ODOT contract 250536 bid tabulation

VIN-SR 93-07.20 (MINOR RECONSTRUCTION). Let by Ohio DOT on November 13, 2025, VIN. 4 bids received; low bid $1,487,696 by Fillmore Construction, -0.9% against the engineer's estimate of $1,501,000.

Owner
Ohio DOT
Letting
13 NOV 2025
Pay items
65
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Fillmore Construction$1,487,696Low-1.0%
2Shelly & Sands Inc$1,680,336+13%+12%
3Axis Civil Construction LLC$1,787,361+20%+19%
4Allard Excavation LLC$1,878,513+26%+25%
ODOT contract 250536: bids by rank

Engineer's estimate: $1,501,000.

Bid tabulation

LinePay itemUnitQuantity1. Fillmore Construction2. Shelly & Sands Inc3. Axis Civil Construction LLC4. Allard Excavation LLC
1Clearing and grubbing (201E11000)LS1$25,000$5,000.00$20,000$17,000
2Headwall removed (202E20010)EACH2$500.00$800.00$1,300.00$1,681.00
3Pavement removed (202E23000)SY361$20.00$14.50$22.00$11.00
4Pipe removed, 24" and under (202E35100)FT817$20.00$24.00$30.00$13.00
5Guardrail removed (202E38000)FT137.50$10.00$5.00$10.00$3.00
6Catch basin or inlet removed (202E58300)EACH2$250.00$800.00$1,350.00$418.00
7Excavation (203E10000)CY2,312$50.00$24.00$28.00$24.00
8Embankment (203E20000)CY884$30.00$35.00$28.00$42.00
9Subgrade compaction (204E10000)SY1,850$3.00$4.00$3.30$9.00
10Guardrail, type MGS with long posts (606E15100)FT150$30.00$30.00$30.00$34.26
11Anchor assembly, type E (606E26100)EACH1$2,750.00$2,750.00$2,750.00$2,340.00
12Anchor assembly, type T (606E26500)EACH1$1,100.00$1,100.00$1,100.00$1,190.00
13Special - mailbox removed and reset (690E50350)EACH17$300.00$150.00$245.00$182.00
14Rock channel protection, type B with filter (601E32100)CY27$180.00$125.00$140.00$101.00
15Rock channel protection, type C with filter (601E32200)CY16$140.00$180.00$195.00$133.00
16Soil analysis test (659E00100)EACH2$300.00$135.00$150.00$150.00
17Topsoil (659E00300)CY95$60.00$65.00$90.00$34.00
18Seeding and mulching (659E10000)SY9,985$1.45$0.88$0.80$0.80
19Repair seeding and mulching (659E14000)SY499$2.20$0.80$0.80$0.80
20Inter-seeding (659E15000)SY499$2.20$0.80$0.80$0.80
21Commercial fertilizer (659E20000)TON1.39$1,400.00$885.00$1,250.00$1,250.00
22Lime (659E31000)ACRE2.06$450.00$160.00$150.00$150.00
23Water (659E35000)MGAL55$100.00$1.00$1.00$1.00
24Mowing (659E40000)MSF22$100.00$25.00$50.00$50.00
25Ditch erosion protection (670E00700)SY1,699$2.00$1.35$2.50$2.50
26Storm water pollution prevention plan (832E15000)LS1$5,000.00$2,800.00$3,000.00$3,000.00
27Storm water pollution prevention inspections (832E15002)LS1$5,000.00$4,280.00$6,750.00$11,750
28Storm water pollution prevention inspection software (832E15010)LS1$7,500.00$11,054$13,500$11,100
29Erosion control (832E30000)EACH18,750$1.00$1.00$1.00$1.00
30Concrete masonry (602E20000)CY39$1,500.00$1,750.00$2,510.00$2,436.00
3112" conduit, type B (611E04400)FT89$80.00$80.00$75.00$103.00
3212" conduit, type D (611E04900)FT65$60.00$85.00$115.00$125.00
3315" conduit, type D (611E06400)FT50$135.00$250.00$310.00$336.00
3424" conduit, type A (611E10200)FT88$120.00$165.00$160.00$138.00
3524" conduit, type B (611E10400)FT63$140.00$160.00$225.00$224.00
3624" conduit, type D (611E10900)FT150$170.00$320.00$450.00$514.00
3727" conduit, type D (611E12400)FT35$210.00$650.00$550.00$615.00
3830" conduit, type A (611E13200)FT124$160.00$215.00$240.00$221.00
3930" conduit, type D (611E13900)FT195$210.00$650.00$560.00$605.00
4036" conduit, type B (611E16400)FT72$200.00$250.00$310.00$335.00
4142" conduit, type A (611E19200)FT68$180.00$315.00$265.00$300.00
4248" conduit, type A (611E20700)FT68$200.00$415.00$400.00$542.00
43Catch basin, no. 2-2B (611E98470)EACH1$3,000.00$3,750.00$4,000.00$3,939.00
44Catch basin, no. 2-3 (611E98510)EACH1$4,000.00$4,000.00$4,400.00$4,008.00
45Catch basin, no. 2-4 (611E98540)EACH1$5,000.00$6,000.00$7,200.00$5,510.00
46Asphalt concrete base, PG64-22, (449) (302E56000)CY2,900$182.00$195.00$198.00$215.00
47Aggregate base (304E20000)CY787$80.00$110.00$145.00$117.00
48Tack coat (407E10000)GAL1,710$3.50$3.50$2.50$2.50
49Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000)CY382$218.00$236.50$240.00$247.00
50Asphalt concrete intermediate course, type 2, (449) (441E70300)CY445$204.00$215.00$230.00$239.00
51Asphalt concrete surface course, type 1, (449), (driveways) (441E70500)CY72$250.00$600.00$315.00$485.00
52Asphalt concrete intermediate course, type 2, (449), (driveways) (441E70700)CY43$240.00$550.00$290.00$405.00
536" non-reinforced concrete pavement, class QC 1P (452E10010)SY232$60.00$70.00$128.00$107.00
54Fire hydrant removed and reset (638E10500)EACH1$5,000.00$3,100.00$6,500.00$5,505.00
55Ground mounted support, no. 3 post (630E03100)FT25$45.00$25.00$25.00$45.00
56Sign, flat sheet (630E80100)SF11$95.00$25.00$25.00$95.00
57Removal of ground mounted sign and disposal (630E84900)EACH2$325.00$25.00$25.00$36.00
58Removal of ground mounted post support and disposal (630E86002)EACH2$325.00$25.00$25.00$36.00
59Edge line, 6" (646E10010)MI0.98$8,831.00$3,300.00$7,400.00$8,028.00
60Center line (646E10200)MI0.47$8,831.00$3,300.00$7,400.00$8,028.00
61Detour signing (614E12420)LS1$8,800.00$8,800.00$8,800.00$8,800.00
62Premium for contract performance bond and for payment bond (103E05000)LS1$15,000$8,858.18$15,000$14,000
63Maintaining traffic (614E11000)LS1$47,700$30,000$28,000$15,000
64Construction layout stakes and surveying (623E10000)LS1$7,500.00$31,000$20,000$27,890
65Mobilization (624E10000)LS1$40,000$40,000$40,000$75,000
ODOT contract 250536: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of November 13, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy