ODOT contract 260038 bid tabulation
D06-PMF-FY2026 (PAVEMENT MARKING). Let by Ohio DOT on January 15, 2026, District 6. 3 bids received; low bid $3,762,746 by Alpha Space Control LLC, -24% against the engineer's estimate of $4,976,000.
- Owner
- Ohio DOT
- Letting
- 15 JAN 2026
- Pay items
- 11
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Alpha Space Control LLC | $3,762,746 | Low | -24% |
| 2 | The Aero-Mark Company LLC | $3,967,000 | +5.0% | -20% |
| 3 | Oglesby Construction Inc | $4,344,793 | +15% | -13% |
Engineer's estimate: $4,976,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Alpha Space Control LLC | 2. The Aero-Mark Company LLC | 3. Oglesby Construction Inc |
|---|---|---|---|---|---|---|
| 1 | Edge line, 6", type 1 (642E00104) | MI | 3,974.34 | $605.35 | $639.00 | $690.00 |
| 2 | Lane line, 6", type 1 (642E00204) | MI | 1,195.01 | $298.65 | $333.00 | $360.00 |
| 3 | Center line, type 1 (642E00300) | MI | 1,118.14 | $416.05 | $470.00 | $545.00 |
| 4 | Channelizing line, 12", type 1 (642E00404) | FT | 663,006 | $0.50 | $0.50 | $0.50 |
| 5 | Dotted line, 6", type 1 (642E01510) | FT | 199,011 | $0.42 | $0.50 | $0.50 |
| 6 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 80 | $65.00 | $70.00 | $80.00 |
| 7 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $57,000 | $17,324 | $21,500 |
| 8 | Maintaining traffic (614E11000) | LS | 1 | $2,500.00 | $30,500 | $50,000 |
| 9 | Mobilization (624E10000) | LS | 1 | $15,000 | $12,500 | $50,000 |
| 10 | Mobilization, as per plan (624E15001) | EACH | 4 | $5,000.00 | $1,000.00 | $500.00 |
| 11 | Mobilization, as per plan (624E15001) | EACH | 4 | $5,000.00 | $750.00 | $500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 15, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.