ODOT contract 260287 bid tabulation
FUL-US 20-19.75 Roundabout (INTERSECTION). Let by Ohio DOT on June 11, 2026, FUL. 3 bids received; low bid $3,332,719 by Miller Bros Const Inc, -12% against the engineer's estimate of $3,783,000.
- Owner
- Ohio DOT
- Letting
- 11 JUN 2026
- Pay items
- 121
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Miller Bros Const Inc | $3,332,719 | Low | -12% |
| 2 | Geddis Paving & Excavating Inc | $3,682,638 | +10% | -3.0% |
| 3 | Vernon Nagel Inc | $3,731,075 | +12% | -1.0% |
Engineer's estimate: $3,783,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Miller Bros Const Inc | 2. Geddis Paving & Excavating Inc | 3. Vernon Nagel Inc |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $60,000 | $3,000.00 | $24,380 |
| 2 | Pavement removed (202E23000) | SY | 8,724 | $20.00 | $15.50 | $11.20 |
| 3 | Pipe removed (202E34900) | FT | 1,120 | $50.00 | $21.00 | $21.00 |
| 4 | Manhole removed (202E58000) | EACH | 2 | $1,100.00 | $335.00 | $335.00 |
| 5 | Catch basin removed (202E58100) | EACH | 4 | $1,200.00 | $235.00 | $310.00 |
| 6 | Removal misc.:concrete sign foundation (202E98100) | EACH | 4 | $600.00 | $375.00 | $625.00 |
| 7 | Excavation (203E10000) | CY | 10,718 | $1.00 | $23.50 | $24.00 |
| 8 | Embankment (203E20000) | CY | 1,852 | $25.00 | $23.50 | $7.00 |
| 9 | Subgrade compaction (204E10000) | SY | 9,911 | $0.50 | $0.75 | $1.00 |
| 10 | Excavation of subgrade (204E13000) | CY | 93 | $40.00 | $30.00 | $48.00 |
| 11 | Granular material, type D (204E30030) | CY | 93 | $65.00 | $60.00 | $54.00 |
| 12 | Proof rolling (204E45000) | HR | 6 | $200.00 | $455.00 | $350.00 |
| 13 | Geotextile fabric (204E50000) | SY | 76 | $8.00 | $5.00 | $3.90 |
| 14 | Cement (206E10500) | TON | 290 | $200.00 | $250.00 | $222.00 |
| 15 | Curing coat (206E11000) | SY | 9,409 | $1.25 | $1.25 | $1.15 |
| 16 | Cement stabilized subgrade, 14 inches deep (206E15020) | SY | 9,409 | $7.00 | $6.00 | $8.64 |
| 17 | Primary project control monument, type A (623E12000) | EACH | 1 | $980.00 | $1,050.00 | $1,200.00 |
| 18 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 20 | $180.00 | $200.00 | $180.00 |
| 19 | Commercial fertilizer (654E11000) | TON | 1.90 | $800.00 | $950.00 | $850.00 |
| 20 | Soil analysis test (659E00100) | EACH | 2 | $60.00 | $70.00 | $70.00 |
| 21 | Topsoil (659E00300) | CY | 1,559 | $13.00 | $61.50 | $78.00 |
| 22 | Seeding and mulching (659E10000) | SY | 14,041 | $0.80 | $1.00 | $0.89 |
| 23 | Repair seeding and mulching (659E14000) | SY | 702 | $0.80 | $1.00 | $0.89 |
| 24 | Inter-seeding (659E15000) | SY | 702 | $0.50 | $0.65 | $0.60 |
| 25 | Lime (659E31000) | ACRE | 2.90 | $0.50 | $39.00 | $35.00 |
| 26 | Water (659E35000) | MGAL | 76 | $0.50 | $1.00 | $1.00 |
| 27 | Slope erosion protection (670E00500) | SY | 3,411 | $1.65 | $2.00 | $1.80 |
| 28 | Storm water pollution prevention plan (832E15000) | LS | 1 | $1,175.00 | $1,300.00 | $3,200.00 |
| 29 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $7,200.00 | $16,100 | $10,700 |
| 30 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $8,815.00 | $16,300 | $10,892 |
| 31 | Erosion control (832E30000) | EACH | 60,000 | $1.00 | $1.00 | $1.00 |
| 32 | Rock channel protection, type C with filter (601E32200) | CY | 20 | $100.00 | $180.00 | $210.00 |
| 33 | Concrete masonry (602E20000) | CY | 4.30 | $3,850.00 | $3,950.00 | $3,890.00 |
| 34 | 6" unclassified pipe underdrains (605E13300) | FT | 454 | $26.00 | $25.00 | $22.00 |
| 35 | 6" base pipe underdrains (605E14000) | FT | 3,093 | $18.00 | $25.00 | $18.00 |
| 36 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 205 | $40.00 | $25.00 | $18.00 |
| 37 | 6" conduit, type E (611E01400) | FT | 200 | $25.00 | $25.00 | $18.00 |
| 38 | 6" conduit, type F (611E01500) | FT | 300 | $29.00 | $25.00 | $14.00 |
| 39 | 12" conduit, type C (611E04600) | FT | 174 | $90.00 | $110.00 | $106.00 |
| 40 | 27" conduit, type D (611E12400) | FT | 48 | $130.00 | $185.00 | $200.00 |
| 41 | 22" X 34" conduit, type B, 706.04 (611E52402) | FT | 109 | $230.00 | $215.00 | $220.00 |
| 42 | 22" X 34" conduit, type C, 706.04 (611E52404) | FT | 24 | $215.00 | $180.00 | $200.00 |
| 43 | 24" X 38" conduit, type B, 706.04 (611E52502) | FT | 79 | $235.00 | $215.00 | $280.00 |
| 44 | 24" X 38" conduit, type C, 706.04 (611E52504) | FT | 73 | $240.00 | $170.00 | $240.00 |
| 45 | Catch basin, no. 3, as per plan (611E98151) | EACH | 5 | $4,600.00 | $3,000.00 | $6,600.00 |
| 46 | Catch basin, no. 3A, as per plan (611E98181) | EACH | 5 | $4,000.00 | $3,550.00 | $5,600.00 |
| 47 | Special - special, river rock with weed barrier (690E98300) | SY | 265 | $100.00 | $112.00 | $35.00 |
| 48 | Full depth pavement sawing (252E01500) | FT | 384 | $4.50 | $7.00 | $1.20 |
| 49 | Pavement planing, asphalt concrete, 1.5" (254E01000) | SY | 4,815 | $2.70 | $4.00 | $2.70 |
| 50 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 115 | $300.00 | $260.00 | $300.00 |
| 51 | Aggregate base (304E20000) | CY | 2,063 | $80.00 | $69.00 | $94.00 |
| 52 | Tack coat (407E10000) | GAL | 644 | $1.00 | $3.00 | $1.00 |
| 53 | Stabilized crushed aggregate (411E10000) | CY | 87 | $90.00 | $120.00 | $80.00 |
| 54 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 100 | $310.00 | $275.00 | $310.00 |
| 55 | Asphalt concrete surface course, 12.5 MM, type A (449), as per plan (442E22101) | CY | 210 | $330.00 | $290.00 | $330.00 |
| 56 | 13" non-reinforced concrete pavement, class QC 1P (452E16010) | SY | 7,395 | $111.50 | $120.00 | $116.00 |
| 57 | Non-reinforced concrete pavement, misc.:9" concret (452E19200) | SY | 1,530 | $111.00 | $145.00 | $118.00 |
| 58 | Combination curb and gutter, type 3, as per plan (609E18001) | FT | 2,676 | $25.50 | $30.00 | $28.00 |
| 59 | Curb, type 4-C (609E24510) | FT | 54 | $34.00 | $38.00 | $38.00 |
| 60 | Curb, type 6 (609E26000) | FT | 104 | $20.00 | $22.00 | $18.00 |
| 61 | Combination curb and gutter, type 9, as per plan (609E31001) | FT | 295 | $24.00 | $26.50 | $24.50 |
| 62 | Curb, type 10, as per plan (609E33001) | FT | 1,944 | $19.00 | $23.00 | $20.00 |
| 63 | Curb, type 10-B (609E33200) | FT | 66 | $22.00 | $24.50 | $24.00 |
| 64 | Rumble strips, transverse (asphalt concrete) (618E39000) | EACH | 10 | $800.00 | $1,070.00 | $220.00 |
| 65 | Connection, fused pull apart (625E00450) | EACH | 24 | $172.25 | $175.00 | $172.25 |
| 66 | Light pole, conventional, AT8B30 (625E10490) | EACH | 12 | $3,402.10 | $3,500.00 | $3,402.10 |
| 67 | Light pole foundation, 24" X 6' deep (625E14000) | EACH | 12 | $1,777.25 | $1,800.00 | $1,777.25 |
| 68 | Bracket arm, 8' (625E17960) | EACH | 12 | $780.95 | $785.00 | $780.95 |
| 69 | No. 10 AWG 600 volt distribution cable (625E23306) | FT | 6,609 | $2.50 | $2.50 | $2.50 |
| 70 | No. 10 AWG pole and bracket cable (625E23400) | FT | 1,548 | $2.50 | $2.50 | $2.50 |
| 71 | Conduit, 1", 725.051 (625E25104) | FT | 1,736 | $3.83 | $4.00 | $3.83 |
| 72 | Conduit, jacked or drilled, 1", 725.04 (625E25900) | FT | 277 | $21.23 | $22.00 | $21.23 |
| 73 | Luminaire, conventional, solid state (LED), 196W, (625E26252) | EACH | 12 | $903.10 | $905.00 | $903.10 |
| 74 | Trench, 24" deep (625E29002) | FT | 1,736 | $9.31 | $10.00 | $9.31 |
| 75 | Pull box, 725.06, size 1.5 (625E30500) | EACH | 6 | $811.50 | $825.00 | $811.50 |
| 76 | Ground rod (625E32000) | EACH | 13 | $262.25 | $270.00 | $262.25 |
| 77 | Power service (625E34000) | EACH | 1 | $11,370 | $12,700 | $11,370 |
| 78 | Underground warning marking tape (625E36010) | FT | 1,736 | $1.83 | $2.00 | $1.83 |
| 79 | Delineator, post surface mounted (620E60000) | EACH | 1 | $89.68 | $100.00 | $80.00 |
| 80 | Delineator, post surface mounted, as per plan (620E60001) | EACH | 3 | $89.68 | $100.00 | $80.00 |
| 81 | RPM (621E00100) | EACH | 216 | $62.15 | $69.00 | $49.00 |
| 82 | Ground mounted support, no. 3 post, as per plan (630E03101) | FT | 680.25 | $17.20 | $19.00 | $17.20 |
| 83 | Sign post reflector, as per plan (630E08601) | EACH | 16 | $60.32 | $67.00 | $58.00 |
| 84 | Sign support assembly, pole mounted (630E79500) | EACH | 2 | $114.96 | $130.00 | $280.00 |
| 85 | Sign, flat sheet (630E80100) | SF | 280.35 | $19.95 | $22.00 | $20.00 |
| 86 | Removal of ground mounted sign and storage (630E85000) | EACH | 34 | $17.03 | $19.00 | $17.00 |
| 87 | Removal of ground mounted sign and reerection (630E85100) | EACH | 13 | $65.48 | $73.00 | $65.50 |
| 88 | Removal of ground mounted post support and storage (630E86006) | EACH | 36 | $22.70 | $25.00 | $22.70 |
| 89 | Removal of structure mounted sign and disposal (630E86310) | EACH | 52 | $7.83 | $8.00 | $7.85 |
| 90 | Removal of wood pole and storage (630E89814) | EACH | 4 | $271.36 | $305.00 | $119.00 |
| 91 | Removal of photoelectric control (631E94480) | EACH | 4 | $50.00 | $670.00 | $50.00 |
| 92 | Edge line, 6" (644E00104) | MI | 0.46 | $6,920.00 | $6,920.00 | $6,920.00 |
| 93 | Center line (644E00300) | MI | 0.35 | $8,985.00 | $8,985.00 | $8,985.00 |
| 94 | Transverse/diagonal line (644E00700) | FT | 230 | $9.75 | $10.00 | $9.75 |
| 95 | Edge line, 6" (646E10010) | MI | 1.12 | $4,760.00 | $4,760.00 | $4,760.00 |
| 96 | Center line (646E10200) | MI | 0.29 | $6,355.00 | $6,355.00 | $6,355.00 |
| 97 | Transverse/diagonal line (646E10600) | FT | 430 | $12.35 | $12.50 | $12.35 |
| 98 | Lane arrow (646E20300) | EACH | 4 | $195.00 | $195.00 | $195.00 |
| 99 | Dotted line, 12" (646E20510) | FT | 165 | $1.45 | $1.50 | $1.45 |
| 100 | Yield line (646E20800) | FT | 63 | $16.90 | $17.00 | $16.90 |
| 101 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 120 | $80.00 | $135.00 | $95.00 |
| 102 | Increased barrier delineation (614E11630) | FT | 940 | $1.98 | $1.25 | $1.98 |
| 103 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 2 | $2,325.49 | $2,600.00 | $2,325.00 |
| 104 | Detour signing (614E12420) | LS | 1 | $25,306 | $39,500 | $25,305 |
| 105 | Work zone crossover lighting system, as per plan (614E12757) | EACH | 2 | $12,975 | $12,975 | $33,000 |
| 106 | Work zone raised pavement marker, as per plan (614E12801) | EACH | 325 | $8.11 | $9.00 | $8.11 |
| 107 | Barrier reflector, type 1, bidirectional (614E13310) | EACH | 20 | $10.68 | $15.00 | $10.68 |
| 108 | Object marker, two way (614E13360) | EACH | 20 | $20.21 | $30.00 | $20.00 |
| 109 | Portable changeable message sign, as per plan (614E18601) | SNMT | 20 | $1,206.57 | $1,250.00 | $1,200.00 |
| 110 | Work zone center line, class I (614E21000) | MI | 0.35 | $3,115.00 | $3,500.00 | $3,115.00 |
| 111 | Work zone edge line, class I, 6" (614E22010) | MI | 0.59 | $2,565.00 | $2,850.00 | $2,565.00 |
| 112 | Work zone transverse/diagonal line, class I (614E25000) | FT | 128 | $8.55 | $9.50 | $8.55 |
| 113 | Roads for maintaining traffic (615E10000) | LS | 1 | $60,000 | $60,500 | $145,080 |
| 114 | Pavement for maintaining traffic, class A (615E20000) | SY | 3,902 | $84.00 | $60.00 | $54.50 |
| 115 | Water (616E10000) | MGAL | 10 | $100.00 | $10.00 | $1.00 |
| 116 | Portable barrier, unanchored (622E41100) | FT | 940 | $40.00 | $45.00 | $46.00 |
| 117 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $16,400 | $30,000 | $20,055 |
| 118 | CPM progress schedule (108E10000) | LS | 1 | $1,000.00 | $10,000 | $23,578 |
| 119 | Maintaining traffic (614E11000) | LS | 1 | $40,000 | $70,000 | $71,657 |
| 120 | Construction layout stakes and surveying (623E10000) | LS | 1 | $27,020 | $40,000 | $54,540 |
| 121 | Mobilization (624E10000) | LS | 1 | $166,500 | $178,500 | $192,500 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of June 11, 2026. Compiled by Mirage Metrics.