 JAN 2026
- Pay items
- 109
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Shelly & Sands Inc | $2,231,803 | Low | -12% |
| 2 | Axis Civil Construction LLC | $2,470,683 | +11% | -3.0% |
| 3 | Allard Excavation LLC | $2,508,181 | +12% | -1.0% |
| 4 | Shelly Company | $2,557,933 | +15% | +1.0% |
Engineer's estimate: $2,538,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelly & Sands Inc | 2. Axis Civil Construction LLC | 3. Allard Excavation LLC | 4. Shelly Company |
|---|---|---|---|---|---|---|---|
| 1 | Pavement removed (202E23000) | SY | 4,900 | $12.00 | $12.50 | $13.00 | $22.25 |
| 2 | Pipe removed, 24" and under (202E35100) | FT | 241 | $12.00 | $30.00 | $19.00 | $63.75 |
| 3 | Catch basin removed (202E58100) | EACH | 7 | $300.00 | $1,250.00 | $612.00 | $795.00 |
| 4 | Excavation (203E10000) | CY | 3,888 | $24.00 | $26.00 | $38.00 | $43.50 |
| 5 | Embankment (203E20000) | CY | 948 | $15.00 | $26.00 | $19.00 | $27.75 |
| 6 | Granular material, type B (203E35110) | CY | 604 | $63.00 | $68.00 | $68.00 | $50.75 |
| 7 | Subgrade compaction (204E10000) | SY | 10,137 | $3.00 | $2.00 | $2.00 | $1.45 |
| 8 | Excavation of subgrade (204E13000) | CY | 604 | $21.00 | $25.00 | $30.00 | $44.00 |
| 9 | Proof rolling (204E45000) | HR | 4 | $250.00 | $200.00 | $256.00 | $260.00 |
| 10 | Geotextile fabric (204E50000) | SY | 1,812 | $0.55 | $2.10 | $2.00 | $1.25 |
| 11 | Inspection and compaction testing of unbound materials (878E25000) | LS | 1 | $20,250 | $12,500 | $57,315 | $31,000 |
| 12 | Topsoil (659E00300) | CY | 815.50 | $27.00 | $40.00 | $35.00 | $89.00 |
| 13 | Seeding and mulching (659E10000) | SY | 7,202 | $0.95 | $0.95 | $1.00 | $0.99 |
| 14 | Repair seeding and mulching (659E14000) | SY | 361 | $0.95 | $0.95 | $1.00 | $0.71 |
| 15 | Inter-seeding (659E15000) | SY | 361 | $0.95 | $0.95 | $1.00 | $0.80 |
| 16 | Commercial fertilizer (659E20000) | TON | 1.01 | $1,250.00 | $1,250.00 | $1,250.00 | $864.45 |
| 17 | Lime (659E31000) | ACRE | 1.49 | $150.00 | $150.00 | $150.00 | $160.54 |
| 18 | Water (659E35000) | MGAL | 41 | $1.00 | $1.00 | $1.00 | $1.00 |
| 19 | Ditch erosion protection (670E00700) | SY | 128 | $2.50 | $2.50 | $2.50 | $2.57 |
| 20 | Storm water pollution prevention plan (832E15000) | LS | 1 | $2,900.00 | $2,000.00 | $2,462.00 | $2,900.00 |
| 21 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $6,420.00 | $15,500 | $11,758 | $1,240.00 |
| 22 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $10,500 | $10,500 | $12,928 | $7,175.00 |
| 23 | Erosion control (832E30000) | EACH | 50,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 24 | 6" unclassified pipe underdrains (605E13300) | FT | 125 | $31.00 | $27.00 | $27.00 | $14.75 |
| 25 | 6" base pipe underdrains (605E14000) | FT | 3,893 | $16.00 | $21.00 | $12.00 | $13.25 |
| 26 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 60 | $25.00 | $27.00 | $21.00 | $61.50 |
| 27 | 12" conduit, type B (611E04400) | FT | 189 | $88.00 | $78.00 | $102.00 | $110.00 |
| 28 | 12" conduit, type C (611E04600) | FT | 244 | $76.00 | $78.00 | $115.00 | $77.00 |
| 29 | 24" conduit, type C (611E10600) | FT | 33 | $150.00 | $120.00 | $168.00 | $207.00 |
| 30 | Catch basin, no. 2-2A (611E98450) | EACH | 1 | $3,500.00 | $3,200.00 | $5,157.00 | $3,235.00 |
| 31 | Catch basin, no. 2-3 (611E98510) | EACH | 5 | $4,400.00 | $3,600.00 | $5,537.00 | $6,900.00 |
| 32 | Manhole, no. 3 (611E99574) | EACH | 2 | $4,500.00 | $4,200.00 | $5,634.00 | $4,875.00 |
| 33 | Precast reinforced concrete outlet (611E99710) | EACH | 1 | $580.00 | $700.00 | $548.00 | $565.00 |
| 34 | Pavement planing, asphalt concrete, 1.5" (254E01000) | SY | 13,444 | $2.50 | $3.80 | $2.50 | $2.70 |
| 35 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 2,789 | $150.00 | $175.00 | $150.00 | $173.50 |
| 36 | Aggregate base (304E20000) | CY | 1,750 | $70.00 | $72.00 | $56.00 | $58.50 |
| 37 | Tack coat (407E10000) | GAL | 60 | $3.50 | $2.50 | $3.50 | $2.50 |
| 38 | Non-tracking tack coat (407E20000) | GAL | 2,411 | $3.50 | $4.10 | $3.50 | $4.10 |
| 39 | Prime coat (408E10000) | GAL | 60 | $5.00 | $20.00 | $5.00 | $20.00 |
| 40 | Asphalt concrete surface course, type 1, (448), PG64-22 (441E50000) | CY | 30 | $325.00 | $475.00 | $325.00 | $475.00 |
| 41 | Asphalt concrete surface course, 12.5 MM, type A (446) (442E10000) | CY | 938 | $215.00 | $258.00 | $215.00 | $258.00 |
| 42 | Asphalt concrete intermediate course, 19 MM, type A (446) (442E10100) | CY | 630 | $192.50 | $222.00 | $193.00 | $222.00 |
| 43 | 4" concrete median (609E70000) | SY | 475 | $65.00 | $90.00 | $100.00 | $126.00 |
| 44 | Connection, fused pull apart (625E00450) | EACH | 28 | $150.00 | $150.00 | $150.00 | $150.00 |
| 45 | Connection, unfused permanent (625E00480) | EACH | 6 | $150.00 | $150.00 | $150.00 | $150.00 |
| 46 | Light pole, conventional, AT15B40 (625E10490) | EACH | 14 | $3,400.00 | $3,400.00 | $3,400.00 | $3,400.00 |
| 47 | Light pole foundation, 24" X 8' deep (625E14100) | EACH | 14 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 48 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 8,796 | $3.50 | $3.50 | $3.50 | $3.50 |
| 49 | No. 10 AWG pole and bracket cable (625E23400) | FT | 1,820 | $1.75 | $1.75 | $1.75 | $1.75 |
| 50 | Conduit, 2", 725.051 (625E25408) | FT | 2,363 | $6.25 | $6.25 | $7.00 | $6.25 |
| 51 | Conduit, 3", 725.051 (625E25504) | FT | 215 | $12.00 | $12.00 | $12.00 | $12.00 |
| 52 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 14 | $500.00 | $500.00 | $500.00 | $500.00 |
| 53 | Trench (625E29000) | FT | 2,363 | $5.50 | $5.50 | $5.50 | $5.50 |
| 54 | Trench in paved area (625E29400) | FT | 215 | $30.00 | $30.00 | $30.00 | $30.00 |
| 55 | Pull box, 725.08, 18" (625E30700) | EACH | 4 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 56 | Ground rod (625E32000) | EACH | 14 | $250.00 | $250.00 | $250.00 | $250.00 |
| 57 | Power service, as per plan (625E34001) | EACH | 2 | $7,000.00 | $7,000.00 | $7,000.00 | $7,000.00 |
| 58 | Underground warning marking tape (625E36010) | FT | 2,578 | $1.75 | $1.75 | $2.00 | $1.75 |
| 59 | Light pole removed (625E75400) | EACH | 2 | $750.00 | $750.00 | $750.00 | $750.00 |
| 60 | Light pole foundation removed (625E75500) | EACH | 2 | $400.00 | $400.00 | $400.00 | $400.00 |
| 61 | Luminaire removed (625E75506) | EACH | 2 | $90.00 | $90.00 | $90.00 | $90.00 |
| 62 | Power service removed (625E75510) | EACH | 2 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 63 | Service cable, 2 conductor, no. 4 AWG (632E69600) | FT | 25 | $4.00 | $4.00 | $4.00 | $4.00 |
| 64 | Delineator, post surface mounted, as per plan (620E60001) | EACH | 145 | $125.00 | $72.69 | $120.00 | $72.69 |
| 65 | RPM (621E00100) | EACH | 181 | $45.00 | $39.00 | $45.00 | $45.00 |
| 66 | RPM reflector (621E00300) | EACH | 114 | $15.00 | $9.00 | $12.50 | $12.50 |
| 67 | Ground mounted support, no. 3 post (630E03100) | FT | 401 | $15.00 | $15.00 | $15.00 | $22.87 |
| 68 | One way support, no. 3 post (630E08004) | FT | 14 | $200.00 | $20.00 | $20.00 | $22.87 |
| 69 | Sign post reflector (630E08600) | EACH | 3 | $51.40 | $51.40 | $51.40 | $66.27 |
| 70 | Sign, flat sheet (630E80100) | SF | 251 | $23.00 | $23.00 | $23.00 | $24.70 |
| 71 | Removal of ground mounted sign and disposal (630E84900) | EACH | 25 | $20.00 | $20.00 | $20.00 | $21.28 |
| 72 | Removal of ground mounted sign and reerection (630E85100) | EACH | 2 | $150.00 | $150.00 | $150.00 | $72.58 |
| 73 | Removal of ground mounted post support and disposal (630E86002) | EACH | 18 | $20.00 | $20.00 | $20.00 | $28.37 |
| 74 | Signing, misc.:signing, misc.: remove and reerect (630E97700) | EACH | 1 | $2,150.00 | $650.00 | $650.00 | $650.00 |
| 75 | Pedestal foundation (632E64020) | EACH | 1 | $650.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 76 | Center line (643E00300) | MI | 1 | $1,750.00 | $1,000.00 | $1,250.00 | $1,000.00 |
| 77 | Edge line, 6" (644E00104) | MI | 1.98 | $6,590.00 | $3,700.00 | $3,700.00 | $3,700.00 |
| 78 | Lane line, 6" (644E00204) | MI | 0.87 | $2,770.00 | $2,400.00 | $2,400.00 | $2,400.00 |
| 79 | Center line (644E00300) | MI | 0.04 | $11,700 | $7,000.00 | $7,000.00 | $7,000.00 |
| 80 | Channelizing line, 12" (644E00404) | FT | 3,438 | $3.15 | $2.20 | $2.20 | $2.20 |
| 81 | Stop line (644E00500) | FT | 84 | $9.00 | $9.00 | $9.00 | $9.00 |
| 82 | Transverse/diagonal line (644E00700) | FT | 314 | $9.00 | $7.00 | $7.00 | $7.00 |
| 83 | Chevron marking (644E00720) | FT | 233 | $9.00 | $7.00 | $7.00 | $7.00 |
| 84 | Lane arrow (644E01300) | EACH | 24 | $100.00 | $120.00 | $120.00 | $120.00 |
| 85 | Lane reduction arrow (644E01350) | EACH | 2 | $280.00 | $120.00 | $120.00 | $120.00 |
| 86 | Dotted line, 6" (644E01510) | FT | 1,756 | $2.30 | $1.15 | $1.15 | $1.15 |
| 87 | Wet reflective thermoplastic pavement marking, edge line, 6" (807E14010) | MI | 3.38 | $6,705.00 | $3,900.00 | $1,850.00 | $3,900.00 |
| 88 | Wet reflective thermoplastic pavement marking, lane line, 6" (807E14110) | MI | 1.69 | $3,890.00 | $1,850.00 | $1,450.00 | $1,850.00 |
| 89 | Grooving for 6" recessed pavement marking, (asphalt) (850E10010) | MI | 5.07 | $2,870.00 | $1,450.00 | $2,870.00 | $1,450.00 |
| 90 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 40 | $104.00 | $85.00 | $90.00 | $80.00 |
| 91 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 4 | $2,250.00 | $2,680.98 | $2,250.00 | $2,075.00 |
| 92 | Asphalt concrete for maintaining traffic (614E13000) | CY | 35 | $250.00 | $200.00 | $250.00 | $185.00 |
| 93 | Barrier reflector, type 1, one-way (614E13310) | EACH | 150 | $9.00 | $28.00 | $18.00 | $18.00 |
| 94 | Object marker, one way (614E13350) | EACH | 150 | $14.00 | $25.00 | $28.00 | $28.00 |
| 95 | Portable changeable message sign, as per plan (614E18601) | SNMT | 30 | $650.00 | $702.00 | $1,500.00 | $1,500.00 |
| 96 | Work zone lane line, class I, 6", 642 paint (614E20110) | MI | 0.13 | $567.00 | $567.00 | $7,500.00 | $870.00 |
| 97 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 3.75 | $1,235.00 | $1,235.00 | $1,275.00 | $990.00 |
| 98 | Work zone channelizing line, class I, 12", 642 paint (614E23210) | FT | 1,561 | $0.80 | $0.80 | $1.50 | $1.00 |
| 99 | Work zone dotted line, class I, 6", 642 paint (614E24202) | FT | 3,791 | $0.51 | $0.51 | $1.00 | $1.50 |
| 100 | Work zone arrow, class I, 642 paint (614E30200) | EACH | 6 | $135.00 | $135.00 | $325.00 | $60.00 |
| 101 | Water (616E10000) | MGAL | 35 | $60.00 | $1.00 | $1.00 | $1.00 |
| 102 | Compacted aggregate, as per plan (617E10101) | CY | 120 | $55.00 | $90.00 | $112.00 | $112.00 |
| 103 | Portable barrier, unanchored (622E41100) | FT | 7,470 | $19.00 | $22.00 | $26.00 | $20.00 |
| 104 | Digital speed limit (DSL) sign assembly (808E18700) | SNMT | 36 | $625.00 | $675.00 | $700.00 | $700.00 |
| 105 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $7,501.01 | $16,000 | $17,315 | $8,000.00 |
| 106 | Maintaining traffic (614E11000) | LS | 1 | $58,625 | $78,000 | $73,000 | $74,000 |
| 107 | Construction layout stakes and surveying (623E10000) | LS | 1 | $25,500 | $20,000 | $56,000 | $9,000.00 |
| 108 | Mobilization (624E10000) | LS | 1 | $100,000 | $110,000 | $155,900 | $88,000 |
| 200 | Detour signing (614E12420) | LS | 1 | $25,000 | $24,965 | $15,000 | $11,500 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 29, 2026. Compiled by Mirage Metrics.