ODOT contract 250036 bid tabulation
HOL-SR 515-00.00 (PART 1 AND PART 2) (MINOR RECONSTRUCTION). Let by Ohio DOT on January 16, 2025, HOL. 4 bids received; low bid $5,847,883 by Shelly Company, -25% against the engineer's estimate of $7,777,000.
- Owner
- Ohio DOT
- Letting
- 16 JAN 2025
- Pay items
- 136
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Shelly Company | $5,847,883 | Low | -25% |
| 2 | Kokosing Construction Company Inc | $6,234,366 | +7.0% | -20% |
| 3 | Karvo Companies Inc | $6,258,238 | +7.0% | -20% |
| 4 | Shelly & Sands Inc | $6,468,236 | +11% | -17% |
Engineer's estimate: $7,777,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelly Company | 2. Kokosing Construction Company Inc | 3. Karvo Companies Inc | 4. Shelly & Sands Inc |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $2,500.00 | $2,340.00 | $2,340.00 | $10,000 |
| 2 | Pavement removed (202E23000) | SY | 95 | $100.00 | $80.00 | $75.00 | $30.00 |
| 3 | Wearing course removed (202E23500) | SY | 4,768 | $17.00 | $5.00 | $10.00 | $15.00 |
| 4 | Guardrail removed (202E38000) | FT | 1,950 | $2.00 | $2.00 | $2.00 | $2.00 |
| 5 | Embankment, as per plan (203E20001) | CY | 24 | $63.00 | $63.00 | $63.00 | $65.00 |
| 6 | Excavation of subgrade (204E13000) | CY | 1,995 | $50.00 | $15.00 | $25.00 | $22.00 |
| 8 | Geotextile fabric (204E50000) | SY | 3,390 | $5.00 | $2.00 | $1.00 | $0.60 |
| 9 | Linear grading (209E60500) | MI | 10.63 | $1,650.00 | $7,000.00 | $2,000.00 | $3,000.00 |
| 10 | Preparing subgrade for shoulder paving, as per plan (209E72051) | MI | 10.63 | $5,200.00 | $150.00 | $2,000.00 | $1,200.00 |
| 11 | Guardrail, type 5 (606E13000) | FT | 300 | $18.00 | $18.00 | $18.00 | $19.00 |
| 12 | Guardrail, type MGS (606E15050) | FT | 1,775 | $18.00 | $18.00 | $18.00 | $19.00 |
| 13 | Anchor assembly, MGS type E (MASH 2016 or NCHRP 35 (606E26150) | EACH | 12 | $2,350.00 | $2,350.00 | $2,350.00 | $2,500.00 |
| 14 | Anchor assembly, MGS type T (606E26550) | EACH | 4 | $1,100.00 | $1,100.00 | $1,100.00 | $1,100.00 |
| 15 | Bridge terminal assembly, type 4 (606E35140) | EACH | 12 | $1,150.00 | $1,150.00 | $1,150.00 | $1,200.00 |
| 16 | Special - mailbox removed and reset (690E50350) | EACH | 10 | $200.00 | $300.00 | $400.00 | $250.00 |
| 17 | Soil analysis test (659E00100) | EACH | 2 | $125.00 | $125.00 | $125.00 | $130.00 |
| 18 | Seeding and mulching (659E10000) | SY | 22,000 | $0.70 | $0.69 | $0.69 | $0.70 |
| 19 | Repair seeding and mulching (659E14000) | SY | 1,100 | $0.80 | $0.80 | $0.80 | $0.80 |
| 20 | Commercial fertilizer (659E20000) | TON | 2.97 | $895.00 | $897.99 | $897.99 | $900.00 |
| 21 | Lime (659E31000) | ACRE | 4.55 | $155.00 | $154.68 | $154.68 | $160.00 |
| 22 | Water (659E35000) | MGAL | 119 | $1.00 | $1.00 | $1.00 | $1.00 |
| 23 | Erosion control (832E30000) | EACH | 10,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 24 | Pavement planing, asphalt concrete, as per plan (5 (254E01001) | SY | 6,214 | $7.00 | $7.00 | $7.00 | $8.00 |
| 25 | Tack coat (407E10000) | GAL | 12,170 | $3.00 | $2.30 | $2.75 | $3.50 |
| 26 | Prime coat, as per plan (408E10001) | GAL | 4,958 | $5.00 | $4.45 | $5.75 | $5.00 |
| 27 | Asphalt concrete surface course, type 1, (446), PG70-22M (441E10100) | CY | 3,017 | $230.00 | $225.00 | $235.00 | $250.00 |
| 28 | Asphalt concrete intermediate course, type 2, (446) (441E10200) | CY | 8,976 | $155.00 | $210.00 | $165.00 | $190.00 |
| 29 | Asphalt concrete intermediate course, type 1, (449) (441E70200) | CY | 8 | $500.00 | $800.00 | $350.00 | $195.00 |
| 30 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 84 | $450.00 | $380.00 | $165.00 | $190.00 |
| 31 | Asphalt concrete surface course, type 1, (449), (driveways), as per plan (441E70501) | CY | 186 | $650.00 | $275.00 | $375.00 | $460.00 |
| 32 | Asphalt concrete intermediate course, type 1, (449), (under guardrail) (441E70800) | CY | 2 | $2,200.00 | $1,300.00 | $500.00 | $350.00 |
| 33 | Compacted aggregate, as per plan (617E10101) | CY | 1,378 | $65.00 | $60.00 | $68.00 | $48.00 |
| 34 | Pavement removed (827E10000) | SY | 79,683 | $3.50 | $3.50 | $6.00 | $4.50 |
| 35 | Cement (827E11000) | TON | 2,804 | $195.00 | $195.00 | $180.00 | $180.00 |
| 36 | Curing coat (827E12000) | SY | 79,683 | $1.15 | $1.15 | $1.00 | $1.00 |
| 37 | Full depth reclaimed base course, 12" deep (827E20000) | SY | 79,683 | $3.75 | $3.75 | $5.15 | $5.15 |
| 38 | Mixture design for full depth reclaimed base (827E21000) | LS | 1 | $15,000 | $15,000 | $30,000 | $24,000 |
| 39 | Corrective material (827E22000) | TON | 405 | $33.00 | $40.00 | $34.25 | $34.25 |
| 40 | Cover aggregate (827E23000) | TON | 608 | $32.00 | $40.00 | $21.75 | $43.52 |
| 41 | Just-in-time training (827E30000) | LS | 1 | $1,500.00 | $1,000.00 | $1,750.00 | $1,750.00 |
| 42 | RPM (621E00100) | EACH | 755 | $35.00 | $35.00 | $37.00 | $38.00 |
| 43 | Raised pavement marker removed (621E54000) | EACH | 739 | $6.15 | $4.00 | $1.00 | $8.00 |
| 44 | Barrier reflector, type 1 (BI-directional) (626E00102) | EACH | 6 | $13.00 | $13.00 | $13.00 | $13.00 |
| 45 | Barrier reflector, type 2 (BI-directional) (626E00110) | EACH | 40 | $13.00 | $13.00 | $13.00 | $13.00 |
| 46 | Ground mounted support, no. 2 post (630E02100) | FT | 84 | $13.00 | $13.00 | $13.00 | $14.00 |
| 47 | Sign, flat sheet (630E80100) | SF | 18 | $20.00 | $20.00 | $20.00 | $21.00 |
| 48 | Removal of ground mounted sign and disposal (630E84900) | EACH | 7 | $15.00 | $15.00 | $15.00 | $16.00 |
| 49 | Removal of ground mounted post support and disposal (630E86002) | EACH | 6 | $15.00 | $15.00 | $15.00 | $16.00 |
| 50 | Edge line, 6" (646E10010) | MI | 10.98 | $2,750.00 | $2,750.00 | $2,750.00 | $2,900.00 |
| 51 | Center line (646E10200) | MI | 5.53 | $3,950.00 | $3,950.00 | $3,950.00 | $4,200.00 |
| 52 | Channelizing line, 8" (646E10300) | FT | 220 | $1.00 | $1.00 | $1.00 | $1.00 |
| 53 | Stop line (646E10400) | FT | 57 | $12.00 | $12.00 | $12.00 | $12.00 |
| 54 | Crosswalk line, 24" (646E10520) | FT | 144 | $12.00 | $12.00 | $12.00 | $12.00 |
| 55 | Transverse/diagonal line (646E10600) | FT | 60 | $12.00 | $12.00 | $12.00 | $12.00 |
| 56 | Lane arrow (646E20300) | EACH | 4 | $175.00 | $175.00 | $175.00 | $180.00 |
| 57 | Dotted line, 6" (646E20504) | FT | 198 | $1.00 | $1.00 | $1.00 | $1.00 |
| 58 | Removal of pavement marking (646E50100) | FT | 96 | $20.00 | $20.00 | $20.00 | $20.00 |
| 59 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $5,400.00 | $5,386.65 | $5,386.65 | $5,700.00 |
| 60 | Wearing course removed (202E23500) | SY | 289 | $16.00 | $30.00 | $35.00 | $10.00 |
| 61 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 64 | $39.25 | $39.21 | $39.21 | $42.00 |
| 62 | Concrete repair by epoxy injection (512E10600) | FT | 14 | $80.90 | $80.87 | $80.87 | $86.00 |
| 63 | Type 3 waterproofing (512E33010) | SY | 196 | $52.30 | $52.28 | $52.28 | $56.00 |
| 64 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 25 | $19.30 | $19.28 | $19.28 | $21.00 |
| 65 | Deep beam bridge retrofit railing (517E75600) | FT | 112.50 | $101.00 | $101.00 | $101.00 | $108.00 |
| 66 | Special - composite fiber wrap system (519E00100) | SF | 82 | $200.60 | $200.58 | $200.58 | $214.00 |
| 67 | Special - structures (keyway grout repair) (530E01300) | FT | 358 | $14.95 | $14.92 | $14.92 | $16.00 |
| 68 | Structure grounding system (625E33000) | EACH | 1 | $10,395 | $10,395 | $10,395 | $10,000 |
| 69 | Patching concrete structures with trowelable mortar, as per plan (843E50001) | SF | 20 | $147.70 | $147.66 | $147.66 | $158.00 |
| 70 | Polymer modified asphalt expansion joint system (846E00110) | CF | 45 | $524.75 | $524.75 | $524.75 | $560.00 |
| 71 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $2,000.00 | $1,953.30 | $1,953.30 | $2,000.00 |
| 72 | Wearing course removed (202E23500) | SY | 96 | $45.00 | $80.00 | $15.00 | $1.50 |
| 73 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 55 | $38.10 | $38.10 | $38.10 | $40.00 |
| 74 | Type 3 waterproofing (512E33010) | SY | 114 | $52.30 | $52.28 | $52.28 | $56.00 |
| 75 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 55 | $21.65 | $21.62 | $21.62 | $23.00 |
| 76 | Deep beam bridge retrofit railing (517E75600) | FT | 62.50 | $101.00 | $101.00 | $101.00 | $108.00 |
| 77 | Structure grounding system (625E33000) | EACH | 1 | $10,395 | $10,395 | $10,395 | $10,000 |
| 78 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $3,300.00 | $3,228.00 | $3,228.00 | $3,400.00 |
| 79 | Wearing course removed (202E23500) | SY | 304 | $14.95 | $25.00 | $10.00 | $1.50 |
| 80 | Type 3 waterproofing (512E33010) | SY | 223 | $52.30 | $52.28 | $52.28 | $56.00 |
| 81 | Deep beam bridge retrofit railing (517E75600) | FT | 150 | $101.00 | $101.00 | $101.00 | $108.00 |
| 82 | Patching concrete bridge deck - type A (519E12200) | SY | 5 | $725.40 | $725.40 | $725.40 | $774.00 |
| 83 | Structure grounding system (625E33000) | EACH | 1 | $10,395 | $10,395 | $10,395 | $10,000 |
| 84 | Polymer modified asphalt expansion joint system (846E00110) | CF | 37 | $529.00 | $529.00 | $529.00 | $564.00 |
| 85 | Traffic compacted surface, type A or B (410E12000) | CY | 50 | $70.00 | $90.00 | $200.00 | $85.00 |
| 86 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 2,000 | $100.00 | $80.00 | $75.00 | $90.00 |
| 87 | Detour signing (614E12420) | LS | 1 | $5,250.00 | $5,250.00 | $5,250.00 | $6,000.00 |
| 88 | Work zone marking sign (614E12460) | EACH | 25 | $55.00 | $55.00 | $55.00 | $60.00 |
| 89 | Asphalt concrete for maintaining traffic (614E13000) | CY | 810 | $150.00 | $150.00 | $200.00 | $325.00 |
| 90 | Portable changeable message sign, as per plan (614E18601) | SNMT | 12 | $800.00 | $800.00 | $800.00 | $1,100.00 |
| 91 | Work zone center line, class II, 642 paint (614E21500) | MI | 16.93 | $500.00 | $50.00 | $500.00 | $530.00 |
| 92 | Work zone center line, class III, 642 paint (614E21550) | MI | 16.93 | $1,050.00 | $525.00 | $1,050.00 | $1,100.00 |
| 93 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 880 | $0.60 | $0.30 | $0.60 | $0.60 |
| 94 | Work zone stop line, class III, 642 paint (614E26610) | FT | 213 | $3.00 | $1.50 | $3.00 | $3.00 |
| 95 | Water (616E10000) | MGAL | 300 | $10.00 | $1.00 | $1.00 | $65.00 |
| 96 | Clearing and grubbing (201E11000) | LS | 1 | $1,170.00 | $1,170.00 | $1,170.00 | $6,000.00 |
| 97 | Structure removed (202E11000) | LS | 1 | $8,100.00 | $8,100.00 | $8,100.00 | $10,000 |
| 98 | Headwall removed (202E20010) | EACH | 2 | $750.00 | $750.00 | $750.00 | $1,000.00 |
| 99 | Pavement removed (202E23000) | SY | 46 | $10.05 | $10.05 | $10.05 | $24.00 |
| 100 | Excavation (203E10000) | CY | 21 | $23.40 | $23.40 | $23.40 | $55.00 |
| 101 | Embankment (203E20000) | CY | 67 | $23.40 | $23.40 | $23.40 | $55.00 |
| 102 | Geotextile fabric (204E50000) | SY | 3 | $20.55 | $20.55 | $20.55 | $180.00 |
| 103 | Guardrail, type MGS (606E15050) | FT | 75 | $18.00 | $18.00 | $18.00 | $19.00 |
| 104 | Guardrail, type MGS with long posts (606E15100) | FT | 337.50 | $21.00 | $21.00 | $21.00 | $22.00 |
| 105 | Guardrail, type MGS, 25' long-span (606E17350) | FT | 25 | $25.00 | $25.00 | $25.00 | $26.00 |
| 106 | Anchor assembly, MGS type E (MASH 2016 or NCHRP 35 (606E26150) | EACH | 3 | $2,350.00 | $2,350.00 | $2,350.00 | $2,500.00 |
| 107 | Anchor assembly, MGS type T (606E26550) | EACH | 3 | $1,100.00 | $1,100.00 | $1,100.00 | $1,200.00 |
| 108 | Rock channel protection, type B with filter (601E32100) | CY | 23 | $166.00 | $166.00 | $166.00 | $325.00 |
| 109 | Soil analysis test (659E00100) | EACH | 2 | $157.50 | $125.00 | $157.50 | $130.00 |
| 110 | Topsoil (659E00300) | CY | 68 | $102.15 | $102.15 | $102.15 | $50.00 |
| 111 | Seeding and mulching (659E10000) | SY | 31 | $70.05 | $70.04 | $70.04 | $75.00 |
| 112 | Repair seeding and mulching (659E14000) | SY | 31 | $12.80 | $12.80 | $12.80 | $14.00 |
| 113 | Inter-seeding (659E15000) | SY | 31 | $12.80 | $12.80 | $12.80 | $14.00 |
| 114 | Commercial fertilizer (659E20000) | TON | 0.09 | $898.00 | $898.00 | $898.00 | $950.00 |
| 115 | Lime (659E31000) | ACRE | 0.13 | $155.00 | $154.69 | $154.69 | $165.00 |
| 116 | Water (659E35000) | MGAL | 3 | $1.00 | $1.00 | $1.00 | $1.00 |
| 117 | Erosion control (832E30000) | EACH | 21,260 | $1.00 | $1.00 | $1.00 | $1.00 |
| 118 | Concrete masonry (602E20000) | CY | 13.20 | $2,252.00 | $2,251.53 | $2,251.53 | $2,000.00 |
| 119 | 38" X 60" conduit, type A, 706.04 (611E53000) | FT | 52 | $750.00 | $749.68 | $749.68 | $900.00 |
| 120 | Aggregate base (304E20000) | CY | 6 | $342.00 | $342.00 | $342.00 | $52.00 |
| 121 | Aggregate, single chip seal, type A (422E11000) | SY | 321 | $35.00 | $20.00 | $85.00 | $26.00 |
| 122 | Emulsion, chip seal (422E25000) | GAL | 119 | $5.00 | $4.45 | $50.00 | $17.00 |
| 123 | Compacted aggregate (617E10100) | CY | 100 | $70.00 | $60.00 | $100.00 | $250.00 |
| 124 | Water (617E25000) | MGAL | 2 | $10.00 | $1.00 | $1.00 | $65.00 |
| 125 | Edge line, 6", type 1 (642E00104) | MI | 0.20 | $2,500.00 | $2,500.00 | $2,500.00 | $2,600.00 |
| 126 | Center line, type 1 (642E00300) | MI | 0.10 | $5,000.00 | $5,000.00 | $5,000.00 | $5,400.00 |
| 127 | Asphalt concrete for maintaining traffic (614E13000) | CY | 204 | $150.00 | $150.00 | $200.00 | $325.00 |
| 128 | Water (616E10000) | MGAL | 5 | $10.00 | $1.00 | $1.00 | $75.00 |
| 129 | Department'S share of the dispute resolution advisor (100E51200) | EACH | 19,500 | $1.00 | $1.00 | $1.00 | $1.00 |
| 130 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $25,000 | $32,000 | $75,000 | $40,000 |
| 131 | CPM progress schedule short duration projects (108E30000) | LS | 1 | $15,000 | $5,000.00 | $15,000 | $2,500.00 |
| 132 | Special - departments share facilitated partnering costs (111E10100) | EACH | 4,875 | $1.00 | $1.00 | $1.00 | $1.00 |
| 133 | Maintaining traffic (614E11000) | LS | 1 | $476,500 | $524,160 | $335,000 | $330,000 |
| 134 | Field office, type B (619E16010) | MNTH | 6 | $2,300.00 | $2,400.00 | $2,500.00 | $3,400.00 |
| 135 | Construction layout stakes and surveying (623E10000) | LS | 1 | $50,000 | $75,000 | $75,000 | $52,000 |
| 136 | Mobilization (624E10000) | LS | 1 | $200,000 | $315,000 | $400,000 | $320,000 |
| 200 | Aggregate base (304E20000) | CY | 1,995 | $40.00 | $40.00 | $80.00 | $73.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 16, 2025. Compiled by Mirage Metrics.