ODOT contract 15579 bid tabulation
Thorn hollow road: umatilla river bridge. Let by Oregon DOT on January 30, 2025, Region 5. 8 bids received.
- Owner
- Oregon DOT
- Letting
- 30 JAN 2025
- Pay items
- 51
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 | ||
| 7 | ||
| 8 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 | Rank 5 | Rank 6 |
|---|---|---|---|---|---|---|---|---|---|
| 1 | 12 inch culvert pipe, 5 FT depth (0445-010012AF) | LF | 34 | $145.00 | $84.00 | $140.50 | $151.50 | $140.00 | $250.00 |
| 2 | Structure excavation (0510-0101000A) | CY | 287 | $87.11 | $23.45 | $105.23 | $174.22 | $169.16 | $174.22 |
| 3 | Coated reinforcement, grade 60 (0530-0104100A) | LB | 37,690 | $1.99 | $2.06 | $1.83 | $2.52 | $2.31 | $5.31 |
| 4 | Drilled shaft reinforcement, grade 60 (0512-0104000A) | LB | 39,950 | $2.88 | $1.87 | $2.15 | $3.75 | $4.27 | $3.75 |
| 5 | Surface texturing (0540-0401000J) | SY | 704 | $9.00 | $18.00 | $8.00 | $8.13 | $9.00 | $9.00 |
| 6 | Temporary signs (0222-0102000J) | SF | 72 | $40.00 | $31.00 | $35.00 | $38.00 | $90.00 | $35.00 |
| 7 | Water quality swale 2 (1012-0100000A) | LS | 1 | $8,000.00 | $8,020.00 | $8,720.00 | $9,800.00 | $5,665.00 | $6,100.00 |
| 8 | Longitudinal pavement markings - paint (0860-0200000F) | LF | 2,900 | $1.30 | $1.50 | $1.30 | $1.30 | $1.40 | $1.30 |
| 9 | Sediment fence (0280-0113000F) | LF | 1,100 | $4.50 | $8.00 | $5.00 | $5.25 | $9.00 | $5.25 |
| 10 | Reinforcement, grade 60 (0530-0104000A) | LB | 33,020 | $1.51 | $1.76 | $2.16 | $2.27 | $2.02 | $2.27 |
| 11 | Level 3, 1/2 inch ACP mixture (0744-0302000M) | TON | 435 | $135.00 | $230.00 | $156.00 | $148.23 | $180.00 | $131.50 |
| 12 | Guardrail transition (0810-0126000E) | EACH | 4 | $3,500.00 | $3,440.00 | $5,150.00 | $5,150.00 | $5,150.00 | $3,500.00 |
| 13 | Shoring, cribbing, and cofferdams (0510-0100000A) | SY | 5 | $20.00 | $1,966.00 | $70,000 | $5,000.00 | $73,717 | $55,000 |
| 14 | CSL tests (0512-0106000E) | EACH | 6 | $1,650.00 | $3,560.00 | $3,200.00 | $3,200.00 | $3,200.00 | $3,500.00 |
| 15 | Drilled shaft concrete (0512-0101000A) | CY | 160 | $781.25 | $862.94 | $937.50 | $812.50 | $1,020.34 | $937.50 |
| 16 | Riprap geotextile, type 2 (0350-0104000J) | SY | 282 | $4.00 | $6.00 | $4.00 | $4.00 | $5.00 | $2.25 |
| 17 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $5,000.00 | $4,490.00 | $57,000 | $9,500.00 | $19,450 | $15,000 |
| 18 | Pollution control plan (0290-0100000A) | LS | 1 | $100.00 | $1.25 | $100.00 | $500.00 | $3,872.00 | $1,500.00 |
| 19 | 24 inch culvert pipe, 5 FT depth (0445-010024AF) | LF | 48 | $165.00 | $84.00 | $156.00 | $142.35 | $160.00 | $200.00 |
| 20 | Aggregate base (0641-0102000M) | TON | 1,400 | $35.00 | $41.00 | $41.00 | $34.50 | $40.00 | $88.50 |
| 21 | Plant cuttings, less than 1 inch (1040-0179000E) | EACH | 70 | $50.00 | $34.00 | $50.00 | $30.00 | $50.00 | $30.00 |
| 22 | Loose riprap, class 50 (0390-0105000K) | CY | 40 | $150.00 | $183.00 | $129.25 | $200.00 | $175.00 | $225.00 |
| 23 | Permanent seeding (1030-0108000R) | ACRE | 0.31 | $7,000.00 | $13,020 | $35,000 | $6,800.00 | $6,800.00 | $6,800.00 |
| 24 | Deciduous trees, #5 container (1040-0150000E) | EACH | 12 | $600.00 | $450.00 | $150.00 | $590.00 | $590.00 | $590.00 |
| 25 | Water quality swale 1 (1012-0100000A) | LS | 1 | $8,000.00 | $8,700.00 | $9,840.00 | $16,000 | $6,325.00 | $8,000.00 |
| 26 | Granular structure backfill (0510-0108000A) | CY | 150 | $100.00 | $104.60 | $166.67 | $8.15 | $196.40 | $216.67 |
| 27 | Drilled shaft excavation, 72 inch diameter (0512-0112000F) | LF | 150 | $1,465.00 | $2,210.00 | $2,044.00 | $1,911.37 | $2,235.00 | $2,000.00 |
| 28 | WF83TDG precast prestressed girders (1999-9Z90000F) | LF | 963.75 | $860.00 | $650.00 | $795.00 | $1,100.00 | $812.00 | $950.00 |
| 29 | General structural concrete, class 4000 (0540-0302000A) | CY | 201 | $1,815.92 | $1,638.91 | $1,885.57 | $1,890.55 | $1,500.84 | $1,492.54 |
| 30 | Single mailbox supports (1070-0100000E) | EACH | 1 | $725.00 | $920.00 | $600.00 | $800.00 | $865.00 | $600.00 |
| 31 | Bearing devices, 9-inch wide, 32-inch long, 3.45-inch thick (0582-0020000E) | EACH | 10 | $2,250.00 | $1,050.00 | $1,410.00 | $900.00 | $2,140.00 | $3,000.00 |
| 32 | Guardrail terminals, non-flared (0810-0129000E) | EACH | 2 | $3,500.00 | $3,800.00 | $4,736.00 | $4,650.00 | $4,650.00 | $3,500.00 |
| 33 | Guardrail, type 3 (0810-0107000F) | LF | 38 | $65.00 | $78.00 | $89.00 | $89.00 | $89.00 | $65.00 |
| 34 | Deck concrete, class HPC4500 (0540-0203100A) | CY | 133 | $1,315.79 | $1,896.39 | $2,287.82 | $1,879.70 | $1,684.64 | $1,503.76 |
| 35 | Shrubs, #1 container (1040-0153000E) | EACH | 84 | $110.00 | $45.00 | $100.00 | $110.00 | $110.00 | $110.00 |
| 36 | Clearing and grubbing (0320-0100000A) | ACRE | 0.52 | $9,615.38 | $17,365 | $96,154 | $105,769 | $35,512 | $144,231 |
| 37 | Guardrail end pieces, type B (0810-0122000E) | EACH | 2 | $200.00 | $750.00 | $175.00 | $175.00 | $175.00 | $200.00 |
| 38 | Guardrail, type 4 (0810-0109000F) | LF | 18.75 | $65.00 | $56.00 | $125.00 | $125.00 | $128.00 | $65.00 |
| 39 | CSL test access tubes (0512-0105000F) | LF | 920 | $12.00 | $10.00 | $10.00 | $15.00 | $16.00 | $20.00 |
| 40 | Riprap geotextile, type 1 (0350-0103000J) | SY | 54 | $20.00 | $34.00 | $17.00 | $4.00 | $5.00 | $2.25 |
| 41 | Embankment in place (0330-0123000K) | CY | 2,600 | $30.00 | $69.00 | $37.75 | $30.00 | $41.00 | $102.00 |
| 42 | Drainage curbs (0480-0100000F) | LF | 41 | $125.00 | $78.00 | $75.00 | $190.00 | $53.00 | $75.00 |
| 43 | Guardrail anchors, type 1 modified (0810-0120000E) | EACH | 4 | $1,500.00 | $1,340.00 | $1,655.00 | $1,650.00 | $1,650.00 | $1,500.00 |
| 44 | Guardrail, type 2A (0810-0104000F) | LF | 188 | $24.00 | $38.00 | $49.00 | $49.00 | $49.00 | $24.00 |
| 45 | Temporary barricades, type III (0224-0105000E) | EACH | 8 | $200.00 | $300.00 | $200.00 | $250.00 | $294.00 | $200.00 |
| 46 | Single slope concrete bridge rail (0587-0119000A) | LF | 390 | $282.05 | $232.49 | $284.27 | $384.62 | $273.85 | $256.41 |
| 47 | Poured joint seal (0585-0206100A) | LF | 62 | $48.39 | $55.97 | $145.16 | $29.03 | $80.65 | $403.23 |
| 48 | Loose riprap, class 2000 (0390-0116000K) | CY | 380 | $180.00 | $180.00 | $183.50 | $177.00 | $175.00 | $150.00 |
| 49 | Furnish drilling equipment (0512-0100000A) | LS | 1 | $572,000 | $166,950 | $151,000 | $250,000 | $285,000 | $250,000 |
| 50 | Reinforced concrete bridge approach slabs (0545-0100100J) | SY | 140 | $500.00 | $350.00 | $474.00 | $550.00 | $580.00 | $575.00 |
| 51 | Conifer trees, 4 FT height (1040-0112000E) | EACH | 8 | $800.00 | $900.00 | $400.00 | $790.00 | $790.00 | $790.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of January 30, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.