ODOT contract 250355 bid tabulation
SCI-Shawnee State ODNR FY26 (PARKING AREAS). Let by Ohio DOT on July 17, 2025, SCI. 5 bids received; low bid $388,633 by Shelly Company.
- Owner
- Ohio DOT
- Letting
- 17 JUL 2025
- Pay items
- 31
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Shelly Company | $388,633 | Low |
| 2 | Fillmore Construction | $396,878 | +2.0% |
| 3 | Allard Excavation LLC | $420,001 | +8.0% |
| 4 | Alan Stone Co Inc | $424,424 | +9.0% |
| 5 | Scioto Valley Paving LLC | $460,684 | +19% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelly Company | 2. Fillmore Construction | 3. Allard Excavation LLC | 4. Alan Stone Co Inc | 5. Scioto Valley Paving LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Pavement removed (202E23000) | SY | 370 | $33.50 | $10.00 | $25.00 | $20.00 | $15.00 |
| 2 | Curb removed (202E32000) | FT | 1,775 | $5.75 | $10.00 | $5.00 | $7.00 | $2.50 |
| 3 | Special - parking block removed (202E52990) | EACH | 25 | $16.00 | $20.00 | $38.00 | $20.00 | $20.00 |
| 4 | Embankment (203E20000) | CY | 50 | $120.00 | $100.00 | $75.00 | $35.00 | $35.00 |
| 5 | Subgrade compaction (204E10000) | SY | 370 | $1.90 | $10.00 | $11.00 | $6.00 | $4.00 |
| 6 | Seeding and mulching (659E10000) | SY | 493 | $16.25 | $4.25 | $4.00 | $4.00 | $4.50 |
| 7 | Repair seeding and mulching (659E14000) | SY | 25 | $10.00 | $6.50 | $0.05 | $15.00 | $4.50 |
| 8 | Commercial fertilizer (659E20000) | TON | 0.50 | $891.38 | $1,400.00 | $584.00 | $640.00 | $1,200.00 |
| 9 | Lime (659E31000) | ACRE | 0.01 | $155.00 | $450.00 | $584.00 | $910.00 | $1,200.00 |
| 10 | Water (659E35000) | MGAL | 6 | $1.00 | $10.00 | $1.00 | $110.00 | $1.00 |
| 11 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 12 | Partial depth pavement repair (441), as per plan (251E01001) | SY | 391 | $53.50 | $44.00 | $53.50 | $50.00 | $55.00 |
| 13 | Full depth pavement sawing (252E01500) | FT | 2,220 | $1.30 | $4.00 | $3.00 | $1.50 | $12.00 |
| 14 | Pavement planing, asphalt concrete (1.5") (254E01000) | SY | 14,402 | $3.30 | $2.00 | $3.30 | $3.00 | $3.95 |
| 15 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 62 | $245.00 | $220.00 | $245.00 | $310.00 | $300.00 |
| 16 | Non-tracking tack coat (407E20000) | GAL | 1,296 | $3.90 | $3.00 | $3.90 | $2.50 | $1.00 |
| 17 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 600 | $216.75 | $210.00 | $216.75 | $300.00 | $295.00 |
| 18 | Curb, type 6, as per plan (609E26001) | FT | 2,220 | $31.00 | $50.00 | $28.00 | $33.00 | $36.00 |
| 19 | Catch basin adjusted to grade (611E98630) | EACH | 5 | $1,050.00 | $1,500.00 | $950.00 | $570.00 | $800.00 |
| 20 | Manhole adjusted to grade (611E99654) | EACH | 5 | $1,050.00 | $1,500.00 | $950.00 | $580.00 | $800.00 |
| 21 | Center line (644E00300) | MI | 0.31 | $12,500 | $12,450 | $12,500 | $15,500 | $12,500 |
| 22 | Stop line (644E00500) | FT | 36 | $12.00 | $10.00 | $12.00 | $12.00 | $12.00 |
| 23 | Transverse/diagonal line (644E00700) | FT | 80 | $2.15 | $3.00 | $2.15 | $3.75 | $2.15 |
| 24 | Parking lot stall marking (644E01200) | FT | 3,000 | $2.15 | $2.70 | $2.15 | $4.00 | $2.15 |
| 25 | Lane arrow (644E01300) | EACH | 6 | $190.00 | $125.00 | $190.00 | $150.00 | $190.00 |
| 26 | Handicap symbol marking (644E01600) | EACH | 4 | $225.00 | $120.00 | $225.00 | $150.00 | $225.00 |
| 27 | Portable changeable message sign (614E18600) | SNMT | 2 | $1,650.00 | $1,500.00 | $1,400.00 | $1,600.00 | $2,500.00 |
| 28 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $2,000.00 | $5,000.00 | $10,000 | $5,000.00 | $12,000 |
| 29 | Maintaining traffic (614E11000) | LS | 1 | $12,500 | $7,500.00 | $10,000 | $5,000.00 | $5,500.00 |
| 30 | Construction layout stakes and surveying (623E10000) | LS | 1 | $3,000.00 | $3,500.00 | $10,000 | $6,000.00 | $7,700.00 |
| 31 | Mobilization (624E10000) | LS | 1 | $14,500 | $5,000.00 | $47,000 | $10,000 | $10,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of July 17, 2025. Compiled by Mirage Metrics.