ODOT contract 260287 bid tabulation

FUL-US 20-19.75 Roundabout (INTERSECTION). Let by Ohio DOT on June 11, 2026, FUL. 3 bids received; low bid $3,332,719 by Miller Bros Const Inc, -12% against the engineer's estimate of $3,783,000.

Owner
Ohio DOT
Letting
11 JUN 2026
Pay items
121
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Miller Bros Const Inc$3,332,719Low-12%
2Geddis Paving & Excavating Inc$3,682,638+10%-3.0%
3Vernon Nagel Inc$3,731,075+12%-1.0%
ODOT contract 260287: bids by rank

Engineer's estimate: $3,783,000.

Bid tabulation

LinePay itemUnitQuantity1. Miller Bros Const Inc2. Geddis Paving & Excavating Inc3. Vernon Nagel Inc
1Clearing and grubbing (201E11000)LS1$60,000$3,000.00$24,380
2Pavement removed (202E23000)SY8,724$20.00$15.50$11.20
3Pipe removed (202E34900)FT1,120$50.00$21.00$21.00
4Manhole removed (202E58000)EACH2$1,100.00$335.00$335.00
5Catch basin removed (202E58100)EACH4$1,200.00$235.00$310.00
6Removal misc.:concrete sign foundation (202E98100)EACH4$600.00$375.00$625.00
7Excavation (203E10000)CY10,718$1.00$23.50$24.00
8Embankment (203E20000)CY1,852$25.00$23.50$7.00
9Subgrade compaction (204E10000)SY9,911$0.50$0.75$1.00
10Excavation of subgrade (204E13000)CY93$40.00$30.00$48.00
11Granular material, type D (204E30030)CY93$65.00$60.00$54.00
12Proof rolling (204E45000)HR6$200.00$455.00$350.00
13Geotextile fabric (204E50000)SY76$8.00$5.00$3.90
14Cement (206E10500)TON290$200.00$250.00$222.00
15Curing coat (206E11000)SY9,409$1.25$1.25$1.15
16Cement stabilized subgrade, 14 inches deep (206E15020)SY9,409$7.00$6.00$8.64
17Primary project control monument, type A (623E12000)EACH1$980.00$1,050.00$1,200.00
18Tied concrete block mat with type 1 underlayment (601E21050)SY20$180.00$200.00$180.00
19Commercial fertilizer (654E11000)TON1.90$800.00$950.00$850.00
20Soil analysis test (659E00100)EACH2$60.00$70.00$70.00
21Topsoil (659E00300)CY1,559$13.00$61.50$78.00
22Seeding and mulching (659E10000)SY14,041$0.80$1.00$0.89
23Repair seeding and mulching (659E14000)SY702$0.80$1.00$0.89
24Inter-seeding (659E15000)SY702$0.50$0.65$0.60
25Lime (659E31000)ACRE2.90$0.50$39.00$35.00
26Water (659E35000)MGAL76$0.50$1.00$1.00
27Slope erosion protection (670E00500)SY3,411$1.65$2.00$1.80
28Storm water pollution prevention plan (832E15000)LS1$1,175.00$1,300.00$3,200.00
29Storm water pollution prevention inspections (832E15002)LS1$7,200.00$16,100$10,700
30Storm water pollution prevention inspection software (832E15010)LS1$8,815.00$16,300$10,892
31Erosion control (832E30000)EACH60,000$1.00$1.00$1.00
32Rock channel protection, type C with filter (601E32200)CY20$100.00$180.00$210.00
33Concrete masonry (602E20000)CY4.30$3,850.00$3,950.00$3,890.00
346" unclassified pipe underdrains (605E13300)FT454$26.00$25.00$22.00
356" base pipe underdrains (605E14000)FT3,093$18.00$25.00$18.00
366" conduit, type F for underdrain outlets (611E00510)FT205$40.00$25.00$18.00
376" conduit, type E (611E01400)FT200$25.00$25.00$18.00
386" conduit, type F (611E01500)FT300$29.00$25.00$14.00
3912" conduit, type C (611E04600)FT174$90.00$110.00$106.00
4027" conduit, type D (611E12400)FT48$130.00$185.00$200.00
4122" X 34" conduit, type B, 706.04 (611E52402)FT109$230.00$215.00$220.00
4222" X 34" conduit, type C, 706.04 (611E52404)FT24$215.00$180.00$200.00
4324" X 38" conduit, type B, 706.04 (611E52502)FT79$235.00$215.00$280.00
4424" X 38" conduit, type C, 706.04 (611E52504)FT73$240.00$170.00$240.00
45Catch basin, no. 3, as per plan (611E98151)EACH5$4,600.00$3,000.00$6,600.00
46Catch basin, no. 3A, as per plan (611E98181)EACH5$4,000.00$3,550.00$5,600.00
47Special - special, river rock with weed barrier (690E98300)SY265$100.00$112.00$35.00
48Full depth pavement sawing (252E01500)FT384$4.50$7.00$1.20
49Pavement planing, asphalt concrete, 1.5" (254E01000)SY4,815$2.70$4.00$2.70
50Asphalt concrete base, PG64-22, (449) (301E56000)CY115$300.00$260.00$300.00
51Aggregate base (304E20000)CY2,063$80.00$69.00$94.00
52Tack coat (407E10000)GAL644$1.00$3.00$1.00
53Stabilized crushed aggregate (411E10000)CY87$90.00$120.00$80.00
54Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000)CY100$310.00$275.00$310.00
55Asphalt concrete surface course, 12.5 MM, type A (449), as per plan (442E22101)CY210$330.00$290.00$330.00
5613" non-reinforced concrete pavement, class QC 1P (452E16010)SY7,395$111.50$120.00$116.00
57Non-reinforced concrete pavement, misc.:9" concret (452E19200)SY1,530$111.00$145.00$118.00
58Combination curb and gutter, type 3, as per plan (609E18001)FT2,676$25.50$30.00$28.00
59Curb, type 4-C (609E24510)FT54$34.00$38.00$38.00
60Curb, type 6 (609E26000)FT104$20.00$22.00$18.00
61Combination curb and gutter, type 9, as per plan (609E31001)FT295$24.00$26.50$24.50
62Curb, type 10, as per plan (609E33001)FT1,944$19.00$23.00$20.00
63Curb, type 10-B (609E33200)FT66$22.00$24.50$24.00
64Rumble strips, transverse (asphalt concrete) (618E39000)EACH10$800.00$1,070.00$220.00
65Connection, fused pull apart (625E00450)EACH24$172.25$175.00$172.25
66Light pole, conventional, AT8B30 (625E10490)EACH12$3,402.10$3,500.00$3,402.10
67Light pole foundation, 24" X 6' deep (625E14000)EACH12$1,777.25$1,800.00$1,777.25
68Bracket arm, 8' (625E17960)EACH12$780.95$785.00$780.95
69No. 10 AWG 600 volt distribution cable (625E23306)FT6,609$2.50$2.50$2.50
70No. 10 AWG pole and bracket cable (625E23400)FT1,548$2.50$2.50$2.50
71Conduit, 1", 725.051 (625E25104)FT1,736$3.83$4.00$3.83
72Conduit, jacked or drilled, 1", 725.04 (625E25900)FT277$21.23$22.00$21.23
73Luminaire, conventional, solid state (LED), 196W, (625E26252)EACH12$903.10$905.00$903.10
74Trench, 24" deep (625E29002)FT1,736$9.31$10.00$9.31
75Pull box, 725.06, size 1.5 (625E30500)EACH6$811.50$825.00$811.50
76Ground rod (625E32000)EACH13$262.25$270.00$262.25
77Power service (625E34000)EACH1$11,370$12,700$11,370
78Underground warning marking tape (625E36010)FT1,736$1.83$2.00$1.83
79Delineator, post surface mounted (620E60000)EACH1$89.68$100.00$80.00
80Delineator, post surface mounted, as per plan (620E60001)EACH3$89.68$100.00$80.00
81RPM (621E00100)EACH216$62.15$69.00$49.00
82Ground mounted support, no. 3 post, as per plan (630E03101)FT680.25$17.20$19.00$17.20
83Sign post reflector, as per plan (630E08601)EACH16$60.32$67.00$58.00
84Sign support assembly, pole mounted (630E79500)EACH2$114.96$130.00$280.00
85Sign, flat sheet (630E80100)SF280.35$19.95$22.00$20.00
86Removal of ground mounted sign and storage (630E85000)EACH34$17.03$19.00$17.00
87Removal of ground mounted sign and reerection (630E85100)EACH13$65.48$73.00$65.50
88Removal of ground mounted post support and storage (630E86006)EACH36$22.70$25.00$22.70
89Removal of structure mounted sign and disposal (630E86310)EACH52$7.83$8.00$7.85
90Removal of wood pole and storage (630E89814)EACH4$271.36$305.00$119.00
91Removal of photoelectric control (631E94480)EACH4$50.00$670.00$50.00
92Edge line, 6" (644E00104)MI0.46$6,920.00$6,920.00$6,920.00
93Center line (644E00300)MI0.35$8,985.00$8,985.00$8,985.00
94Transverse/diagonal line (644E00700)FT230$9.75$10.00$9.75
95Edge line, 6" (646E10010)MI1.12$4,760.00$4,760.00$4,760.00
96Center line (646E10200)MI0.29$6,355.00$6,355.00$6,355.00
97Transverse/diagonal line (646E10600)FT430$12.35$12.50$12.35
98Lane arrow (646E20300)EACH4$195.00$195.00$195.00
99Dotted line, 12" (646E20510)FT165$1.45$1.50$1.45
100Yield line (646E20800)FT63$16.90$17.00$16.90
101Law enforcement officer with patrol car for assistance (614E11110)HR120$80.00$135.00$95.00
102Increased barrier delineation (614E11630)FT940$1.98$1.25$1.98
103Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384)EACH2$2,325.49$2,600.00$2,325.00
104Detour signing (614E12420)LS1$25,306$39,500$25,305
105Work zone crossover lighting system, as per plan (614E12757)EACH2$12,975$12,975$33,000
106Work zone raised pavement marker, as per plan (614E12801)EACH325$8.11$9.00$8.11
107Barrier reflector, type 1, bidirectional (614E13310)EACH20$10.68$15.00$10.68
108Object marker, two way (614E13360)EACH20$20.21$30.00$20.00
109Portable changeable message sign, as per plan (614E18601)SNMT20$1,206.57$1,250.00$1,200.00
110Work zone center line, class I (614E21000)MI0.35$3,115.00$3,500.00$3,115.00
111Work zone edge line, class I, 6" (614E22010)MI0.59$2,565.00$2,850.00$2,565.00
112Work zone transverse/diagonal line, class I (614E25000)FT128$8.55$9.50$8.55
113Roads for maintaining traffic (615E10000)LS1$60,000$60,500$145,080
114Pavement for maintaining traffic, class A (615E20000)SY3,902$84.00$60.00$54.50
115Water (616E10000)MGAL10$100.00$10.00$1.00
116Portable barrier, unanchored (622E41100)FT940$40.00$45.00$46.00
117Premium for contract performance bond and for payment bond (103E05000)LS1$16,400$30,000$20,055
118CPM progress schedule (108E10000)LS1$1,000.00$10,000$23,578
119Maintaining traffic (614E11000)LS1$40,000$70,000$71,657
120Construction layout stakes and surveying (623E10000)LS1$27,020$40,000$54,540
121Mobilization (624E10000)LS1$166,500$178,500$192,500
ODOT contract 260287: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of June 11, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy