ODOT contract 250102 bid tabulation

SHE-PAVE-FY25 (TWO LANE RESURFACING). Let by Ohio DOT on February 13, 2025, SHE. 2 bids received; low bid $2,880,600 by Barrett Paving Materials Inc, +5.8% against the engineer's estimate of $2,722,000.

Owner
Ohio DOT
Letting
13 FEB 2025
Pay items
29
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Barrett Paving Materials Inc$2,880,600Low+6.0%
2Shelly Company$2,975,996+3.0%+9.0%
ODOT contract 250102: bids by rank

Engineer's estimate: $2,722,000.

Bid tabulation

LinePay itemUnitQuantity1. Barrett Paving Materials Inc2. Shelly Company
1Preparing subgrade for shoulder paving (209E72050)MI22.16$700.00$900.00
2Special - mailbox removed and reset (690E50350)EACH6$280.00$350.00
3Manhole adjusted to grade (611E99654)EACH10$700.00$1,200.00
4Partial depth pavement repair (asphalt concrete base), as per plan (251E01041)SY1,000$72.00$65.00
5Pavement planing, asphalt concrete, 1 1/2" deep (254E01000)SY209,580$1.70$1.17
6Patching planed surface, as per plan (254E01601)SY200$10.00$20.00
7Asphalt concrete base, (449), as per plan, PG64-22 (301E56001)CY22$900.00$425.00
8Non-tracking tack coat (407E20000)GAL17,815$2.00$3.00
9Asphalt concrete surface course, type 1, (448), PG70-22M (441E50100)CY8,793$225.00$239.00
10Compacted aggregate (617E10100)CY755$100.00$100.00
11Rumble stripes, edge line (asphalt concrete) (618E41000)MI20.32$1,200.00$1,025.00
12Rumble stripes, center line (asphalt concrete) (618E43000)MI10.16$900.00$675.00
13Longitudinal joint preparation (874E21000)MI10.16$5,000.00$5,000.00
14RPM (621E00100)EACH694$34.00$34.00
15Raised pavement marker removed (621E54000)EACH694$5.00$4.50
16Edge line, 6", type 1 (642E00104)MI23.22$851.00$800.00
17Center line, type 1 (642E00300)MI11.61$852.00$1,000.00
18Stop line (644E00500)FT152$7.00$8.00
19Crosswalk line, 12" (644E00620)FT307$3.50$4.00
20School symbol marking, 96" (644E01110)EACH1$643.00$300.00
21Speed measurement marking (644E40000)EACH5$350.00$690.00
22Law enforcement officer with patrol car for assistance (614E11110)HR24$70.00$110.00
23Work zone marking sign (614E12460)EACH42$100.00$110.00
24Work zone center line, class I, 642 paint (614E21100)MI23.22$2,225.00$1,200.00
25Work zone stop line, class III, 642 paint (614E26610)FT304$3.00$3.00
26Work zone school symbol marking, 96", class III, 6 (614E31750)EACH2$150.00$150.00
27Premium for contract performance bond and for payment bond (103E05000)LS1$4,433.06$10,000
28Maintaining traffic (614E11000)LS1$95,000$100,000
29Mobilization (624E10000)LS1$13,000$100,000
ODOT contract 250102: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of February 13, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy