ODOT contract 260160 bid tabulation
D04-PM/RPM FY2026 (West) (PAVEMENT MARKING). Let by Ohio DOT on March 26, 2026, District 4. 3 bids received; low bid $1,653,000 by The Aero-Mark Company LLC, -24% against the engineer's estimate of $2,166,000.
- Owner
- Ohio DOT
- Letting
- 26 MAR 2026
- Pay items
- 63
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | The Aero-Mark Company LLC | $1,653,000 | Low | -24% |
| 2 | Oglesby Construction Inc | $1,816,597 | +10% | -16% |
| 3 | Alpha Space Control LLC | $1,917,179 | +16% | -11% |
Engineer's estimate: $2,166,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. The Aero-Mark Company LLC | 2. Oglesby Construction Inc | 3. Alpha Space Control LLC |
|---|---|---|---|---|---|---|
| 1 | RPM reflector (621E00300) | EACH | 10,576 | $8.20 | $6.55 | $4.56 |
| 2 | Edge line, 6", type 1 (642E00104) | MI | 1,111.06 | $569.00 | $630.00 | $587.25 |
| 3 | Edge line, 6", type 1 (642E00104) | MI | 125 | $569.00 | $630.00 | $615.05 |
| 4 | Lane line, 6", type 1 (642E00204) | MI | 339.04 | $275.00 | $300.00 | $299.65 |
| 5 | Lane line, 6", type 1 (642E00204) | MI | 75 | $280.00 | $300.00 | $305.45 |
| 6 | Center line, type 1 (642E00300) | MI | 313.58 | $565.00 | $670.00 | $386.35 |
| 7 | Center line, type 1 (642E00300) | MI | 35 | $565.00 | $670.00 | $430.55 |
| 8 | Channelizing line, 8", type 1 (642E00400) | FT | 35,081 | $0.40 | $0.30 | $0.40 |
| 9 | Channelizing line, 8", type 1 (642E00400) | FT | 3,750 | $0.40 | $0.30 | $0.44 |
| 10 | Channelizing line, 12", type 1 (642E00404) | FT | 201,803 | $0.40 | $0.40 | $0.50 |
| 11 | Channelizing line, 12", type 1 (642E00404) | FT | 1,000 | $0.40 | $0.40 | $0.55 |
| 12 | Stop line, type 1 (642E00500) | FT | 11,249 | $3.00 | $3.15 | $3.05 |
| 13 | Stop line, type 1 (642E00500) | FT | 650 | $3.00 | $3.15 | $4.50 |
| 14 | Crosswalk line, 12", type 1 (642E00620) | FT | 7,417 | $2.00 | $1.50 | $1.95 |
| 15 | Crosswalk line, 12", type 1 (642E00620) | FT | 175 | $2.00 | $1.50 | $2.25 |
| 16 | Crosswalk line, 24", type 1 (642E00630) | FT | 617 | $3.00 | $3.15 | $3.50 |
| 17 | Transverse/diagonal line, type 1 (642E00700) | FT | 17,730 | $2.00 | $2.50 | $2.25 |
| 18 | Transverse/diagonal line, type 1 (642E00700) | FT | 1,250 | $2.00 | $2.50 | $2.65 |
| 19 | Chevron marking, type 1 (642E00720) | FT | 3,879 | $2.00 | $2.50 | $3.65 |
| 20 | Island marking, type 1 (642E00900) | SF | 3,118 | $1.00 | $1.60 | $2.25 |
| 21 | Island marking, type 1 (642E00900) | SF | 163 | $1.00 | $1.60 | $2.50 |
| 22 | Railroad symbol marking, type 1 (642E01000) | EACH | 19 | $200.00 | $300.00 | $325.00 |
| 23 | Railroad symbol marking, type 1 (642E01000) | EACH | 3 | $200.00 | $300.00 | $340.00 |
| 24 | School symbol marking, 96", type 1 (642E01110) | EACH | 21 | $200.00 | $200.00 | $245.00 |
| 25 | School symbol marking, 96", type 1 (642E01110) | EACH | 5 | $200.00 | $200.00 | $260.00 |
| 26 | Parking lot stall marking, type 1 (642E01200) | FT | 2,563 | $2.00 | $0.80 | $1.50 |
| 27 | Parking lot stall marking, type 1 (642E01200) | FT | 500 | $2.00 | $0.80 | $1.65 |
| 28 | Lane arrow, type 1 (642E01300) | EACH | 1,561 | $45.00 | $45.00 | $55.50 |
| 29 | Lane arrow, type 1 (642E01300) | EACH | 38 | $45.00 | $45.00 | $59.25 |
| 30 | Lane reduction arrow, type 1 (642E01312) | EACH | 71 | $200.00 | $100.00 | $275.00 |
| 31 | Lane reduction arrow, type 1 (642E01312) | EACH | 5 | $200.00 | $100.00 | $275.00 |
| 32 | Wrong way arrow, type 1 (642E01322) | EACH | 139 | $140.00 | $75.00 | $200.00 |
| 33 | Word on pavement, 96", type 1 (642E01410) | EACH | 2 | $140.00 | $75.00 | $150.00 |
| 34 | Dotted line, 6", type 1 (642E01510) | FT | 149,608 | $0.40 | $0.50 | $0.44 |
| 35 | Dotted line, 6", type 1 (642E01510) | FT | 1,290 | $0.40 | $0.50 | $0.50 |
| 36 | Handicap symbol marking, type 1 (642E01702) | EACH | 7 | $75.00 | $35.00 | $47.50 |
| 37 | Handicap symbol marking, type 1 (642E01702) | EACH | 3 | $75.00 | $35.00 | $50.00 |
| 38 | Yield line, type 1 (642E20802) | FT | 76 | $3.00 | $2.75 | $13.25 |
| 39 | Removal of pavement marking (642E30000) | FT | 1,250 | $1.75 | $2.00 | $2.85 |
| 40 | Removal of pavement marking, work order (642E30010) | SF | 250 | $1.75 | $3.00 | $3.00 |
| 41 | Removal of pavement marking (642E30020) | EACH | 12 | $225.00 | $200.00 | $125.00 |
| 42 | Speed measurement marking (642E40000) | EACH | 206 | $50.00 | $35.00 | $550.00 |
| 43 | Pavement marking, misc.: fish hook arrows (642E50010) | EACH | 14 | $145.00 | $60.00 | $75.00 |
| 44 | Pavement marking, misc.:urgent repair (642E50010) | EACH | 8 | $1,000.00 | $1,000.00 | $75.00 |
| 45 | Edge line, 6" (646E10010) | MI | 10 | $3,200.00 | $3,000.00 | $2,550.00 |
| 46 | Lane line, 6" (646E10110) | MI | 10 | $1,750.00 | $1,500.00 | $1,254.50 |
| 47 | Center line (646E10200) | MI | 5 | $4,000.00 | $4,200.00 | $2,752.50 |
| 48 | Channelizing line, 12" (646E10310) | FT | 1,000 | $1.65 | $1.50 | $1.46 |
| 49 | Stop line (646E10400) | FT | 100 | $15.00 | $3.50 | $10.55 |
| 50 | Transverse/diagonal line (646E10600) | FT | 150 | $10.00 | $3.50 | $10.55 |
| 51 | Lane arrow (646E20300) | EACH | 10 | $169.00 | $45.00 | $145.50 |
| 52 | Wrong way arrow (646E20320) | EACH | 10 | $285.00 | $70.00 | $295.00 |
| 53 | Dotted line (646E20500) | FT | 500 | $1.50 | $1.50 | $2.35 |
| 54 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 160 | $65.00 | $100.00 | $150.00 |
| 55 | Maintenance of traffic, one lane closure on A two lane highway (614E13600) | EACH | 13 | $250.00 | $500.00 | $500.00 |
| 56 | Maintenance of traffic, one lane closure on A four lane undivided highway (614E13700) | EACH | 13 | $250.00 | $500.00 | $500.00 |
| 57 | Maintenance of traffic, one lane closure on A 4 lane or greater divided highway (614E13800) | EACH | 13 | $250.00 | $500.00 | $500.00 |
| 58 | Portable changeable message sign, as per plan (614E18601) | SNMT | 12 | $100.00 | $1,000.00 | $275.00 |
| 59 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $6,986.16 | $10,000 | $29,000 |
| 60 | Maintaining traffic (614E11000) | LS | 1 | $7,000.00 | $25,000 | $5,500.00 |
| 61 | Construction layout stakes and surveying (623E10000) | LS | 1 | $1.00 | $1.00 | $1.00 |
| 62 | Mobilization (624E10000) | LS | 1 | $4,000.00 | $25,000 | $30,000 |
| 63 | Mobilization, as per plan (624E15001) | EACH | 25 | $1,000.00 | $1,000.00 | $5,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of March 26, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.