ODOT contract 15574 bid tabulation
Portland metro area 2024-2027 ada curb ramps, phase 1. Let by Oregon DOT on January 16, 2025, Region 1. 7 bids received.
- Owner
- Oregon DOT
- Letting
- 16 JAN 2025
- Pay items
- 61
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 | ||
| 7 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 | Rank 5 | Rank 6 |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Temporary plastic drums (0224-0145000E) | EACH | 204 | $40.00 | $55.00 | $50.00 | $65.00 | $60.00 | $20.00 |
| 2 | Traffic control supervisor (0223-0169000E) | EACH | 260 | $580.00 | $750.00 | $900.00 | $600.00 | $750.00 | $1,300.00 |
| 3 | Temporary striping (0225-0153000F) | LF | 960 | $5.00 | $2.50 | $1.00 | $2.50 | $5.00 | $1.25 |
| 4 | Concrete driveways (0759-0126000J) | SF | 300 | $28.00 | $15.00 | $20.00 | $33.00 | $25.00 | $30.00 |
| 5 | Lead compliance plan (0294-0500000A) | LS | 1 | $5,000.00 | $5,000.00 | $2,000.00 | $2,500.00 | $600.00 | $2,000.00 |
| 6 | Asphalt pavement sawcutting (0310-0119000F) | LF | 12,300 | $4.00 | $2.50 | $6.00 | $6.00 | $2.75 | $12.00 |
| 7 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $25,000 | $30,000 | $400,000 | $175,000 | $80,000 | $610,000 |
| 8 | Aggregate base (0640-0100000M) | TON | 5,300 | $88.00 | $90.00 | $80.00 | $20.00 | $48.50 | $10.00 |
| 9 | Wood sign posts (0910-0100000K) | FBM | 160 | $35.00 | $16.00 | $10.00 | $17.00 | $30.00 | $16.00 |
| 10 | Concrete walks (0759-0128000J) | SF | 67,000 | $13.00 | $9.80 | $13.00 | $14.00 | $13.70 | $20.00 |
| 11 | Soil sample collection and analytical testing (0294-0700000E) | EACH | 1 | $4,200.00 | $4,000.00 | $2,000.00 | $3,000.00 | $2,250.00 | $3,000.00 |
| 12 | Extra for new curb ramps (0759-0154100E) | EACH | 314 | $900.00 | $360.00 | $1,100.00 | $2,000.00 | $1,850.00 | $1,500.00 |
| 13 | Removal of surfacings for curb ramp construction (0310-0106101J) | SY | 12,000 | $34.00 | $23.00 | $40.00 | $33.00 | $70.00 | $50.00 |
| 14 | Permanent seeding, mix no. 1 (1030-0109000R) | ACRE | 0.30 | $35,000 | $15,000 | $20,000 | $28,000 | $16,150 | $5,000.00 |
| 15 | BI-directional yellow type iar markers (0855-0103100E) | EACH | 8 | $100.00 | $50.00 | $50.00 | $55.00 | $55.00 | $50.00 |
| 16 | Perforated steel square tube anchor sign supports (0930-0117000A) | LB | 155 | $51.61 | $12.10 | $12.90 | $12.90 | $48.71 | $25.81 |
| 17 | Concrete curbs, curb and gutter (0759-0103000F) | LF | 9,500 | $65.00 | $46.00 | $30.00 | $66.00 | $66.00 | $60.00 |
| 18 | Weed control geotextile (1040-0208000J) | SF | 1,500 | $2.00 | $0.75 | $1.00 | $2.00 | $1.00 | $1.00 |
| 19 | Flagger station lighting (0223-0168100E) | EACH | 12 | $2,000.00 | $2,600.00 | $600.00 | $5,000.00 | $1,800.00 | $150.00 |
| 20 | Flaggers (0223-0168000T) | HR | 6,800 | $77.00 | $70.50 | $75.00 | $71.00 | $76.00 | $85.00 |
| 21 | Truncated domes on new surfaces (0759-0510000J) | SF | 3,800 | $40.00 | $24.00 | $40.00 | $31.00 | $45.00 | $45.00 |
| 22 | Concrete islands (0759-0122000J) | SF | 10,000 | $26.00 | $25.00 | $20.00 | $28.00 | $17.50 | $15.00 |
| 23 | Temporary barricades, type II (0224-0104000E) | EACH | 72 | $100.00 | $65.00 | $40.00 | $65.00 | $54.00 | $50.00 |
| 24 | Level 3, 1/2 inch ACP mixture (0744-0302000M) | TON | 1,400 | $280.00 | $260.00 | $300.00 | $325.00 | $275.00 | $300.00 |
| 25 | Clearing and grubbing (0320-0100000A) | ACRE | 1 | $8,000.00 | $50,000 | $20,000 | $25,000 | $20,000 | $2,000.00 |
| 26 | Crosswalk closure supports (0902-0101000E) | EACH | 2 | $3,000.00 | $1,250.00 | $1,100.00 | $1,500.00 | $2,100.00 | $2,000.00 |
| 27 | Thermoplastic, extruded, surface, profiled (0865-0116600F) | LF | 38 | $75.00 | $35.00 | $40.00 | $40.00 | $38.00 | $35.00 |
| 28 | Cold plane pavement removal, 4 inches deep (0620-0123000J) | SY | 830 | $33.00 | $22.00 | $15.00 | $48.00 | $25.00 | $10.00 |
| 29 | Minor adjustment of manholes (0490-0120000E) | EACH | 2 | $1,400.00 | $2,000.00 | $1,500.00 | $3,000.00 | $4,500.00 | $4,000.00 |
| 30 | Inlet protection, type 11 (0280-0114110E) | EACH | 1 | $130.00 | $200.00 | $100.00 | $225.00 | $125.00 | $50.00 |
| 31 | Adjusting inlets (0490-0105000E) | EACH | 14 | $800.00 | $1,300.00 | $1,200.00 | $2,200.00 | $1,200.00 | $500.00 |
| 32 | Remove and reinstall site furnishings (1095-0104000E) | EACH | 1 | $850.00 | $4,000.00 | $1,800.00 | $2,000.00 | $1,000.00 | $3,000.00 |
| 33 | Sediment barrier, type 3 (0280-0115030F) | LF | 25 | $30.00 | $25.00 | $10.00 | $7.00 | $25.00 | $20.00 |
| 34 | Temporary curb ramp, parallel (0228-0167670E) | EACH | 20 | $1,350.00 | $350.00 | $900.00 | $1,500.00 | $1,250.00 | $250.00 |
| 35 | Bark mulch (1040-0190000K) | CY | 60 | $210.00 | $55.00 | $100.00 | $185.00 | $60.00 | $210.00 |
| 36 | Topsoil (1040-0101000K) | CY | 170 | $190.00 | $45.00 | $100.00 | $170.00 | $50.00 | $185.00 |
| 37 | Concrete curbs, standard curb (0759-0110000F) | LF | 4,400 | $57.00 | $46.00 | $30.00 | $62.00 | $45.00 | $60.00 |
| 38 | Temporary signs (0222-0102000J) | SF | 3,800 | $14.00 | $25.00 | $10.00 | $25.00 | $21.00 | $10.00 |
| 39 | Remove and reinstall existing signs (0905-0101000A) | LS | 1 | $5,000.00 | $1,500.00 | $5,000.00 | $2,000.00 | $6,800.00 | $3,000.00 |
| 40 | Thermoplastic, wet weather, grooved, non-profiled (0865-0207000F) | LF | 20 | $45.00 | $35.00 | $40.00 | $40.00 | $38.00 | $35.00 |
| 41 | Cold plane pavement removal, 2 inches deep (0620-0120000J) | SY | 980 | $15.00 | $11.00 | $15.00 | $36.00 | $12.00 | $5.00 |
| 42 | Concrete washout facility (0280-0112500E) | EACH | 10 | $600.00 | $1,200.00 | $1,000.00 | $1,400.00 | $6,600.00 | $250.00 |
| 43 | Bar removal (0225-0156000J) | SF | 20 | $50.00 | $22.00 | $10.00 | $30.00 | $25.00 | $11.00 |
| 44 | Inlet protection, type 10 (0280-0114100E) | EACH | 10 | $80.00 | $120.00 | $100.00 | $150.00 | $125.00 | $50.00 |
| 45 | Connection to existing structures (0490-0104000E) | EACH | 1 | $2,000.00 | $4,000.00 | $2,000.00 | $2,500.00 | $1,800.00 | $4,000.00 |
| 46 | Methyl methacrylate, wet weather, grooved, non-profiled (0865-0203000F) | LF | 80 | $50.00 | $35.00 | $40.00 | $40.00 | $38.00 | $35.00 |
| 47 | Pavement bar, type B-HS (0867-0145100J) | SF | 1,200 | $30.00 | $18.80 | $21.00 | $20.00 | $20.00 | $18.80 |
| 48 | Inlet protection, type 3 (0280-0114030E) | EACH | 47 | $77.00 | $100.00 | $100.00 | $150.00 | $125.00 | $50.00 |
| 49 | Stripe removal (0225-0154000F) | LF | 960 | $12.00 | $3.50 | $2.00 | $3.50 | $5.00 | $2.00 |
| 50 | Pedestrian channelizing devices (0228-0141600F) | LF | 2,000 | $27.00 | $35.00 | $25.00 | $37.00 | $17.00 | $20.00 |
| 51 | Contaminated soil disposal (0294-0200010M) | TON | 94 | $240.00 | $155.00 | $120.00 | $210.00 | $200.00 | $50.00 |
| 52 | Perforated steel square tube slip base sign supports (0930-0114000A) | LB | 132 | $60.61 | $18.18 | $15.15 | $18.94 | $69.32 | $37.88 |
| 53 | Temporary pavement bars (0225-0153200J) | SF | 220 | $20.00 | $6.25 | $6.00 | $6.50 | $10.00 | $3.00 |
| 54 | Temporary removable tape (0225-0150000F) | LF | 36 | $18.00 | $20.00 | $5.00 | $9.00 | $15.00 | $10.00 |
| 55 | Temporary barricades, type III (0224-0105000E) | EACH | 25 | $150.00 | $200.00 | $150.00 | $200.00 | $215.00 | $50.00 |
| 56 | Adjusting boxes (0490-0100000E) | EACH | 33 | $498.00 | $250.00 | $400.00 | $275.00 | $375.00 | $200.00 |
| 57 | Sign support footings (0920-0100000A) | CY | 1 | $8,000.00 | $4,500.00 | $2,000.00 | $5,000.00 | $8,725.00 | $7,000.00 |
| 58 | Plain concrete pavement repair (0754-0100000J) | SY | 100 | $400.00 | $450.00 | $260.00 | $340.00 | $50.00 | $325.00 |
| 59 | Pollution control plan (0290-0100000A) | LS | 1 | $500.00 | $15,000 | $1,000.00 | $5,000.00 | $1,000.00 | $3,000.00 |
| 60 | Extra for pavement repair (0749-0109000J) | SF | 24,900 | $6.00 | $12.00 | $5.00 | $5.00 | $5.50 | $2.00 |
| 61 | Portable changeable message signs (0222-0164000E) | EACH | 2 | $6,500.00 | $12,500 | $8,000.00 | $5,000.00 | $17,500 | $20,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of January 16, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.