ODOT contract 250474 bid tabulation

VAN-SR 116/SR 117/SR 697-Var. (TWO LANE RESURFACING). Let by Ohio DOT on October 9, 2025, VAN. 1 bid received; low bid $2,029,205 by Shelly Company, +7.8% against the engineer's estimate of $1,882,000.

Owner
Ohio DOT
Letting
09 OCT 2025
Pay items
22
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Shelly Company$2,029,205Low+8.0%
ODOT contract 250474: bids by rank

Engineer's estimate: $1,882,000.

Bid tabulation

LinePay itemUnitQuantity1. Shelly Company
1Wearing course removed (202E23500)SY4,133$1.60
2Erosion control (832E30000)EACH1,000$1.00
3Pavement repair (253E02000)CY200$470.00
4Pavement planing, asphalt concrete, 1.25" depth (254E01000)SY145,617$1.60
5Patching planed surface (254E01600)SY2,913$5.00
6Aggregate base (304E20000)CY105$200.00
7Non-tracking tack coat (407E20000)GAL12,730$3.00
8Asphalt concrete surface course, type 1, (446), PG64-22 (441E10000)CY5,106$250.00
9Asphalt concrete surface course, type 1, (448), PG64-22 (441E50000)CY93$450.00
10Compacted aggregate, as per plan (617E10101)CY1,258$75.00
11Rumble stripes, center line (asphalt concrete) (618E43000)MI6.57$1,050.00
12RPM (621E00100)EACH657$38.00
13Raised pavement marker removed (621E54000)EACH641$4.00
14Edge line, 6", type 1 (642E00104)MI19.36$900.00
15Center line, type 1 (642E00300)MI9.68$900.00
16Stop line (644E00500)FT49$25.00
17Work zone marking sign (614E12460)EACH52$85.00
18Work zone center line, class I (614E21000)MI9.68$750.00
19Work zone center line, class II (614E21400)MI19.36$500.00
20Premium for contract performance bond and for payment bond (103E05000)LS1$10,000
21Maintaining traffic (614E11000)LS1$75,000
22Mobilization (624E10000)LS1$40,000
ODOT contract 250474: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of October 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy