ODOT contract 260002 bid tabulation
HEN-US 6/US 24-11.32/04.62 (MAJOR RECONSTRUCTION). Let by Ohio DOT on January 29, 2026, HEN. 3 bids received; low bid $58,367,958 by E S Wagner - Vernon Nagel Joint Venture, +6.6% against the engineer's estimate of $54,741,000.
- Owner
- Ohio DOT
- Letting
- 29 JAN 2026
- Pay items
- 440
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | E S Wagner - Vernon Nagel Joint Venture | $58,367,958 | Low | +7.0% |
| 2 | Miller Bros Const Inc | $59,336,765 | +2.0% | +8.0% |
| 3 | Kokosing Construction Company Inc | $68,046,438 | +17% | +24% |
Engineer's estimate: $54,741,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. E S Wagner - Vernon Nagel Joint Venture | 2. Miller Bros Const Inc | 3. Kokosing Construction Company Inc |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $179,534 | $150,000 | $83,300 |
| 2 | Pavement removed (202E23000) | SY | 313,476 | $10.80 | $12.50 | $12.00 |
| 3 | Concrete median removed (202E30600) | SY | 806 | $23.68 | $8.00 | $15.00 |
| 4 | Concrete barrier removed (202E30700) | FT | 213 | $42.99 | $27.00 | $21.00 |
| 5 | Pipe removed, 24" and under (202E35100) | FT | 4,424 | $21.68 | $26.00 | $21.00 |
| 6 | Pipe removed, over 24" diameter (202E35200) | FT | 200 | $41.73 | $42.00 | $39.00 |
| 7 | Guardrail removed (202E38000) | FT | 18,100 | $3.03 | $3.00 | $3.00 |
| 8 | Guardrail removed, barrier design (202E38300) | FT | 1,550 | $4.04 | $4.00 | $4.00 |
| 9 | Anchor assembly removed, type E (202E42010) | EACH | 39 | $252.53 | $250.00 | $250.00 |
| 10 | Anchor assembly removed, type T (202E42040) | EACH | 37 | $252.53 | $250.00 | $250.00 |
| 11 | Anchor assembly removed, type B (202E42050) | EACH | 4 | $252.53 | $250.00 | $250.00 |
| 12 | Bridge terminal assembly removed (202E47000) | EACH | 46 | $252.53 | $250.00 | $250.00 |
| 13 | Impact attenuator removed (202E47800) | EACH | 18 | $505.05 | $500.00 | $500.00 |
| 14 | Manhole removed (202E58000) | EACH | 6 | $800.00 | $1,000.00 | $1,500.00 |
| 15 | Catch basin removed (202E58100) | EACH | 66 | $800.00 | $300.00 | $700.00 |
| 16 | Monument assembly removed (202E60010) | EACH | 3 | $155.00 | $1,500.00 | $450.00 |
| 17 | Fence removed (202E75000) | FT | 1,396 | $5.05 | $3.25 | $5.00 |
| 18 | Removal misc.: existing concrete RR foundations (202E98000) | LS | 1 | $15,000 | $6,650.00 | $20,000 |
| 19 | Removal misc.: traffic monitoring equipment (202E98000) | LS | 1 | $3,700.00 | $3,700.00 | $4,000.00 |
| 20 | Excavation (203E10000) | CY | 130,189 | $24.56 | $14.20 | $29.00 |
| 21 | Embankment (203E20000) | CY | 11,802 | $1.19 | $6.00 | $3.00 |
| 22 | Granular material, type C (204E30020) | CY | 3,535 | $45.00 | $65.00 | $85.00 |
| 23 | Proof rolling (204E45000) | HR | 171 | $184.00 | $75.00 | $230.00 |
| 24 | Cement (206E10500) | TON | 8,752 | $207.00 | $190.00 | $187.00 |
| 25 | Curing coat (206E11000) | SY | 338,183 | $0.99 | $1.20 | $1.20 |
| 26 | Cement stabilized subgrade, 12 inches deep (206E15010) | SY | 338,183 | $2.51 | $3.25 | $5.50 |
| 27 | Mixture design for chemically stabilized soils (206E30000) | LS | 1 | $137,500 | $90,000 | $45,000 |
| 28 | Guardrail, type MGS (606E15050) | FT | 16,812.50 | $23.64 | $23.40 | $23.40 |
| 29 | Guardrail, type MGS with long posts (606E15100) | FT | 700 | $25.00 | $24.75 | $24.75 |
| 30 | Guardrail, type MGS half post spacing (606E15150) | FT | 25 | $22.22 | $22.00 | $22.00 |
| 31 | Guardrail, barrier design, type MGS (606E15550) | FT | 613 | $26.77 | $26.50 | $26.50 |
| 32 | Anchor assembly, MGS type B (606E26050) | EACH | 15 | $2,272.73 | $2,250.00 | $2,250.00 |
| 33 | Anchor assembly, MGS type E (606E26150) | EACH | 35 | $2,626.26 | $2,600.00 | $2,600.00 |
| 34 | Anchor assembly, MGS type T (606E26550) | EACH | 26 | $1,363.64 | $1,350.00 | $1,350.00 |
| 35 | MGS bridge terminal assembly, type TST-2 (606E34600) | EACH | 18 | $2,424.24 | $2,400.00 | $2,400.00 |
| 36 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 24 | $2,575.76 | $2,550.00 | $2,550.00 |
| 37 | MGS bridge terminal assembly, type 2 (606E35102) | EACH | 4 | $681.82 | $675.00 | $675.00 |
| 38 | Impact attenuator, type 1 (bidirectional) (606E60012) | EACH | 12 | $9,393.94 | $9,300.00 | $9,300.00 |
| 39 | Fence, type CLT (607E23000) | FT | 2,926 | $37.88 | $28.00 | $37.50 |
| 40 | Concrete barrier, single slope, type B1 (622E10100) | FT | 425 | $117.00 | $117.00 | $155.00 |
| 41 | Barrier transition (622E10200) | EACH | 3 | $11,350 | $11,350 | $13,000 |
| 42 | Concrete barrier, type D (622E24000) | FT | 300 | $219.00 | $219.00 | $235.00 |
| 43 | Concrete barrier end section, type D (622E25000) | EACH | 9 | $3,425.00 | $3,425.00 | $3,900.00 |
| 44 | Concrete barrier, end anchorage, reinforced, type B1 (622E25006) | EACH | 2 | $4,325.00 | $4,325.00 | $5,300.00 |
| 45 | Concrete barrier, end anchorage, reinforced, type D (622E25050) | EACH | 9 | $3,525.00 | $3,525.00 | $4,200.00 |
| 46 | Reference monument, type A (623E40500) | EACH | 3 | $245.49 | $500.00 | $600.00 |
| 47 | Conduit, 3", 725.051 (625E25504) | FT | 250 | $30.00 | $30.00 | $12.00 |
| 48 | Pull box, 725.08, 24" (625E30706) | EACH | 4 | $1,400.00 | $1,400.00 | $1,500.00 |
| 49 | Pull box removed (625E31510) | EACH | 4 | $300.00 | $300.00 | $300.00 |
| 50 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 225 | $170.00 | $100.00 | $175.00 |
| 51 | Rock channel protection, type C with filter (601E32200) | CY | 3 | $653.55 | $200.00 | $450.00 |
| 52 | Soil analysis test (659E00100) | EACH | 3 | $50.00 | $100.00 | $50.00 |
| 53 | Topsoil (659E00300) | CY | 23,950 | $17.32 | $7.50 | $12.00 |
| 54 | Seeding and mulching (659E10000) | SY | 215,762 | $0.60 | $0.62 | $0.60 |
| 55 | Repair seeding and mulching (659E14000) | SY | 10,788 | $2.01 | $0.70 | $0.60 |
| 56 | Commercial fertilizer (659E20000) | TON | 29.12 | $850.00 | $800.00 | $850.00 |
| 57 | Lime (659E31000) | ACRE | 4.95 | $5.00 | $5.00 | $5.00 |
| 58 | Water (659E35000) | MGAL | 583 | $1.00 | $0.50 | $1.00 |
| 59 | Mowing (659E40000) | MSF | 485 | $5.00 | $2.50 | $5.00 |
| 60 | Slope erosion protection (670E00500) | SY | 44,574 | $1.80 | $1.80 | $1.80 |
| 61 | Storm water pollution prevention plan (832E15000) | LS | 1 | $9,000.00 | $9,000.00 | $9,000.00 |
| 62 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $10,440 | $41,400 | $40,000 |
| 63 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $23,927 | $23,930 | $31,000 |
| 64 | Erosion control (832E30000) | EACH | 825,000 | $1.00 | $1.00 | $1.00 |
| 65 | Concrete masonry (602E20000) | CY | 12.10 | $4,100.00 | $4,300.00 | $4,200.00 |
| 66 | 6" shallow pipe underdrains with geotextile fabric (605E11110) | FT | 99,647 | $10.80 | $14.50 | $16.00 |
| 67 | 6" unclassified pipe underdrains with geotextile fabric (605E13410) | FT | 2,359 | $23.96 | $15.00 | $22.00 |
| 68 | 6" base pipe underdrains with geotextile fabric (605E14020) | FT | 113,178 | $9.30 | $10.00 | $11.00 |
| 69 | Aggregate drains (605E31100) | FT | 50 | $33.46 | $24.80 | $10.00 |
| 70 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 6,500 | $28.78 | $21.50 | $36.00 |
| 71 | 6" conduit, type F (611E01500) | FT | 50 | $23.74 | $25.00 | $45.00 |
| 72 | 12" conduit, type B, as per plan (611E04401) | FT | 541 | $94.77 | $85.00 | $130.00 |
| 73 | 15" conduit, type B, as per plan (611E05901) | FT | 2,620 | $93.91 | $90.00 | $140.00 |
| 74 | 18" conduit, type B, as per plan (611E07401) | FT | 585 | $103.52 | $102.00 | $150.00 |
| 75 | 30" conduit, type B, as per plan (611E13401) | FT | 196 | $183.53 | $185.00 | $240.00 |
| 76 | Catch basin, no. 3A (611E98180) | EACH | 3 | $4,175.00 | $3,200.00 | $3,800.00 |
| 77 | Catch basin, no. 4 (611E98230) | EACH | 3 | $5,400.00 | $5,200.00 | $6,100.00 |
| 78 | Catch basin, no. 8 (611E98410) | EACH | 51 | $5,968.00 | $5,500.00 | $6,400.00 |
| 79 | Catch basin, no. 8A (611E98434) | EACH | 2 | $7,250.00 | $7,000.00 | $8,500.00 |
| 80 | Catch basin, no. 2-2B (611E98470) | EACH | 2 | $2,785.00 | $2,100.00 | $3,500.00 |
| 81 | Inlet, no. 2-6 (611E98710) | EACH | 3 | $8,900.00 | $5,400.00 | $9,200.00 |
| 82 | Precast reinforced concrete outlet (611E99710) | EACH | 116 | $478.00 | $350.00 | $400.00 |
| 83 | Pavement planing, asphalt concrete, 1 1/2" (254E01000) | SY | 46,033 | $2.20 | $2.20 | $2.20 |
| 84 | Pavement planing, asphalt concrete, 3 1/4" (254E01000) | SY | 22,934 | $3.35 | $3.35 | $3.35 |
| 85 | Pavement planing, asphalt concrete, 3 3/4" (254E01000) | SY | 12,393 | $4.80 | $4.80 | $4.80 |
| 86 | Asphalt concrete base, as per plan (302E66001) | CY | 63,526 | $169.50 | $169.50 | $169.50 |
| 87 | Aggregate base (304E20000) | CY | 55,883 | $59.63 | $59.50 | $73.00 |
| 88 | Tack coat (407E10000) | GAL | 54,917 | $2.75 | $2.75 | $2.75 |
| 89 | Asphalt concrete surface course, 12.5 MM, type A (446), as per plan (442E10001) | CY | 517 | $408.00 | $408.00 | $408.00 |
| 90 | Asphalt concrete intermediate course, 12.5 MM, type A (446) (442E10080) | CY | 14,609 | $187.75 | $187.75 | $187.75 |
| 91 | Asphalt concrete intermediate course, 19 MM, type A (446), as per plan (442E10101) | CY | 775 | $345.00 | $345.00 | $345.00 |
| 92 | Asphalt concrete surface course, 12.5 MM, type A (447), as per plan (442E10301) | CY | 14,057 | $241.00 | $241.00 | $241.00 |
| 93 | 11" non-reinforced concrete pavement, class QC 1P with QC/QA (452E14120) | SY | 35,292 | $99.33 | $99.00 | $130.00 |
| 94 | Curb, type 2-A (609E14000) | FT | 512 | $15.05 | $17.80 | $8.00 |
| 95 | Curb, type 4-C (609E24510) | FT | 226 | $41.33 | $31.00 | $85.00 |
| 96 | Concrete median (609E71000) | SF | 9,120 | $12.13 | $10.40 | $22.00 |
| 97 | Compacted aggregate (617E10100) | CY | 390 | $90.00 | $250.00 | $120.00 |
| 98 | Rumble strips, shoulder (asphalt concrete) (618E40600) | MI | 24.60 | $1,255.87 | $1,500.20 | $1,175.00 |
| 99 | Special - intelligent compaction (IC) (690E98400) | LS | 1 | $320,000 | $320,000 | $320,000 |
| 100 | Special - paver mounted thermal profiling (690E98400) | LS | 1 | $47,000 | $47,000 | $47,000 |
| 101 | Delineator, post ground mounted (620E00500) | EACH | 324 | $75.00 | $75.00 | $75.00 |
| 102 | RPM (621E00100) | EACH | 1,396 | $36.75 | $36.75 | $36.75 |
| 103 | Raised pavement marker removed (621E54000) | EACH | 1,189 | $12.00 | $7.50 | $12.00 |
| 104 | Barrier reflector, type 1, BI-directional (626E00102) | EACH | 1 | $13.13 | $13.00 | $15.00 |
| 105 | Barrier reflector, type 1, one-way (626E00102) | EACH | 1 | $13.13 | $13.00 | $15.00 |
| 106 | Barrier reflector, type 5, BI-directional (626E00116) | EACH | 231 | $13.13 | $13.00 | $15.00 |
| 107 | Barrier reflector, type 5, one-way (626E00116) | EACH | 103 | $13.13 | $13.00 | $15.00 |
| 108 | Ground mounted support, no. 3 post (630E03100) | FT | 335 | $16.00 | $16.00 | $16.00 |
| 109 | Ground mounted structural beam support, W6X9 (630E06500) | FT | 37 | $35.00 | $35.00 | $35.00 |
| 110 | Ground mounted structural beam support, W10X22 (630E07500) | FT | 136 | $70.00 | $70.00 | $70.00 |
| 111 | Ground mounted structural beam support, W10X12 (630E07600) | FT | 43 | $45.00 | $45.00 | $45.00 |
| 112 | Ground mounted structural beam support, W12X30 (630E08000) | FT | 61 | $80.00 | $80.00 | $80.00 |
| 113 | Sign, flat sheet (630E80100) | SF | 281 | $15.00 | $15.00 | $15.00 |
| 114 | Sign, ground mounted extrusheet (630E80200) | SF | 120 | $21.00 | $21.00 | $21.00 |
| 115 | Sign erected, flat sheet (630E81100) | SF | 281 | $3.00 | $3.00 | $3.00 |
| 116 | Sign erected, extrusheet (630E81200) | SF | 120 | $4.00 | $4.00 | $4.00 |
| 117 | Ground mounted structural beam support foundation (630E84500) | EACH | 16 | $1,125.00 | $925.00 | $925.00 |
| 118 | Removal of ground mounted sign and disposal (630E84900) | EACH | 26 | $10.00 | $10.00 | $10.00 |
| 119 | Removal of ground mounted sign and reerection (630E85100) | EACH | 105 | $65.00 | $65.00 | $65.00 |
| 120 | Removal of ground mounted post support and disposal (630E86002) | EACH | 26 | $15.00 | $15.00 | $15.00 |
| 121 | Removal of ground mounted structural beam support (630E86102) | EACH | 12 | $285.00 | $285.00 | $285.00 |
| 122 | Signing, misc.: 6" X 8" solid wood post, as per PL (630E97900) | FT | 119 | $58.00 | $58.00 | $58.00 |
| 123 | Chevron marking, type 1 (642E00720) | FT | 2,472 | $4.00 | $4.00 | $4.00 |
| 124 | Speed measurement marking (642E40000) | EACH | 20 | $100.00 | $100.00 | $100.00 |
| 125 | Wet reflective epoxy pavement marking, edge line, 6" (807E12010) | MI | 32.25 | $5,250.00 | $5,250.00 | $5,250.00 |
| 126 | Wet reflective epoxy pavement marking, lane line, 6" (807E12110) | MI | 12.16 | $1,850.00 | $1,850.00 | $1,850.00 |
| 127 | Wet reflective epoxy pavement marking, channelizing line, 12" (807E12310) | FT | 13,541 | $2.50 | $2.50 | $2.50 |
| 128 | Wet reflective epoxy pavement marking, dotted line, 6" (807E12410) | FT | 14,795 | $1.00 | $1.00 | $1.00 |
| 129 | Grooving for 6" recessed pavement marking, (asphalt) (850E10010) | MI | 39.56 | $1,250.00 | $1,250.00 | $1,250.00 |
| 130 | Grooving for 6" recessed pavement marking, (asphalt) (850E10110) | FT | 14,967 | $1.00 | $1.00 | $1.00 |
| 131 | Grooving for 12" recessed pavement marking, (asphalt) (850E10130) | FT | 13,541 | $1.25 | $1.25 | $1.25 |
| 132 | Grooving for 6" recessed pavement marking, (concrete) (850E20010) | MI | 4.86 | $3,250.00 | $3,250.00 | $3,250.00 |
| 133 | Traffic compacted surface, type A or B (410E12000) | CY | 100 | $39.00 | $50.00 | $80.00 |
| 134 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 1,200 | $80.00 | $85.00 | $135.00 |
| 135 | Increased barrier delineation (614E11630) | FT | 6,835 | $0.56 | $1.25 | $0.75 |
| 136 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 14 | $2,828.28 | $2,280.00 | $14,000 |
| 137 | Detour signing (614E12420) | LS | 1 | $48,000 | $48,000 | $300,000 |
| 138 | Work zone marking sign (614E12460) | EACH | 50 | $150.00 | $150.00 | $800.00 |
| 139 | Work zone increased penalties sign (614E12484) | EACH | 20 | $250.00 | $250.00 | $800.00 |
| 140 | Replacement sign (614E12500) | EACH | 25 | $295.00 | $192.00 | $500.00 |
| 141 | Replacement drum (614E12600) | EACH | 250 | $62.00 | $56.00 | $85.00 |
| 142 | Work zone crossover lighting system (614E12756) | EACH | 20 | $24,750 | $24,750 | $50,000 |
| 143 | Work zone raised pavement marker (614E12800) | EACH | 2,110 | $6.50 | $36.75 | $62.00 |
| 144 | Asphalt concrete for maintaining traffic (614E13000) | CY | 30 | $775.00 | $925.00 | $775.00 |
| 145 | Asphalt concrete for maintaining traffic, as per plan (614E13001) | CY | 282 | $955.00 | $955.00 | $955.00 |
| 146 | Barrier reflector, type 1, BI-directional (614E13310) | EACH | 2,685 | $9.28 | $6.80 | $8.00 |
| 147 | Barrier reflector, type 5, one-way (614E13318) | EACH | 50 | $23.69 | $18.00 | $20.00 |
| 148 | Object marker, one way (614E13350) | EACH | 1,460 | $23.87 | $16.00 | $22.00 |
| 149 | Maintaining traffic, misc.: 6"X8" solid wood post, (614E18000) | EACH | 57 | $1,340.00 | $1,340.00 | $1,340.00 |
| 150 | Maintaining traffic, misc.:sign (flat sheet) (614E18010) | SF | 1,105 | $22.00 | $22.00 | $22.00 |
| 151 | Portable changeable message sign, as per plan (614E18601) | SNMT | 155 | $389.28 | $800.00 | $650.00 |
| 152 | Work zone edge line, class I, 6" (614E22010) | MI | 69.80 | $800.00 | $800.00 | $800.00 |
| 153 | Work zone edge line, class I, 6", 807 paint (614E22056) | MI | 69.80 | $3,000.00 | $3,000.00 | $3,000.00 |
| 154 | Work zone channelizing line, class I, 12" (614E23010) | FT | 16,202 | $1.00 | $1.00 | $1.00 |
| 155 | Work zone channelizing line, class I, 12", 807 paint (614E23110) | FT | 16,202 | $2.00 | $2.00 | $2.00 |
| 157 | Work zone channelizing line, class III, 12", 642 paint (614E23690) | FT | 1,000 | $1.00 | $1.00 | $1.00 |
| 158 | Work zone dotted line, class I (614E24000) | FT | 34,362 | $0.75 | $0.75 | $0.75 |
| 159 | Work zone dotted line, class I, 6", 807 paint (614E24102) | FT | 34,362 | $1.25 | $1.25 | $1.25 |
| 160 | Work zone stop line, class I (614E26000) | FT | 200 | $3.00 | $3.00 | $3.00 |
| 161 | Work zone stop line, class III, 642 paint (614E26610) | FT | 200 | $3.00 | $3.00 | $3.00 |
| 162 | Work zone arrow, class I (614E30000) | EACH | 12 | $125.00 | $125.00 | $125.00 |
| 163 | Work zone arrow, class III, 642 paint (614E30650) | EACH | 12 | $125.00 | $125.00 | $125.00 |
| 164 | Roads for maintaining traffic (615E10000) | LS | 1 | $287,687 | $220,000 | $40,000 |
| 165 | Pavement for maintaining traffic, class A, as per plan (615E20001) | SY | 400 | $84.95 | $90.00 | $150.00 |
| 166 | Water (616E10000) | MGAL | 600 | $100.00 | $35.00 | $100.00 |
| 167 | Portable barrier, 50", as per plan (622E41011) | FT | 63,645 | $15.50 | $20.00 | $30.00 |
| 168 | Dual portable barrier transition/termination (622E41060) | EACH | 2 | $2,000.00 | $4,000.00 | $1,300.00 |
| 169 | Portable barrier, unanchored (622E41100) | FT | 7,198 | $11.00 | $19.50 | $21.50 |
| 170 | Digital speed limit (DSL) sign assembly (808E18700) | SNMT | 527 | $329.04 | $500.00 | $525.00 |
| 171 | Preformed elastomeric compression joint seal (516E10000) | FT | 112 | $28.00 | $15.96 | $55.00 |
| 172 | 2" deep joint sealer (516E31010) | FT | 112 | $25.00 | $5.23 | $30.00 |
| 173 | Superplasticized dense concrete overlay using hydrodemolition, as per plan (848E10201) | SY | 890 | $84.00 | $69.73 | $100.00 |
| 174 | Surface preparation using hydrodemolition (848E20000) | SY | 890 | $103.00 | $102.22 | $90.00 |
| 175 | Superplasticized dense concrete overlay (variable thickness), material only, as per plan (848E30201) | CY | 4 | $250.00 | $256.76 | $225.00 |
| 176 | Hand chipping (848E50000) | SY | 49 | $150.00 | $178.33 | $180.00 |
| 177 | Test slab (848E50100) | LS | 1 | $2,500.00 | $1,556.69 | $1,750.00 |
| 178 | Full-depth repair (848E50200) | CY | 2 | $1,100.00 | $1,520.27 | $2,400.00 |
| 179 | Existing concrete overlay removed (1 1/4") (848E50320) | SY | 890 | $15.00 | $20.80 | $25.00 |
| 180 | Removal of debonded or deteriorated existing variable thickness concrete overlay (848E50340) | SY | 49 | $28.00 | $157.29 | $80.00 |
| 181 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $65,000 | $35,088 | $70,000 |
| 182 | Approach slab removed (202E22900) | SY | 90 | $60.00 | $30.32 | $95.00 |
| 183 | Bridge railing removed (202E38500) | FT | 138 | $8.00 | $8.98 | $10.00 |
| 184 | Epoxy coated steel reinforcement (509E10000) | LB | 16,121 | $1.55 | $1.52 | $2.00 |
| 185 | Concrete reinforcement, replacement of existing concrete reinforcement, as per plan (509E20001) | LB | 200 | $1.55 | $2.03 | $2.50 |
| 186 | Galvanized steel reinforcement (509E26000) | LB | 3,098 | $2.80 | $2.29 | $3.00 |
| 187 | Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001) | EACH | 362 | $25.00 | $20.48 | $62.00 |
| 188 | Class QC2 concrete, superstructure (511E32210) | CY | 50 | $1,200.00 | $1,400.19 | $2,100.00 |
| 189 | Class QC1 concrete, substructure (511E50210) | CY | 16 | $950.00 | $1,152.62 | $1,700.00 |
| 190 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 75 | $30.00 | $31.10 | $36.00 |
| 191 | Preformed elastomeric compression joint seal (516E10000) | FT | 60 | $28.00 | $16.88 | $55.00 |
| 192 | 1/2" preformed expansion joint filler (516E13200) | SF | 50 | $11.00 | $5.83 | $8.00 |
| 193 | 1" preformed expansion joint filler (516E13600) | SF | 81 | $12.00 | $7.50 | $11.00 |
| 194 | Nylon reinforced neoprene sheeting (516E25000) | SF | 42 | $45.00 | $15.00 | $35.00 |
| 195 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $30,000 | $46,938 | $40,000 |
| 196 | Railing (three steel tube bridge railing) (517E70100) | FT | 164 | $436.36 | $432.00 | $450.00 |
| 197 | Porous backfill with geotextile fabric (518E21200) | CY | 14 | $100.00 | $128.30 | $150.00 |
| 198 | Special - steel drip strip (518E22300) | FT | 166 | $16.00 | $16.25 | $22.00 |
| 199 | 6" perforated corrugated plastic pipe, as per plan (518E40001) | FT | 78 | $8.00 | $11.70 | $19.00 |
| 200 | 6" non-perforated corrugated plastic pipe, including specials, as per plan (518E40011) | FT | 7 | $12.00 | $53.62 | $80.00 |
| 201 | Reinforced concrete approach slabs (T=15") (526E25000) | SY | 152 | $360.00 | $393.19 | $430.00 |
| 202 | Type A installation (526E90010) | FT | 60 | $150.00 | $169.07 | $321.09 |
| 203 | Superplasticized dense concrete overlay using hydrodemolition, as per plan (848E10201) | SY | 228 | $145.00 | $144.85 | $100.00 |
| 204 | Surface preparation using hydrodemolition (848E20000) | SY | 131 | $115.00 | $100.94 | $90.00 |
| 205 | Superplasticized dense concrete overlay (variable thickness), material only, as per plan (848E30201) | CY | 1 | $250.00 | $256.76 | $225.00 |
| 206 | Hand chipping (848E50000) | SY | 13 | $150.00 | $173.91 | $180.00 |
| 207 | Test slab (848E50100) | LS | 1 | $2,500.00 | $1,556.69 | $1,750.00 |
| 208 | Full-depth repair (848E50200) | CY | 2 | $1,100.00 | $1,293.21 | $1,800.00 |
| 209 | Existing concrete overlay removed (1 1/4") (848E50320) | SY | 228 | $15.00 | $8.88 | $14.00 |
| 210 | Removal of debonded or deteriorated existing variable thickness concrete overlay (848E50340) | SY | 13 | $28.00 | $114.72 | $80.00 |
| 211 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $65,000 | $39,281 | $72,000 |
| 212 | Approach slab removed (202E22900) | SY | 133 | $60.00 | $29.74 | $95.00 |
| 213 | Bridge railing removed (202E38500) | FT | 159 | $8.00 | $7.94 | $10.00 |
| 214 | Epoxy coated steel reinforcement (509E10000) | LB | 18,494 | $1.55 | $1.51 | $2.00 |
| 215 | Concrete reinforcement, replacement of existing concrete reinforcement, as per plan (509E20001) | LB | 200 | $1.55 | $2.03 | $2.50 |
| 216 | Galvanized steel reinforcement (509E26000) | LB | 3,318 | $2.80 | $2.28 | $3.00 |
| 217 | Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001) | EACH | 396 | $25.00 | $20.72 | $70.00 |
| 218 | Class QC2 concrete, superstructure (511E32210) | CY | 58 | $1,300.00 | $1,456.37 | $2,100.00 |
| 219 | Class QC1 concrete, substructure (511E50210) | CY | 17 | $925.00 | $1,011.91 | $1,700.00 |
| 220 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 95 | $30.00 | $32.45 | $36.00 |
| 221 | Preformed elastomeric compression joint seal (516E10000) | FT | 81 | $72.00 | $16.78 | $55.00 |
| 222 | 1/2" preformed expansion joint filler (516E13200) | SF | 66 | $11.00 | $6.36 | $8.00 |
| 223 | 1" preformed expansion joint filler (516E13600) | SF | 91 | $12.00 | $6.67 | $11.00 |
| 224 | Nylon reinforced neoprene sheeting (516E25000) | SF | 19 | $28.00 | $25.35 | $50.00 |
| 225 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $32,000 | $46,938 | $40,000 |
| 226 | Railing (three steel tube bridge railing) (517E70100) | FT | 180 | $436.36 | $432.00 | $450.00 |
| 227 | Porous backfill with geotextile fabric (518E21200) | CY | 16 | $100.00 | $133.39 | $150.00 |
| 228 | Special - steel drip strip (518E22300) | FT | 179 | $16.00 | $15.85 | $22.00 |
| 229 | 6" perforated corrugated plastic pipe, as per plan (518E40001) | FT | 93 | $8.00 | $11.34 | $19.00 |
| 230 | 6" non-perforated corrugated plastic pipe, including specials, as per plan (518E40011) | FT | 19 | $12.00 | $19.76 | $80.00 |
| 231 | Reinforced concrete approach slabs (T=15") (526E25000) | SY | 223 | $360.00 | $374.08 | $430.00 |
| 232 | Type A installation (526E90010) | FT | 81 | $150.00 | $173.79 | $321.09 |
| 233 | Superplasticized dense concrete overlay using hydrodemolition, as per plan (848E10201) | SY | 354 | $110.00 | $101.72 | $120.00 |
| 234 | Surface preparation using hydrodemolition (848E20000) | SY | 243 | $120.00 | $112.78 | $120.00 |
| 235 | Superplasticized dense concrete overlay (variable thickness), material only, as per plan (848E30201) | CY | 3 | $250.00 | $256.76 | $225.00 |
| 236 | Hand chipping (848E50000) | SY | 19 | $150.00 | $187.57 | $180.00 |
| 237 | Test slab (848E50100) | LS | 1 | $2,500.00 | $1,556.69 | $1,750.00 |
| 238 | Full-depth repair (848E50200) | CY | 4 | $1,100.00 | $1,261.16 | $1,800.00 |
| 241 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $65,000 | $41,337 | $72,000 |
| 242 | Approach slab removed (202E22900) | SY | 133 | $60.00 | $29.74 | $95.00 |
| 243 | Bridge railing removed (202E38500) | FT | 159 | $8.00 | $7.94 | $10.00 |
| 244 | Epoxy coated steel reinforcement (509E10000) | LB | 18,501 | $1.55 | $1.51 | $2.00 |
| 245 | Concrete reinforcement, replacement of existing concrete reinforcement, as per plan (509E20001) | LB | 200 | $1.55 | $1.34 | $2.50 |
| 246 | Galvanized steel reinforcement (509E26000) | LB | 3,318 | $2.80 | $2.28 | $3.00 |
| 247 | Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001) | EACH | 396 | $25.00 | $20.72 | $75.00 |
| 248 | Class QC2 concrete, superstructure (511E32210) | CY | 57 | $1,300.00 | $1,478.59 | $2,100.00 |
| 249 | Class QC1 concrete, substructure (511E50210) | CY | 17 | $950.00 | $996.15 | $1,700.00 |
| 250 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 95 | $30.00 | $32.45 | $36.00 |
| 251 | Preformed elastomeric compression joint seal (516E10000) | FT | 81 | $28.00 | $16.78 | $55.00 |
| 252 | 1/2" preformed expansion joint filler (516E13200) | SF | 66 | $11.00 | $6.36 | $8.00 |
| 253 | 1" preformed expansion joint filler (516E13600) | SF | 94 | $12.00 | $6.46 | $11.00 |
| 254 | Nylon reinforced neoprene sheeting (516E25000) | SF | 31 | $25.00 | $20.32 | $32.00 |
| 255 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $32,000 | $46,938 | $40,000 |
| 256 | Railing (three steel tube bridge railing) (517E70100) | FT | 180 | $436.36 | $432.00 | $450.00 |
| 257 | Porous backfill with geotextile fabric (518E21200) | CY | 16 | $100.00 | $140.81 | $150.00 |
| 258 | Special - steel drip strip (518E22300) | FT | 179 | $16.00 | $15.85 | $22.00 |
| 259 | 6" perforated corrugated plastic pipe, as per plan (518E40001) | FT | 93 | $8.00 | $11.34 | $19.00 |
| 260 | 6" non-perforated corrugated plastic pipe, including specials, as per plan (518E40011) | FT | 19 | $12.00 | $19.76 | $80.00 |
| 261 | Reinforced concrete approach slabs (T=15") (526E25000) | SY | 223 | $360.00 | $374.08 | $430.00 |
| 262 | Type A installation (526E90010) | FT | 81 | $150.00 | $173.79 | $321.09 |
| 263 | Superplasticized dense concrete overlay using hydrodemolition, as per plan (848E10201) | SY | 354 | $110.00 | $101.72 | $120.00 |
| 264 | Surface preparation using hydrodemolition (848E20000) | SY | 243 | $120.00 | $115.22 | $120.00 |
| 265 | Superplasticized dense concrete overlay (variable thickness), material only, as per plan (848E30201) | CY | 3 | $250.00 | $256.76 | $225.00 |
| 266 | Hand chipping (848E50000) | SY | 19 | $150.00 | $187.57 | $180.00 |
| 267 | Test slab (848E50100) | LS | 1 | $2,500.00 | $1,556.69 | $1,750.00 |
| 268 | Full-depth repair (848E50200) | CY | 4 | $1,100.00 | $1,261.16 | $1,800.00 |
| 271 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $140,000 | $120,698 | $180,000 |
| 272 | Special - wick drain (203E07504) | FT | 18,655 | $8.32 | $5.32 | $14.00 |
| 273 | Embankment (203E20000) | CY | 14,353 | $2.50 | $2.23 | $7.00 |
| 274 | Granular embankment, as per plan (203E35001) | CY | 997 | $48.40 | $57.31 | $85.00 |
| 275 | Special - settlement platform (203E65000) | EACH | 4 | $1,350.82 | $3,988.78 | $1,200.00 |
| 276 | Geogrid, type P1 (863E00100) | SY | 3,170 | $5.26 | $3.72 | $7.00 |
| 277 | Reinforced embankment (863E00800) | CY | 1,253 | $2.50 | $15.76 | $7.00 |
| 278 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $225,000 | $186,575 | $200,000 |
| 279 | Approach slab removed (202E22900) | SY | 217 | $60.00 | $27.36 | $95.00 |
| 280 | Aggregate base (304E20000) | CY | 40 | $100.00 | $67.55 | $120.00 |
| 281 | Epoxy coated steel reinforcement (509E10000) | LB | 25,972 | $1.55 | $1.50 | $2.00 |
| 282 | Concrete reinforcement, replacement of existing concrete reinforcement, as per plan (509E20001) | LB | 200 | $1.55 | $2.03 | $2.50 |
| 283 | Galvanized steel reinforcement (509E26000) | LB | 2,028 | $2.80 | $2.29 | $3.00 |
| 284 | No. 4 deformed GFRP reinforcement (509E30020) | FT | 5,152 | $1.85 | $1.49 | $1.75 |
| 285 | Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001) | EACH | 192 | $25.00 | $25.65 | $60.00 |
| 286 | Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001) | EACH | 158 | $25.00 | $33.31 | $62.00 |
| 287 | Semi-integral diaphragm guide (511E33500) | EACH | 2 | $3,000.00 | $3,039.50 | $4,500.00 |
| 288 | Class QC2 concrete, superstructure (511E34410) | CY | 36 | $775.00 | $1,050.14 | $1,400.00 |
| 289 | Class QC2 concrete, bridge deck (511E34444) | CY | 49 | $1,200.00 | $1,474.75 | $1,125.00 |
| 290 | Class QC2 concrete, bridge deck (parapet) (511E34448) | CY | 51 | $675.00 | $635.00 | $1,100.00 |
| 291 | Class QC1 concrete, abutment not including footing (511E44110) | CY | 15 | $675.00 | $682.50 | $1,300.00 |
| 292 | Class QC1 concrete, retaining/wingwall not including footing (511E46010) | CY | 28 | $900.00 | $1,174.01 | $925.00 |
| 293 | Class QC1 concrete, footing (511E46510) | CY | 12 | $600.00 | $734.66 | $1,000.00 |
| 294 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 457 | $30.00 | $35.00 | $36.00 |
| 295 | Field painting, misc.: coating of beam ends (514E27700) | SF | 400 | $115.00 | $140.00 | $140.00 |
| 296 | Preformed elastomeric compression joint seal (516E10000) | FT | 98 | $70.00 | $17.06 | $55.00 |
| 297 | Armorless preformed joint seal (516E10010) | FT | 98 | $50.00 | $46.10 | $80.00 |
| 298 | 1" preformed expansion joint filler (516E13600) | SF | 18 | $12.00 | $7.77 | $11.00 |
| 299 | 2" preformed expansion joint filler (516E13900) | SF | 133 | $12.00 | $9.86 | $12.00 |
| 300 | Nylon reinforced neoprene sheeting (516E25000) | SF | 377 | $25.00 | $12.68 | $20.00 |
| 301 | Elastomeric bearing with internal laminates and load plate (516E44100) | EACH | 10 | $1,600.00 | $1,935.04 | $3,000.00 |
| 302 | Elastomeric bearing with internal laminates and load plate (516E44300) | EACH | 5 | $2,800.00 | $2,783.21 | $6,000.00 |
| 303 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $55,000 | $52,836 | $33,000 |
| 304 | Porous backfill with geotextile fabric (518E21200) | CY | 106 | $100.00 | $92.61 | $150.00 |
| 305 | 6" perforated corrugated plastic pipe, as per plan (518E40001) | FT | 120 | $8.00 | $11.41 | $19.00 |
| 306 | 6" non-perforated corrugated plastic pipe, including specials, as per plan (518E40011) | FT | 72 | $12.00 | $17.62 | $80.00 |
| 307 | Reinforced concrete approach slabs (T=15") (526E25000) | SY | 230 | $360.00 | $381.77 | $430.00 |
| 308 | Type C installation (526E90030) | FT | 98 | $150.00 | $291.68 | $300.00 |
| 309 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 4 | $175.00 | $223.80 | $350.00 |
| 310 | Precast reinforced concrete outlet (611E99710) | EACH | 4 | $350.00 | $420.59 | $400.00 |
| 311 | Superplasticized dense concrete overlay using hydrodemolition, as per plan (848E10201) | SY | 619 | $90.00 | $81.52 | $100.00 |
| 312 | Surface preparation using hydrodemolition (848E20000) | SY | 521 | $100.00 | $101.77 | $90.00 |
| 313 | Superplasticized dense concrete overlay (variable thickness), material only, as per plan (848E30201) | CY | 3 | $250.00 | $256.76 | $225.00 |
| 314 | Hand chipping (848E50000) | SY | 37 | $150.00 | $187.48 | $180.00 |
| 315 | Test slab (848E50100) | LS | 1 | $2,500.00 | $1,556.69 | $1,750.00 |
| 316 | Full-depth repair (848E50200) | CY | 6 | $1,100.00 | $1,891.00 | $2,400.00 |
| 317 | Existing concrete overlay removed (1 1/4" thick) (848E50320) | SY | 671 | $10.00 | $16.85 | $12.50 |
| 318 | Removal of debonded or deteriorated existing variable thickness concrete overlay (848E50340) | SY | 37 | $25.00 | $142.82 | $80.00 |
| 319 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $235,000 | $223,186 | $250,000 |
| 320 | Approach slab removed (202E22900) | SY | 317 | $60.00 | $27.33 | $95.00 |
| 321 | Aggregate base (304E20000) | CY | 57 | $100.00 | $61.60 | $73.00 |
| 322 | Epoxy coated steel reinforcement (509E10000) | LB | 30,239 | $1.55 | $1.50 | $2.00 |
| 323 | Concrete reinforcement, replacement of existing concrete reinforcement, as per plan (509E20001) | LB | 200 | $1.55 | $2.03 | $2.50 |
| 324 | Galvanized steel reinforcement (509E26000) | LB | 2,477 | $2.80 | $2.26 | $3.00 |
| 325 | No. 4 deformed GFRP reinforcement (509E30020) | FT | 5,073 | $1.80 | $1.49 | $1.75 |
| 326 | Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001) | EACH | 154 | $25.00 | $40.25 | $60.00 |
| 327 | Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001) | EACH | 218 | $25.00 | $27.91 | $60.00 |
| 328 | Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001) | EACH | 165 | $25.00 | $33.81 | $62.00 |
| 329 | Semi-integral diaphragm guide (511E33500) | EACH | 2 | $2,800.00 | $3,039.50 | $4,500.00 |
| 330 | Class QC2 concrete, superstructure (511E34410) | CY | 61 | $750.00 | $672.82 | $950.00 |
| 331 | Class QC2 concrete, bridge deck (511E34444) | CY | 43 | $1,200.00 | $1,992.37 | $1,400.00 |
| 332 | Class QC2 concrete, bridge deck (parapet) (511E34448) | CY | 50 | $650.00 | $635.00 | $1,100.00 |
| 333 | Class QC1 concrete, abutment not including footing (511E44110) | CY | 28 | $700.00 | $732.42 | $1,300.00 |
| 334 | Class QC1 concrete, retaining/wingwall not including footing (511E46010) | CY | 30 | $900.00 | $1,158.56 | $1,000.00 |
| 335 | Class QC1 concrete, footing (511E46510) | CY | 12 | $600.00 | $735.02 | $1,000.00 |
| 336 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 469 | $30.00 | $35.00 | $36.00 |
| 337 | Field painting, misc.: coating of beam ends (514E27700) | SF | 561 | $115.00 | $135.00 | $135.00 |
| 338 | Preformed elastomeric compression joint seal (516E10000) | FT | 149 | $28.00 | $17.52 | $55.00 |
| 339 | Armorless preformed joint seal (516E10010) | FT | 144 | $50.00 | $46.32 | $60.00 |
| 340 | 1" preformed expansion joint filler (516E13600) | SF | 18 | $12.00 | $7.77 | $11.00 |
| 341 | Preformed expansion joint filler, misc.: (3") (516E14000) | SF | 100 | $12.00 | $12.67 | $30.00 |
| 342 | Nylon reinforced neoprene sheeting (516E25000) | SF | 508 | $28.00 | $12.40 | $20.00 |
| 343 | Elastomeric bearing with internal laminates and load plate (516E44100) | EACH | 14 | $1,700.00 | $1,935.04 | $3,000.00 |
| 344 | Elastomeric bearing with internal laminates and load plate (516E44300) | EACH | 7 | $2,600.00 | $2,783.21 | $6,000.00 |
| 345 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $65,000 | $57,836 | $45,000 |
| 346 | Porous backfill with geotextile fabric (518E21200) | CY | 149 | $100.00 | $95.46 | $150.00 |
| 347 | 6" perforated corrugated plastic pipe, as per plan (518E40001) | FT | 159 | $8.00 | $11.48 | $19.00 |
| 348 | 6" non-perforated corrugated plastic pipe, including specials, as per plan (518E40011) | FT | 72 | $12.00 | $20.85 | $80.00 |
| 349 | Reinforced concrete approach slabs (T=15") (526E25000) | SY | 326 | $360.00 | $381.38 | $430.00 |
| 350 | Type C installation (526E90030) | FT | 144 | $150.00 | $272.00 | $300.00 |
| 351 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 4 | $180.00 | $223.80 | $350.00 |
| 352 | Precast reinforced concrete outlet (611E99710) | EACH | 4 | $350.00 | $420.59 | $400.00 |
| 353 | Superplasticized dense concrete overlay using hydrodemolition, as per plan (848E10201) | SY | 931 | $75.00 | $61.38 | $100.00 |
| 354 | Surface preparation using hydrodemolition (848E20000) | SY | 736 | $100.00 | $102.82 | $90.00 |
| 355 | Superplasticized dense concrete overlay (variable thickness), material only, as per plan (848E30201) | CY | 4 | $250.00 | $256.76 | $225.00 |
| 356 | Hand chipping (848E50000) | SY | 51 | $150.00 | $167.09 | $180.00 |
| 357 | Test slab (848E50100) | LS | 1 | $2,500.00 | $1,556.69 | $1,750.00 |
| 358 | Full-depth repair (848E50200) | CY | 6 | $1,100.00 | $1,891.00 | $2,400.00 |
| 359 | Existing concrete overlay removed (1 1/4") (848E50320) | SY | 931 | $15.00 | $17.61 | $14.00 |
| 360 | Removal of debonded or deteriorated existing variable thickness concrete overlay (848E50340) | SY | 51 | $30.00 | $90.36 | $80.00 |
| 361 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $70,000 | $53,930 | $77,000 |
| 362 | Approach slab removed (202E22900) | SY | 199 | $60.00 | $28.46 | $95.00 |
| 363 | Bridge railing removed (202E38500) | FT | 163 | $8.00 | $7.77 | $10.00 |
| 364 | Epoxy coated steel reinforcement (509E10000) | LB | 23,357 | $1.55 | $1.50 | $2.00 |
| 365 | Concrete reinforcement, replacement of existing concrete reinforcement, as per plan (509E20001) | LB | 200 | $1.55 | $2.03 | $2.50 |
| 366 | Galvanized steel reinforcement (509E26000) | LB | 3,792 | $2.80 | $2.26 | $3.00 |
| 367 | Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001) | EACH | 466 | $25.00 | $20.99 | $62.00 |
| 368 | Class QC2 concrete, superstructure (511E32210) | CY | 62 | $1,200.00 | $1,297.82 | $2,100.00 |
| 369 | Class QC1 concrete, substructure (511E50210) | CY | 31 | $900.00 | $965.03 | $1,700.00 |
| 370 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 112 | $30.00 | $29.84 | $36.00 |
| 371 | Preformed elastomeric compression joint seal (516E10000) | FT | 105 | $28.00 | $17.29 | $55.00 |
| 372 | 1/2" preformed expansion joint filler (516E13200) | SF | 83 | $11.00 | $6.60 | $8.00 |
| 373 | 1" preformed expansion joint filler (516E13600) | SF | 119 | $12.00 | $7.05 | $11.00 |
| 374 | Nylon reinforced neoprene sheeting (516E25000) | SF | 53 | $42.00 | $14.68 | $28.00 |
| 375 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $35,000 | $46,938 | $40,000 |
| 376 | Railing (three steel tube bridge railing) (517E70100) | FT | 194 | $436.36 | $432.00 | $450.00 |
| 377 | Porous backfill with geotextile fabric (518E21200) | CY | 29 | $100.00 | $121.69 | $150.00 |
| 378 | Special - steel drip strip (518E22300) | FT | 198 | $16.00 | $16.28 | $22.00 |
| 379 | 6" perforated corrugated plastic pipe, as per plan (518E40001) | FT | 125 | $8.00 | $12.09 | $19.00 |
| 380 | 6" non-perforated corrugated plastic pipe, including specials, as per plan (518E40011) | FT | 10 | $12.00 | $37.54 | $80.00 |
| 381 | Reinforced concrete approach slabs (T=15") (526E25000) | SY | 280 | $360.00 | $375.72 | $430.00 |
| 382 | Type A installation (526E90010) | FT | 106 | $150.00 | $171.32 | $321.09 |
| 383 | Superplasticized dense concrete overlay using hydrodemolition, as per plan (848E10201) | SY | 478 | $100.00 | $87.22 | $100.00 |
| 384 | Surface preparation using hydrodemolition (848E20000) | SY | 357 | $100.00 | $101.56 | $90.00 |
| 385 | Superplasticized dense concrete overlay (variable thickness), material only, as per plan (848E30201) | CY | 2 | $250.00 | $256.76 | $225.00 |
| 386 | Hand chipping (848E50000) | SY | 26 | $150.00 | $168.04 | $180.00 |
| 387 | Test slab (848E50100) | LS | 1 | $2,500.00 | $1,556.69 | $1,750.00 |
| 388 | Full-depth repair (848E50200) | CY | 4 | $1,100.00 | $1,256.95 | $1,800.00 |
| 389 | Existing concrete overlay removed (1 1/4") (848E50320) | SY | 478 | $15.00 | $12.31 | $14.00 |
| 390 | Removal of debonded or deteriorated existing variable thickness concrete overlay (848E50340) | SY | 26 | $30.00 | $105.17 | $80.00 |
| 391 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $75,000 | $55,169 | $80,000 |
| 392 | Approach slab removed (202E22900) | SY | 255 | $60.00 | $29.16 | $95.00 |
| 393 | Bridge railing removed (202E38500) | FT | 163 | $8.00 | $7.77 | $10.00 |
| 394 | Epoxy coated steel reinforcement (509E10000) | LB | 23,779 | $1.55 | $1.50 | $2.00 |
| 395 | Concrete reinforcement, replacement of existing concrete reinforcement, as per plan (509E20001) | LB | 200 | $1.55 | $2.03 | $2.50 |
| 396 | Galvanized steel reinforcement (509E26000) | LB | 3,910 | $2.80 | $2.25 | $3.00 |
| 397 | Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001) | EACH | 475 | $25.00 | $21.45 | $70.00 |
| 398 | Class QC2 concrete, superstructure (511E32210) | CY | 66 | $1,100.00 | $1,236.85 | $2,100.00 |
| 399 | Class QC1 concrete, substructure (511E50210) | CY | 23 | $1,000.00 | $957.94 | $1,700.00 |
| 400 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 104 | $30.00 | $29.71 | $36.00 |
| 401 | Preformed elastomeric compression joint seal (516E10000) | FT | 130 | $28.00 | $17.54 | $55.00 |
| 402 | 1/2" preformed expansion joint filler (516E13200) | SF | 99 | $11.00 | $6.47 | $8.00 |
| 403 | 1" preformed expansion joint filler (516E13600) | SF | 128 | $12.00 | $6.93 | $11.00 |
| 404 | Nylon reinforced neoprene sheeting (516E25000) | SF | 39 | $28.00 | $16.15 | $35.00 |
| 405 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $35,000 | $46,938 | $40,000 |
| 406 | Railing (three steel tube bridge railing) (517E70100) | FT | 197 | $436.36 | $432.00 | $450.00 |
| 407 | Porous backfill with geotextile fabric (518E21200) | CY | 26 | $100.00 | $134.00 | $150.00 |
| 408 | Special - steel drip strip (518E22300) | FT | 199 | $16.00 | $16.25 | $22.00 |
| 409 | 6" perforated corrugated plastic pipe, as per plan (518E40001) | FT | 143 | $8.00 | $12.16 | $19.00 |
| 410 | 6" non-perforated corrugated plastic pipe, including specials, as per plan (518E40011) | FT | 6 | $12.00 | $62.56 | $80.00 |
| 411 | Reinforced concrete approach slabs (T=15") (526E25000) | SY | 336 | $360.00 | $370.89 | $430.00 |
| 412 | Type A installation (526E90010) | FT | 126 | $150.00 | $171.85 | $321.09 |
| 413 | Superplasticized dense concrete overlay using hydrodemolition, as per plan (848E10201) | SY | 579 | $95.00 | $83.86 | $100.00 |
| 414 | Surface preparation using hydrodemolition (848E20000) | SY | 451 | $100.00 | $102.87 | $90.00 |
| 415 | Superplasticized dense concrete overlay (variable thickness), material only, as per plan (848E30201) | CY | 3 | $250.00 | $256.76 | $225.00 |
| 416 | Hand chipping (848E50000) | SY | 32 | $150.00 | $325.22 | $180.00 |
| 417 | Test slab (848E50100) | LS | 1 | $2,500.00 | $1,556.69 | $1,750.00 |
| 418 | Full-depth repair (848E50200) | CY | 4 | $1,100.00 | $1,256.95 | $1,800.00 |
| 419 | Existing concrete overlay removed(1 1/4") (848E50320) | SY | 579 | $15.00 | $12.37 | $14.00 |
| 420 | Removal of debonded or deteriorated existing variable thickness concrete overlay (848E50340) | SY | 32 | $30.00 | $112.35 | $80.00 |
| 421 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $236,306 | $200,000 | $500,000 |
| 422 | CPM progress schedule (108E10000) | LS | 1 | $20,000 | $3,500.00 | $12,000 |
| 423 | Maintaining traffic (614E11000) | LS | 1 | $1,395,444 | $2,516,000 | $1,340,000 |
| 424 | Field office, type C, as per plan (619E16021) | MNTH | 31 | $6,900.00 | $6,250.00 | $16,000 |
| 425 | Construction layout stakes and surveying (623E10000) | LS | 1 | $185,307 | $235,500 | $475,000 |
| 426 | Mobilization (624E10000) | LS | 1 | $2,918,398 | $2,967,300 | $3,400,000 |
| 500 | Removal of ground mounted post support and reerection (630E86010) | EACH | 90 | $110.00 | $110.00 | $110.00 |
| 501 | Sign post reflector, as per plan (630E08601) | EACH | 104 | $45.00 | $45.00 | $45.00 |
| 502 | Island marking, type 1 (642E00900) | SF | 160 | $4.00 | $4.00 | $4.00 |
| 503 | Stop line (646E10400) | FT | 172 | $12.00 | $12.00 | $12.00 |
| 504 | Lane arrow (646E20300) | EACH | 20 | $150.00 | $150.00 | $150.00 |
| 505 | Grooving for 4" recessed pavement marking, (asphalt) (850E10100) | FT | 250 | $1.00 | $1.00 | $1.00 |
| 506 | Wet reflective epoxy pavement marking, dotted line, 4" (807E12400) | FT | 250 | $2.00 | $2.00 | $2.00 |
| 507 | Guardrail removed for reuse (202E38200) | FT | 150 | $3.03 | $3.00 | $3.00 |
| 508 | Guardrail removed for reuse, barrier design (202E38410) | FT | 1,075 | $4.04 | $4.00 | $4.00 |
| 509 | Guardrail rebuilt, type 5 (606E16500) | FT | 150 | $9.09 | $9.00 | $9.00 |
| 510 | Guardrail rebuilt, barrier design, type 5 (606E16600) | FT | 1,075 | $14.14 | $14.00 | $14.00 |
| 511 | Catch basin adjusted to grade (611E98630) | EACH | 10 | $840.00 | $450.00 | $1,000.00 |
| 512 | Inspection and compaction testing of unbound materials (878E25000) | LS | 1 | $236,103 | $66,950 | $325,000 |
| 513 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 383 | $264.00 | $265.00 | $265.00 |
| 514 | 18" conduit, type A, as per plan (611E07201) | FT | 104 | $203.93 | $120.00 | $170.00 |
| 515 | 21" conduit, type B, as per plan (611E08901) | FT | 75 | $170.78 | $125.00 | $200.00 |
| 516 | Work zone lane line, class I, 6" (614E20010) | MI | 2.97 | $750.00 | $750.00 | $750.00 |
| 517 | Work zone lane line, class I, 6", 807 paint (614E20056) | MI | 2.97 | $2,000.00 | $2,000.00 | $2,000.00 |
| 518 | Pavement for maintaining traffic, class A (615E20000) | SY | 32,059 | $73.53 | $79.00 | $79.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 29, 2026. Compiled by Mirage Metrics.