Or241: chandler (coos river) bridge. Let by Oregon DOT on January 30, 2025, Region 3. 4 bids received.
- Owner
- Oregon DOT
- Letting
- 30 JAN 2025
- Pay items
- 70
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 |
|---|---|---|---|---|---|---|---|
| 1 | Barrier gate (1999-9Z90000E) | EACH | 4 | $8,240.00 | $3,500.00 | $4,109.00 | $11,000 |
| 2 | Temporary flashing beacons (0227-0160000E) | EACH | 2 | $14,500 | $5,000.00 | $11,500 | $10,000 |
| 3 | Structural steel maintenance (0560-0109000A) | LB | 5,800 | $20.72 | $13.79 | $16.31 | $55.17 |
| 4 | Bridge structure mounts (0930-0105000A) | LB | 335 | $32.00 | $25.37 | $8.51 | $14.93 |
| 5 | Flaggers (0223-0168000T) | HR | 3,150 | $70.00 | $72.70 | $78.00 | $90.00 |
| 6 | Drainage curbs (0480-0100000F) | LF | 162 | $70.00 | $42.00 | $40.00 | $200.00 |
| 7 | Temporary work access and containment (0253-0106000A) | LS | 1 | $1,381,740 | $1,850,000 | $2,544,378 | $2,100,000 |
| 8 | Permanent seeding (1030-0108000R) | ACRE | 0.20 | $12,500 | $12,000 | $10,000 | $10,000 |
| 9 | Moving temporary impact attenuators, narrow site system (0226-0137000E) | EACH | 2 | $1,890.00 | $1,500.00 | $1,500.00 | $2,000.00 |
| 10 | Repair temporary impact attenuator, narrow site system (0226-0141300E) | EACH | 2 | $3,780.00 | $3,513.88 | $3,000.00 | $5,000.00 |
| 11 | Subgrade geotextile (0350-0105000J) | SY | 33 | $25.00 | $15.00 | $10.00 | $100.00 |
| 12 | General structural concrete, class 3300 (0540-0301000A) | CY | 2 | $20,790 | $20,000 | $16,325 | $30,000 |
| 13 | Guardrail terminals, non-flared (0810-0129000E) | EACH | 3 | $6,110.00 | $4,850.00 | $4,000.00 | $5,000.00 |
| 14 | Rivet and bolt replacement (1999-9Z90000E) | EACH | 20 | $90.00 | $175.00 | $130.00 | $500.00 |
| 15 | Midwest guardrail system, type 2A (0810-0146100F) | LF | 475 | $45.00 | $36.00 | $40.00 | $50.00 |
| 16 | Portable traffic signal (0227-0158000E) | EACH | 1 | $57,965 | $35,000 | $65,450 | $10,000 |
| 17 | Automated flagger assistance device (0223-0200000E) | EACH | 2 | $12,600 | $2,500.00 | $18,000 | $5,000.00 |
| 18 | Traffic gate (1999-9Z90000E) | EACH | 2 | $4,120.00 | $3,500.00 | $4,650.00 | $15,000 |
| 19 | Temporary removable tape (0225-0150000F) | LF | 3,200 | $4.50 | $3.50 | $4.00 | $0.50 |
| 20 | Soldier pile wall, bent 1 (1999-9Z90000A) | LS | 1 | $107,110 | $15,000 | $14,600 | $25,000 |
| 21 | Temporary barricades, type III (0224-0105000E) | EACH | 19 | $245.00 | $250.00 | $263.00 | $200.00 |
| 22 | General excavation (0330-0105000K) | CY | 100 | $190.00 | $85.00 | $115.00 | $200.00 |
| 23 | Portable changeable message signs (0222-0164000E) | EACH | 9 | $20,790 | $4,500.00 | $20,520 | $1,500.00 |
| 24 | Remove existing signs (0905-0100000A) | LS | 1 | $190.00 | $150.00 | $250.00 | $5,000.00 |
| 25 | Bridge identification markers (0842-0401000E) | EACH | 2 | $285.00 | $225.00 | $410.00 | $500.00 |
| 26 | Machine house door (1999-9Z90000E) | EACH | 2 | $2,420.00 | $6,000.00 | $4,907.00 | $15,000 |
| 27 | Fall arrest system (1999-9Z90000E) | EACH | 2 | $6,980.00 | $8,000.00 | $5,739.00 | $15,000 |
| 28 | Remove and replace temporary barrier (1999-9Z90000E) | EACH | 3 | $1,390.00 | $2,000.00 | $3,500.00 | $5,000.00 |
| 29 | Temporary non-reflective tape (0225-0152000F) | LF | 3,200 | $6.75 | $5.00 | $5.50 | $0.50 |
| 30 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $5,040.00 | $15,000 | $21,450 | $10,000 |
| 31 | Surface preparation (0594-0103000A) | LS | 1 | $1,679,500 | $2,350,000 | $2,228,458 | $3,300,000 |
| 32 | Coating application (0594-0104000A) | LS | 1 | $1,547,140 | $1,568,000 | $1,750,000 | $1,200,000 |
| 33 | Pollution control plan (0290-0100000A) | LS | 1 | $7,150.00 | $100.00 | $1,950.00 | $10,000 |
| 34 | Temporary impact attenuator, narrow site system (0226-0134000E) | EACH | 2 | $5,540.00 | $4,000.00 | $3,875.00 | $10,000 |
| 35 | Flagger station lighting (0223-0168100E) | EACH | 2 | $4,660.00 | $500.00 | $11,576 | $5,000.00 |
| 36 | Guardrail transition (0810-0126000E) | EACH | 4 | $6,550.00 | $52,000 | $4,500.00 | $5,000.00 |
| 37 | Mailbox concrete collars (1070-0102000E) | EACH | 1 | $1,450.00 | $600.00 | $700.00 | $2,500.00 |
| 38 | Pack rust removal (0594-0108000F) | LF | 456 | $120.00 | $95.00 | $184.00 | $100.00 |
| 39 | Midwest guardrail system, type 3 (0810-0146100F) | LF | 50 | $75.00 | $58.00 | $76.00 | $80.00 |
| 40 | Additional fastener installation (1999-9Z90000E) | EACH | 240 | $62.00 | $85.00 | $39.00 | $320.00 |
| 41 | Remove and reinstall mailbox supports (1070-0103000E) | EACH | 1 | $590.00 | $700.00 | $1,300.00 | $5,000.00 |
| 42 | Asphalt pavement sawcutting (0310-0119000F) | LF | 500 | $2.65 | $7.00 | $7.00 | $5.00 |
| 43 | Temporary signs (0222-0102000J) | SF | 1,420 | $57.50 | $35.00 | $39.00 | $20.00 |
| 44 | Remove and reinstall existing signs (0905-0101000A) | LS | 1 | $252.00 | $200.00 | $1,150.00 | $10,000 |
| 45 | Bridge removal work (0501-0100000A) | SF | 180 | $56.11 | $166.67 | $213.67 | $250.00 |
| 46 | Clearing and grubbing (0320-0100000A) | ACRE | 0.20 | $63,000 | $2,500.00 | $113,700 | $100,000 |
| 47 | Extra for 8 foot posts (0810-0133000E) | EACH | 16 | $160.00 | $125.00 | $50.00 | $100.00 |
| 48 | GRC conduit system, 1 inch diameter (0583-0202000F) | LF | 40 | $85.00 | $150.00 | $68.00 | $70.00 |
| 49 | Inlet protection, type 3 (0280-0114030E) | EACH | 32 | $150.00 | $150.00 | $180.00 | $200.00 |
| 50 | Access gate (1999-9Z90000E) | EACH | 2 | $10,310 | $3,500.00 | $2,358.00 | $500.00 |
| 51 | Wood sign posts (0910-0100000K) | FBM | 40 | $25.00 | $20.00 | $42.00 | $200.00 |
| 52 | Delineators, type 4 alternate 2 (0840-0104200E) | EACH | 20 | $65.00 | $50.00 | $45.00 | $50.00 |
| 53 | Guardrail terminals, flared (0810-0130000E) | EACH | 1 | $7,080.00 | $4,950.00 | $4,000.00 | $5,000.00 |
| 54 | Temporary plastic drums (0224-0145000E) | EACH | 94 | $75.50 | $60.00 | $133.00 | $50.00 |
| 55 | Lead compliance plan (0294-0500000A) | LS | 1 | $7,150.00 | $3,000.00 | $12,500 | $10,000 |
| 56 | Aggregate base (0640-0100000M) | TON | 200 | $190.00 | $85.00 | $95.00 | $150.00 |
| 57 | Level 3, 1/2 inch ACP mixture (0744-0302000M) | TON | 65 | $334.00 | $265.00 | $265.00 | $200.00 |
| 58 | Contaminated soil disposal (0294-0200010M) | TON | 34 | $315.00 | $165.00 | $246.00 | $500.00 |
| 59 | Bar removal (0225-0156000J) | SF | 48 | $18.50 | $15.00 | $15.00 | $50.00 |
| 60 | Temporary pavement bars (0225-0153200J) | SF | 48 | $12.50 | $10.00 | $10.00 | $50.00 |
| 61 | Temporary barrier (0226-0126100F) | LF | 1,450 | $36.00 | $26.00 | $26.00 | $30.00 |
| 62 | Coating materials (0594-0105000A) | LS | 1 | $220,930 | $285,000 | $97,653 | $200,000 |
| 63 | Soldier pile wall, bent 12 (1999-9Z90000A) | LS | 1 | $107,110 | $15,000 | $14,600 | $25,000 |
| 64 | Signs, standard sheeting, sheet aluminum (0940-0202000J) | SF | 74.50 | $44.00 | $40.00 | $70.00 | $100.00 |
| 65 | Sediment barrier, type 3 (0280-0115030F) | LF | 375 | $6.00 | $5.00 | $6.00 | $10.00 |
| 66 | Reinforcement, grade 60 (0530-0104000A) | LB | 322 | $13.70 | $26.40 | $36.02 | $115.84 |
| 67 | Temporary impact attenuator, truck mounted (0226-0138000E) | EACH | 2 | $22,680 | $2,500.00 | $35,759 | $6,000.00 |
| 68 | Repair temporary impact attenuator, truck mounted (0226-0141400E) | EACH | 2 | $1,975.00 | $100.00 | $1,000.00 | $5,000.00 |
| 69 | Work containment plan (0290-0102000A) | LS | 1 | $35,750 | $3,000.00 | $25,995 | $15,000 |
| 70 | Luminaires, lamps, and ballasts (0970-0104000A) | EACH | 4 | $4,625.00 | $2,125.00 | $3,750.00 | $3,750.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of January 30, 2025. Compiled by Mirage Metrics.