ODOT contract 250013 bid tabulation

HAM-IR 71-01.81 (BRIDGE REPLACEMENT (1 BRIDGE)). Let by Ohio DOT on January 16, 2025, HAM. 4 bids received; low bid $12,889,022 by Prus Construction Company, +34% against the engineer's estimate of $9,625,000.

Owner
Ohio DOT
Letting
16 JAN 2025
Pay items
203
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Prus Construction Company$12,889,022Low+34%
2Sunesis Construction Co$13,027,416+1.0%+35%
3Great Lakes Construction Co$14,286,331+11%+48%
4Complete General Construction Company$15,440,828+20%+60%
ODOT contract 250013: bids by rank

Engineer's estimate: $9,625,000.

Bid tabulation

LinePay itemUnitQuantity1. Prus Construction Company2. Sunesis Construction Co3. Great Lakes Construction Co4. Complete General Construction Company
1Clearing and grubbing (201E11000)LS1$6,300.00$10,005$10,000$30,000
2Pavement removed (202E23000)SY274$23.00$42.64$75.00$25.00
3Walk removed (202E30000)SF5,584$2.50$3.23$3.00$5.00
4Concrete barrier removed (202E30700)FT76$115.00$42.63$75.00$145.00
5Curb removed (202E32000)FT355$17.25$10.19$18.00$20.00
6Guardrail removed (202E38000)FT200$3.52$6.93$2.80$2.80
7Special - fill and plug existing conduit (202E70000)FT100$36.00$18.51$75.00$26.00
8Fence removed (202E75000)FT110$7.70$6.12$8.00$8.00
9Gate removed (202E75250)EACH3$374.00$26.57$325.00$325.00
10Removal misc.: bench removed (202E98100)EACH6$220.00$131.26$700.00$1,000.00
11Removal misc.: ITS conduit removed (202E98200)FT40$16.50$15.00$15.00$4.75
12Removal misc.: railing removed (202E98200)FT86$33.00$19.95$40.00$155.00
13Removal misc.: wall removed (202E98200)FT94$91.25$65.83$65.00$144.00
14Abandon misc.: sanitary manhole abandoned (202E98600)EACH1$1,870.00$1,305.64$4,100.00$800.00
15Excavation (203E10000)CY63$64.00$69.17$95.00$35.00
16Embankment (203E20000)CY734$33.00$66.41$40.00$40.00
17Roadway, misc.: fido field incidentals (203E98500)LS1$2,950.00$3,772.49$3,500.00$20,000
18Subgrade compaction (204E10000)SY519$2.15$5.70$10.00$5.00
19Geotextile fabric (204E50000)SY30$23.50$5.51$28.00$4.50
20Guardrail, type MGS (606E15050)FT137.50$32.56$28.00$27.20$27.20
21MGS bridge terminal assembly, type 1 (606E35002)EACH1$4,317.50$2,147.86$3,645.00$3,645.00
22MGS bridge terminal assembly, type 2 (606E35102)EACH1$962.50$300.00$780.00$780.00
23Fence, type CLT, as per plan (607E23001)FT15$80.30$79.89$68.00$68.00
24Fence, type CLT, as per plan (607E23001)FT66$104.50$79.89$85.00$85.00
25Gate, type CLT, as per plan (607E61201)EACH1$3,245.00$225.00$2,975.00$2,975.00
26Gate, type CLT, as per plan (607E61201)EACH1$6,572.50$750.00$5,275.00$5,275.00
275" concrete walk (608E12000)SF3,778$10.00$15.69$13.00$15.00
285" concrete walk, as per plan (608E12001)SF366$27.00$23.67$28.00$24.00
29Curb ramp (608E52000)SF577$16.25$26.26$33.00$28.00
30Concrete barrier, single slope, type D (622E10160)FT34$405.00$300.00$380.00$300.00
31Concrete barrier end section, type D (622E25000)EACH2$12,000$5,000.00$9,000.00$5,500.00
32Barrier, misc.: concrete barrier, type B57 (622E90000)FT76$500.00$500.00$575.00$360.00
33Barrier, misc.: extension of barrier height (622E90000)FT29$250.00$231.24$235.00$285.00
34Special - bollard (690E50600)EACH12$1,400.00$350.00$1,200.00$1,150.00
35Special - pedestrian railing (690E98100)FT41$467.50$410.16$600.67$385.00
36Concrete slope protection, as per plan (601E21001)SY646$90.00$160.36$120.00$140.00
37Topsoil (659E00300)CY72$160.00$45.00$100.00$55.00
38Seeding and mulching, class 5A (659E00570)SY323$5.25$7.12$10.50$4.75
39Seeding and mulching (659E10000)SY304$5.25$5.75$8.25$4.75
40Commercial fertilizer (659E20000)TON0.08$2,200.00$1,000.00$950.00$2,000.00
41Lime (659E31000)ACRE0.07$440.00$200.00$250.00$400.00
42Water (659E35000)MGAL2$1.10$1.39$1.00$1.00
43Erosion control (832E30000)EACH15,000$1.00$1.00$1.00$1.00
446" base pipe underdrains (605E14000)FT50$43.00$24.55$50.00$25.00
456" conduit, type F (611E01500)FT66$56.75$28.82$50.00$50.00
46Inlet reconstructed to grade (611E99154)EACH1$2,650.00$2,507.53$1,700.00$1,200.00
47Low strength mortar backfill (613E41200)CY11$190.00$211.13$250.00$150.00
48Asphalt concrete base, PG64-22, (449) (301E56000)CY19$410.00$3,050.00$3,050.00$3,050.00
49Aggregate base (304E20000)CY117$95.00$167.36$175.00$194.60
52Tack coat (407E10000)GAL16$12.00$10.00$10.00$10.00
53Asphalt concrete surface course, type 1, (448), PG64-22 (441E50000)CY1$1,170.00$4,000.00$4,000.00$4,000.00
54Asphalt concrete surface course, 12.5 MM, type A (449) (442E22100)CY9$466.00$3,250.00$3,250.00$3,250.00
55Asphalt concrete intermediate course, 19 MM, type A (449) (442E22400)CY13$450.00$2,500.00$2,500.00$2,500.00
568" non-reinforced concrete pavement, class QC 1P (452E12010)SY33$147.00$115.00$275.00$175.00
5712" non-reinforced concrete pavement, class QC 1P (452E15010)SY89$204.00$229.21$300.00$125.00
58Curb, type 2-B (609E16000)FT318$35.00$34.20$35.00$85.00
59Curb, type 4-A (609E24000)FT115$26.25$24.15$60.00$83.00
60Curb, type 6 (609E26000)FT60$50.00$63.18$115.00$90.00
61Connection, fused pull apart (625E00450)EACH1$138.00$125.00$115.00$135.00
62Connection, unfused pull apart (625E00460)EACH1$137.50$125.00$115.00$115.00
63Light pole, decorative, as per plan (625E10481)EACH1$3,795.00$3,450.00$3,000.00$2,200.00
64Light pole foundation, as per plan (625E14501)EACH1$2,728.00$2,480.00$75.00$2,300.00
65No. 6 AWG 600 volt distribution cable (625E22990)FT18,390$2.85$2.60$2.50$2.50
66No. 10 AWG 600 volt distribution cable (625E23306)FT3,660$2.45$2.20$2.10$2.00
67No. 10 AWG pole and bracket cable (625E23400)FT45$2.45$2.20$2.00$2.50
68No. 12 AWG pole and bracket cable (625E23410)FT45$2.30$2.10$2.00$2.00
69Conduit, 3/4", 725.04, as per plan (625E25001)FT1,220$10.00$9.10$9.00$16.50
70Conduit, 2", 725.04, as per plan (625E25401)FT830$26.58$24.15$33.00$34.00
71Conduit, 2", 725.051 (625E25408)FT1,265$5.80$6.79$14.16$15.00
72Luminaire, decorative, as per plan, type 3, 36 wat (625E27551)EACH1$2,310.00$2,100.00$1,900.00$1,800.00
73Luminaire, misc.: bridge light (625E27600)EACH122$1,128.00$1,025.00$750.00$800.00
74Trench (625E29000)FT45$20.00$17.90$28.00$10.00
75Junction box, as per plan (625E29901)EACH122$2,125.00$1,930.00$1,400.00$1,950.00
76Pull box, 725.08, 18" (625E30700)EACH2$1,485.00$1,350.00$1,150.00$1,500.00
77Pull box, misc.: type B (625E31600)EACH1$1,900.00$1,725.00$2,100.00$2,100.00
78Ground rod (625E32000)EACH1$583.00$530.00$330.00$325.00
79Power service, as per plan (625E34001)EACH1$28,600$26,000$15,250$15,500
80Strain pole, misc.: foundation, FDN-4 (632E83600)EACH3$4,565.00$5,369.01$3,600.00$8,700.00
81Conduit, 2", 725.04 (625E25400)FT10$27.00$24.15$65.00$34.00
82Structure grounding system (625E33000)EACH2$5,500.00$5,000.00$17,400$12,000
83Lighting, misc.: median light pole adjustment (625E98000)EACH1$7,700.00$6,950.00$3,900.00$1,800.00
84RPM (621E00100)EACH3$1,166.00$1,060.00$1,060.00$1,060.00
85Raised pavement marker removed (621E54000)EACH3$88.00$46.88$40.00$35.00
86Barrier reflector, type 1, bidirectional (626E00102)EACH5$15.00$13.39$14.00$14.00
87Barrier reflector, type 2, bidirectional (626E00110)EACH6$15.00$13.39$15.00$15.00
88Ground mounted support, no. 3 post (630E03100)FT94$21.00$18.61$18.50$18.50
89Sign post reflector (630E08600)EACH4$72.90$66.24$45.00$45.00
90Sign support assembly, barrier mounted (630E79610)EACH1$1,800.00$1,642.87$620.00$60.00
91Sign, flat sheet (630E80100)SF51$24.00$21.72$26.00$26.00
92Concrete barrier median overhead sign support foundation, type TC-21.40, as per plan (630E84001)EACH1$9,300.00$6,400.00$16,450$16,450
93Rigid overhead sign support foundation (630E84510)EACH1$12,250$4,500.00$12,800$12,800
94Removal of ground mounted sign and disposal (630E84900)EACH13$18.25$16.58$20.00$20.00
95Removal of ground mounted sign and reerection (630E85100)EACH2$73.00$66.25$65.00$65.00
96Removal of ground mounted post support and disposal (630E86002)EACH6$24.50$22.10$25.00$25.00
97Removal of structure mounted sign and disposal (630E86310)EACH1$502.00$114.80$850.00$850.00
98Removal of overhead mounted sign and reerection (630E87100)EACH3$125.00$332.93$975.00$975.00
99Removal of overhead sign support and reerection, type TC-12.30 (630E89100)EACH2$2,010.00$1,587.55$7,625.00$7,625.00
100Edge line, 4" (644E00100)MI0.65$3,290.00$2,990.00$2,990.00$2,990.00
101Edge line, 6" (644E00104)MI4.29$4,554.00$4,140.00$4,140.00$4,140.00
102Lane line, 4" (644E00200)MI0.57$825.00$750.00$750.00$750.00
103Lane line, 6" (644E00204)MI2.69$2,184.00$1,985.00$1,985.00$1,985.00
104Center line (644E00300)MI0.29$5,973.00$5,430.00$5,430.00$5,430.00
105Channelizing line, 8" (644E00400)FT751$1.80$1.65$1.65$1.65
106Stop line (644E00500)FT179$7.05$6.40$6.40$6.40
107Crosswalk line, 12" (644E00620)FT100$6.60$6.00$6.00$6.00
108Transverse/diagonal line (644E00700)FT185$6.80$6.15$6.15$6.15
109Lane arrow (644E01300)EACH8$220.00$200.00$200.00$200.00
110Removal of pavement marking (644E30000)FT465$6.05$5.50$5.50$5.50
111Removal of pavement marking (644E30020)EACH1$550.00$500.00$500.00$500.00
112Pavement marking, misc.: crosswalk line, 6" (644E50300)FT245$6.25$5.65$5.65$5.65
113Trench, 30" deep (625E29010)FT10$20.00$23.16$44.00$14.00
114Pull box removed (625E31510)EACH2$550.00$500.00$300.00$250.00
115Underground warning marking tape (625E36010)FT46$2.00$1.75$3.00$2.00
116Fiber optic cable, misc.: ITS installation (804E98200)LS1$8,525.00$10,026$3,600.00$5,700.00
11732" ITS pull box with pad and standard lid assembly, type 2 (809E02000)EACH2$3,660.00$4,301.68$4,800.00$6,000.00
118Conduit, multicell, jacked or drilled, 4" (809E24000)FT46$154.00$140.00$88.00$100.00
119Conduit, 3", 725.04 (625E25500)FT35$40.00$36.30$71.00$44.00
120Trench (625E29000)FT70$20.00$17.90$28.00$10.00
121Underground warning marking tape (625E36010)FT70$2.00$1.75$3.00$2.00
122Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731)EACH1$800.00$937.96$750.00$800.00
123Accessible pedestrian pushbutton (632E20750)EACH1$1,200.00$1,410.17$950.00$1,050.00
124Covering of pedestrian signal head (632E25010)EACH1$100.00$116.44$50.00$40.00
125Signal cable, 7 conductor, no. 14 AWG (632E40700)FT309$3.25$3.69$3.40$3.50
126Pedestal foundation (632E64020)EACH1$2,008.00$2,361.07$1,300.00$2,250.00
127Strain pole, misc.: foundation, FDN-10 (632E83600)EACH1$4,015.00$4,722.14$7,400.00$9,750.00
128Strain pole, misc.: remove and reinstall (632E83600)EACH1$3,245.00$3,816.53$6,400.00$2,700.00
129Pedestal, 8', transformer base (632E89900)EACH1$1,304.00$1,533.08$825.00$1,400.00
130Removal of traffic signal installation (632E90100)EACH1$5,500.00$6,468.69$800.00$3,500.00
131Deciduous tree, 1-1/2" caliper (cercis canadensis) (661E40060)EACH3$341.00$387.22$500.00$310.00
1322" asphalt concrete walk (608E20000)SF681$10.00$17.18$22.78$12.50
133Law enforcement officer with patrol car for assistance (614E11110)HR750$99.00$89.40$100.00$95.00
134Increased barrier delineation (614E11630)FT2,200$2.35$2.13$2.13$2.13
135Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380)EACH15$2,270.00$2,062.19$2,062.19$2,063.00
136Detour signing (614E12420)LS1$28,850$26,222$160,000$26,223
137Work zone raised pavement marker (614E12800)EACH979$7.60$6.92$6.92$6.92
138Barrier reflector, type 1 (one-way) (614E13310)EACH175$14.00$12.73$12.73$12.73
139Barrier reflector, type 2 (one-way) (614E13312)EACH10$13.65$12.00$12.38$12.38
140Object marker, one way (614E13350)EACH69$22.50$20.23$20.23$20.23
141Portable changeable message sign, as per plan (614E18601)SNMT36$1,040.00$939.00$939.10$940.00
142Work zone lane line, class I, 6" (614E20010)MI4.49$1,180.00$1,065.00$1,065.00$1,065.00
143Work zone center line, class I (614E21000)MI0.60$3,092.00$2,810.00$2,810.00$2,810.00
144Work zone edge line, class I, 6" (614E22010)MI9.14$2,475.00$2,250.00$2,250.00$2,250.00
145Work zone channelizing line, class I, 12" (614E23010)FT25,613$1.10$1.00$1.00$1.00
146Work zone dotted line, class I (614E24000)FT5,791$1.00$0.90$0.90$0.90
147Work zone transverse/diagonal line, class I (614E25000)FT66$3.85$3.50$3.50$3.50
148Work zone stop line, class I (614E26000)FT11$4.20$3.75$3.75$3.75
149Work zone crosswalk line, class I, 12" (614E27010)FT151$3.60$3.25$3.25$3.25
150Portable barrier, unanchored (622E41100)FT4,393$36.75$33.39$35.00$33.39
151Portable barrier, anchored (622E41110)FT1,400$41.00$37.26$42.00$37.26
152Structure removed, over 20 foot span, as per plan (202E11003)LS1$214,500$106,685$400,000$475,000
153Portions of structure removed, over 20 foot span, as per plan (202E11203)LS1$545,600$194,917$250,000$575,000
154Concrete barrier removed, as per plan (202E30701)FT90$88.00$354.11$290.00$150.00
155Cofferdams and excavation bracing (503E11100)LS1$126,000$87,243$55,000$110,000
156Unclassified excavation, including shale (503E21102)CY28$122.00$127.63$180.00$55.00
157Unclassified excavation (503E21300)LS1$14,800$16,357$65,000$90,000
158Uncoated steel reinforcement (509E25000)LB2,863$1.52$1.53$1.40$1.30
159Galvanized steel reinforcement (509E26000)LB301,701$1.85$2.24$2.15$1.82
160Chromium steel reinforcement (509E27000)LB117,560$2.90$3.49$3.05$2.76
161Dowel holes with nonshrink, nonmetallic grout (510E10000)EACH328$41.50$22.61$35.00$20.00
162Class QC2 concrete with QC/QA, superstructure (511E32212)CY354$2,510.00$5,606.50$3,850.00$6,000.00
163Class QC1 concrete with QC/QA, pier above footings (511E40512)CY285$920.00$1,379.81$1,400.00$1,400.00
164Class QC1 concrete with QC/QA, pier above footings (511E42012)CY35$3,610.00$4,332.38$2,850.00$2,300.00
165Class QC SCC concrete with QC/QA, pier, as per plan (511E43223)CY253$2,585.00$3,211.61$4,350.00$3,000.00
166Class QC1 concrete with QC/QA, abutment including footing (511E43512)CY30$1,800.00$1,117.26$1,225.00$1,000.00
167Class QC1 concrete with QC/QA, retaining/wingwall not including footing (511E46012)CY35$2,085.00$1,968.79$1,800.00$900.00
168Class QC1 concrete with QC/QA, retaining/wingwall including footing (511E46212)CY53$2,000.00$1,645.73$2,200.00$1,500.00
169Class QC1 concrete with QC/QA, footing (511E46512)CY78$920.00$919.28$900.00$750.00
170Sealing of concrete surfaces, as per plan (512E10001)SY1,573$42.00$42.72$18.75$18.75
171Sealing of concrete surfaces (epoxy-urethane) (512E10100)SY930$40.00$47.58$28.00$28.00
172Preformed elastomeric compression joint seal (516E10000)FT14$54.00$42.75$60.00$46.52
173Structural expansion joint including elastomeric strip seal, as per plan (516E11211)FT38$745.00$1,290.68$800.00$1,100.00
1741/2" preformed expansion joint filler (516E13200)SF369$20.00$3.97$16.00$11.00
1751" preformed expansion joint filler (516E13600)SF183$22.00$5.67$18.00$12.00
1762" preformed expansion joint filler (516E13900)SF128$23.00$8.20$24.00$14.00
1772" deep joint sealer (516E31010)FT14$45.00$33.13$55.00$40.00
178Railing, misc.: aluminum railing with concrete par (517E76300)FT16$256.30$266.63$655.00$475.00
179Railing, misc.: pedestrian railing (517E76300)FT2,256$574.20$186.61$455.00$449.00
180Scupper, misc.: ramp scupper (518E12500)EACH3$4,700.00$3,857.62$4,500.00$3,700.00
181Porous backfill with geotextile fabric (518E21200)CY9$162.00$137.03$275.00$130.00
1826" pipe downspout, including specials, as per plan (518E43301)FT175$220.00$431.54$325.00$300.00
183Drilled shafts, misc.:CSL testing, 48" dia. shaft (524E95100)EACH2$3,400.00$4,269.83$6,750.00$6,100.00
184Drilled shafts, misc.:CSL testing, 54" dia. shaft (524E95100)EACH2$3,400.00$3,702.06$5,000.00$5,860.00
185Drilled shafts, misc.:CSL testing, 60" dia. shaft (524E95100)EACH2$3,400.00$4,638.46$10,500$6,100.00
186Drilled shafts, 42" diameter, into bedrock with QC/QA (524E95444)FT22$1,275.00$619.71$2,000.00$1,900.00
187Drilled shafts, 48" diameter, above bedrock with QC/QA (524E95452)FT136$950.00$455.67$725.00$1,800.00
188Drilled shafts, 48" diameter, into bedrock with QC/QA (524E95454)FT36$2,750.00$862.61$2,850.00$1,900.00
189Drilled shafts, 54" diameter, above bedrock with QC/QA (524E95462)FT75$2,254.00$899.41$1,400.00$2,000.00
190Drilled shafts, 54" diameter, into bedrock with QC/QA (524E95464)FT77$1,335.00$940.65$2,200.00$2,100.00
191Drilled shafts, 60" diameter, above bedrock with QC/QA (524E95472)FT364$1,262.00$1,014.23$1,200.00$2,000.00
192Special - structures misc.: prefabricated bridge (530E00200)LS1$1,725,000$3,241,292$2,250,000$2,500,000
193Special - vandal protection fence (607E40000)FT701$811.80$366.87$685.00$648.00
194Special - vandal protection fence (607E40000)FT298$631.40$265.14$550.00$497.00
195Thermal integrity profiling (tip) test (894E10000)EACH6$8,200.00$3,187.99$5,841.44$6,000.00
196Premium for contract performance bond and for payment bond (103E05000)LS1$185,000$55,305$120,000$68,000
197CPM progress schedule (108E10000)LS1$11,000$6,020.00$1,500.00$5,000.00
198Maintaining traffic (614E11000)LS1$1,250,000$761,955$1,100,000$1,160,000
199Construction layout stakes and surveying (623E10000)LS1$110,000$23,000$70,000$45,000
200Mobilization (624E10000)LS1$400,000$291,196$705,000$700,000
201Special - consultant for concrete quality control (690E98400)LS1$72,000$500.00$110,000$16,000
300Pavement repair, as per plan (253E01001)SY316$72.50$136.45$110.00$110.00
301Full depth pavement removal and rigid replacement, type 2, class QC MS, as per plan (255E16001)SY179$168.00$184.60$150.00$405.00
302Connection, unfused permanent (625E00480)EACH366$137.50$125.00$115.00$145.00
303Disconnect circuit (625E75800)EACH1$550.00$500.00$220.00$325.00
ODOT contract 250013: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of January 16, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy