| 1 | Excavation (203E10000) | CY | 60 | $100.00 |
| 2 | Linear grading (209E60500) | MI | 0.22 | $13,250 |
| 3 | Preparing subgrade for shoulder paving (209E72050) | MI | 18.12 | $2,400.00 |
| 4 | Guardrail rebuilt, type 5 (606E16500) | FT | 618.75 | $15.00 |
| 5 | Raising type 5 guardrail (606E17000) | FT | 250 | $7.50 |
| 6 | Replace existing guardrail blockout (606E17700) | EACH | 40 | $15.00 |
| 7 | Anchor assembly rebuilt, type B (606E27840) | EACH | 1 | $1,500.00 |
| 8 | Anchor assembly rebuilt, type E (606E27850) | EACH | 1 | $2,000.00 |
| 9 | Anchor assembly rebuilt, type T (606E27900) | EACH | 1 | $850.00 |
| 10 | Bridge terminal assembly rebuilt, type 1 (606E35010) | EACH | 3 | $2,000.00 |
| 11 | Seeding and mulching, as per plan (659E10001) | SY | 387 | $15.42 |
| 12 | Inlet adjusted to grade (611E99150) | EACH | 1 | $7,500.00 |
| 13 | Pavement repair (253E02000) | CY | 1,838 | $350.00 |
| 14 | Pavement repair, as per plan (253E02001) | CY | 773 | $550.00 |
| 15 | Pavement planing, asphalt concrete, 1.5" (254E01000) | SY | 10,308 | $2.25 |
| 16 | Pavement planing, asphalt concrete, 1.75" (254E01000) | SY | 506,278 | $2.30 |
| 17 | Pavement planing, asphalt concrete, 3.75" (254E01000) | SY | 5,389 | $3.00 |
| 18 | Pavement planing, asphalt concrete, 4" (254E01000) | SY | 960 | $6.50 |
| 19 | Pavement planing, asphalt concrete, as per plan, V (254E01001) | SY | 6,984 | $9.00 |
| 20 | Pavement planing, portland cement concrete, 1.5" (254E01010) | SY | 2,344 | $7.00 |
| 21 | Full depth pavement removal and rigid replacement, type 1, class QC1 (255E11000) | SY | 2,200 | $250.00 |
| 22 | Full depth pavement sawing (255E20000) | FT | 7,260 | $3.70 |
| 23 | Special - paver mounted thermal profiling (400E10000) | LS | 1 | $8,000.00 |
| 24 | Non-tracking tack coat (407E20000) | GAL | 52,397 | $3.50 |
| 25 | Prime coat (408E10000) | GAL | 8,504 | $5.00 |
| 26 | Asphalt concrete intermediate course, type 1, (449), (under guardrail) (441E70800) | CY | 22 | $400.00 |
| 27 | Anti-segregation equipment (442E00100) | CY | 20,661 | $10.50 |
| 28 | Asphalt concrete intermediate course, 12.5 MM, type A (446) (442E10080) | CY | 8,825 | $215.00 |
| 29 | Asphalt concrete surface course, 12.5 MM, type A (447), as per plan (442E10301) | CY | 23,387 | $235.00 |
| 30 | Asphalt concrete surface course, 12.5 MM, type A (448) (442E20000) | CY | 431 | $235.00 |
| 31 | Asphalt concrete intermediate course, 19 MM, type A (449) (442E22400) | CY | 350 | $220.00 |
| 32 | Compacted aggregate (617E10100) | CY | 886 | $125.00 |
| 33 | Special - intelligent compaction (690E98400) | LS | 1 | $8,000.00 |
| 34 | Edge line, 6" (644E00104) | MI | 1.17 | $5,580.00 |
| 35 | Center line (644E00300) | MI | 0.54 | $8,650.00 |
| 36 | Channelizing line, 8" (644E00400) | FT | 105 | $3.25 |
| 37 | Stop line (644E00500) | FT | 236 | $9.50 |
| 38 | Transverse/diagonal line (644E00700) | FT | 180 | $9.50 |
| 39 | Chevron marking (644E00720) | FT | 775 | $9.50 |
| 40 | Island marking (644E00900) | SF | 67 | $3.50 |
| 41 | School symbol marking, 96" (644E01110) | EACH | 1 | $890.00 |
| 42 | Lane arrow (644E01300) | EACH | 2 | $125.00 |
| 43 | Dotted line, 6" (644E01510) | FT | 102 | $3.50 |
| 44 | Yield line (644E20800) | FT | 43 | $15.60 |
| 45 | Wet reflective epoxy pavement marking, edge line, 6" (807E12010) | MI | 0.43 | $12,200 |
| 46 | Wet reflective thermoplastic pavement marking, edge line, 6" (807E14010) | MI | 47.60 | $4,080.00 |
| 47 | Wet reflective thermoplastic pavement marking, lane line, 6" (807E14110) | MI | 22.20 | $1,715.00 |
| 48 | Wet reflective thermoplastic pavement marking, channelizing line, 12" (807E14310) | FT | 9,898 | $2.20 |
| 49 | Wet reflective thermoplastic pavement marking, dotted line, 6" (807E14410) | FT | 10,465 | $0.85 |
| 50 | Grooving for 6" recessed pavement marking, (asphalt) (850E10010) | MI | 69.80 | $1,485.00 |
| 51 | Grooving for 6" recessed pavement marking, (asphalt) (850E10110) | FT | 10,465 | $0.80 |
| 52 | Grooving for 12" recessed pavement marking, (asphalt) (850E10130) | FT | 9,898 | $1.65 |
| 53 | Grooving for 6" recessed pavement marking, (concrete) (850E20010) | MI | 0.43 | $6,250.00 |
| 54 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 80 | $90.00 |
| 55 | Speed zone ahead symbol sign (614E12410) | EACH | 20 | $88.00 |
| 56 | Work zone marking sign (614E12460) | EACH | 12 | $88.00 |
| 57 | Work zone increased penalties sign (614E12484) | EACH | 28 | $88.00 |
| 58 | Resume legal speed sign (614E12490) | EACH | 4 | $88.00 |
| 59 | Portable changeable message sign (614E18600) | SNMT | 4 | $1,500.00 |
| 60 | Work zone lane line, class II, 6", 642 paint (614E20510) | MI | 50.74 | $230.00 |
| 61 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 50.74 | $520.00 |
| 62 | Work zone center line, class II, 642 paint (614E21500) | MI | 0.96 | $110.00 |
| 63 | Work zone center line, class III, 642 paint (614E21550) | MI | 0.96 | $580.00 |
| 64 | Work zone edge line, class I, 6", 740.06, type I (614E22210) | MI | 1.12 | $10,050 |
| 65 | Work zone edge line, class III, 4", 642 paint (614E22350) | MI | 0.50 | $580.00 |
| 66 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 107.88 | $580.00 |
| 67 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 210 | $0.75 |
| 68 | Work zone channelizing line, class III, 12", 642 paint (614E23690) | FT | 9,898 | $0.75 |
| 69 | Work zone dotted line, class I, 6", 740.06, type I (614E24402) | FT | 5,880 | $0.52 |
| 70 | Work zone dotted line, class III, 4", 642 paint (614E24610) | FT | 204 | $1.00 |
| 71 | Digital speed limit (DSL) sign assembly (808E18700) | SNMT | 192 | $700.00 |
| 72 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $47,087 |
| 73 | Maintaining traffic (614E11000) | LS | 1 | $490,000 |
| 74 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $50,000 |
| 75 | Mobilization (624E10000) | LS | 1 | $400,000 |
| 100 | Rumble strips, shoulder (asphalt concrete) (618E40600) | MI | 44.40 | $625.00 |
| 101 | RPM (621E00100) | EACH | 1,619 | $40.00 |
| 102 | Raised pavement marker removed (621E54000) | EACH | 1,619 | $7.50 |
| 103 | Erosion control (832E30000) | EACH | 1,162 | $1.00 |