ODOT contract 250466 bid tabulation

LAW-SR 141-00.98 (TWO LANE RESURFACING). Let by Ohio DOT on October 9, 2025, LAW. 1 bid received; low bid $1,792,210 by Shelly Company, +0.4% against the engineer's estimate of $1,785,000.

Owner
Ohio DOT
Letting
09 OCT 2025
Pay items
22
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Shelly Company$1,792,210Low0.0%
ODOT contract 250466: bids by rank

Engineer's estimate: $1,785,000.

Bid tabulation

LinePay itemUnitQuantity1. Shelly Company
1Linear grading (209E60500)MI1.52$5,000.00
2Compacted aggregate (617E10100)CY148$160.00
3Partial depth pavement repair (441), as per plan (251E01001)SY1,500$40.50
4Pavement planing, asphalt concrete 1.25" (254E01000)SY124,379$1.65
5Patching planed surface (254E01600)SY24,851$2.75
6Non-tracking tack coat (407E20000)GAL11,214$4.10
7Asphalt concrete surface course, type 1, (448), as per plan (441E50101)CY4,360$231.25
8RPM (621E00100)EACH991$35.00
9Raised pavement marker removed (621E54000)EACH991$15.00
10Edge line, 6" (644E00104)MI15.06$3,470.00
11Center line (644E00300)MI7.53$4,410.00
12School symbol marking, 96" (644E01110)EACH2$500.00
13Edge line, 6" (646E10010)MI0.03$5,908.82
14Center line (646E10200)MI0.02$2,882.35
15Work zone marking sign (614E12460)EACH31$92.00
16Work zone center line, class III, 642 paint (614E21550)MI15.06$925.00
17Work zone edge line, class III, 6", 642 paint (614E22360)MI30.12$825.00
18Polymer modified asphalt expansion joint system (846E00110)CF38$631.33
19Premium for contract performance bond and for payment bond (103E05000)LS1$8,000.00
20Maintaining traffic (614E11000)LS1$100,000
21Construction layout stakes and surveying (623E10000)LS1$2,500.00
22Mobilization (624E10000)LS1$60,000
ODOT contract 250466: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of October 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy