ODOT contract 15579 bid tabulation

Thorn hollow road: umatilla river bridge. Let by Oregon DOT on January 30, 2025, Region 5. 8 bids received.

Owner
Oregon DOT
Letting
30 JAN 2025
Pay items
51
Data through
13 AUG 2026

Bidders

RankTotal bidAgainst the low bid
1Low
2
3
4
5
6
7
8
ODOT contract 15579: bids by rank

Bid tabulation

LinePay itemUnitQuantityRank 1Rank 2Rank 3Rank 4Rank 5Rank 6
112 inch culvert pipe, 5 FT depth (0445-010012AF)LF34$145.00$84.00$140.50$151.50$140.00$250.00
2Structure excavation (0510-0101000A)CY287$87.11$23.45$105.23$174.22$169.16$174.22
3Coated reinforcement, grade 60 (0530-0104100A)LB37,690$1.99$2.06$1.83$2.52$2.31$5.31
4Drilled shaft reinforcement, grade 60 (0512-0104000A)LB39,950$2.88$1.87$2.15$3.75$4.27$3.75
5Surface texturing (0540-0401000J)SY704$9.00$18.00$8.00$8.13$9.00$9.00
6Temporary signs (0222-0102000J)SF72$40.00$31.00$35.00$38.00$90.00$35.00
7Water quality swale 2 (1012-0100000A)LS1$8,000.00$8,020.00$8,720.00$9,800.00$5,665.00$6,100.00
8Longitudinal pavement markings - paint (0860-0200000F)LF2,900$1.30$1.50$1.30$1.30$1.40$1.30
9Sediment fence (0280-0113000F)LF1,100$4.50$8.00$5.00$5.25$9.00$5.25
10Reinforcement, grade 60 (0530-0104000A)LB33,020$1.51$1.76$2.16$2.27$2.02$2.27
11Level 3, 1/2 inch ACP mixture (0744-0302000M)TON435$135.00$230.00$156.00$148.23$180.00$131.50
12Guardrail transition (0810-0126000E)EACH4$3,500.00$3,440.00$5,150.00$5,150.00$5,150.00$3,500.00
13Shoring, cribbing, and cofferdams (0510-0100000A)SY5$20.00$1,966.00$70,000$5,000.00$73,717$55,000
14CSL tests (0512-0106000E)EACH6$1,650.00$3,560.00$3,200.00$3,200.00$3,200.00$3,500.00
15Drilled shaft concrete (0512-0101000A)CY160$781.25$862.94$937.50$812.50$1,020.34$937.50
16Riprap geotextile, type 2 (0350-0104000J)SY282$4.00$6.00$4.00$4.00$5.00$2.25
17Removal of structures and obstructions (0310-0106000A)LS1$5,000.00$4,490.00$57,000$9,500.00$19,450$15,000
18Pollution control plan (0290-0100000A)LS1$100.00$1.25$100.00$500.00$3,872.00$1,500.00
1924 inch culvert pipe, 5 FT depth (0445-010024AF)LF48$165.00$84.00$156.00$142.35$160.00$200.00
20Aggregate base (0641-0102000M)TON1,400$35.00$41.00$41.00$34.50$40.00$88.50
21Plant cuttings, less than 1 inch (1040-0179000E)EACH70$50.00$34.00$50.00$30.00$50.00$30.00
22Loose riprap, class 50 (0390-0105000K)CY40$150.00$183.00$129.25$200.00$175.00$225.00
23Permanent seeding (1030-0108000R)ACRE0.31$7,000.00$13,020$35,000$6,800.00$6,800.00$6,800.00
24Deciduous trees, #5 container (1040-0150000E)EACH12$600.00$450.00$150.00$590.00$590.00$590.00
25Water quality swale 1 (1012-0100000A)LS1$8,000.00$8,700.00$9,840.00$16,000$6,325.00$8,000.00
26Granular structure backfill (0510-0108000A)CY150$100.00$104.60$166.67$8.15$196.40$216.67
27Drilled shaft excavation, 72 inch diameter (0512-0112000F)LF150$1,465.00$2,210.00$2,044.00$1,911.37$2,235.00$2,000.00
28WF83TDG precast prestressed girders (1999-9Z90000F)LF963.75$860.00$650.00$795.00$1,100.00$812.00$950.00
29General structural concrete, class 4000 (0540-0302000A)CY201$1,815.92$1,638.91$1,885.57$1,890.55$1,500.84$1,492.54
30Single mailbox supports (1070-0100000E)EACH1$725.00$920.00$600.00$800.00$865.00$600.00
31Bearing devices, 9-inch wide, 32-inch long, 3.45-inch thick (0582-0020000E)EACH10$2,250.00$1,050.00$1,410.00$900.00$2,140.00$3,000.00
32Guardrail terminals, non-flared (0810-0129000E)EACH2$3,500.00$3,800.00$4,736.00$4,650.00$4,650.00$3,500.00
33Guardrail, type 3 (0810-0107000F)LF38$65.00$78.00$89.00$89.00$89.00$65.00
34Deck concrete, class HPC4500 (0540-0203100A)CY133$1,315.79$1,896.39$2,287.82$1,879.70$1,684.64$1,503.76
35Shrubs, #1 container (1040-0153000E)EACH84$110.00$45.00$100.00$110.00$110.00$110.00
36Clearing and grubbing (0320-0100000A)ACRE0.52$9,615.38$17,365$96,154$105,769$35,512$144,231
37Guardrail end pieces, type B (0810-0122000E)EACH2$200.00$750.00$175.00$175.00$175.00$200.00
38Guardrail, type 4 (0810-0109000F)LF18.75$65.00$56.00$125.00$125.00$128.00$65.00
39CSL test access tubes (0512-0105000F)LF920$12.00$10.00$10.00$15.00$16.00$20.00
40Riprap geotextile, type 1 (0350-0103000J)SY54$20.00$34.00$17.00$4.00$5.00$2.25
41Embankment in place (0330-0123000K)CY2,600$30.00$69.00$37.75$30.00$41.00$102.00
42Drainage curbs (0480-0100000F)LF41$125.00$78.00$75.00$190.00$53.00$75.00
43Guardrail anchors, type 1 modified (0810-0120000E)EACH4$1,500.00$1,340.00$1,655.00$1,650.00$1,650.00$1,500.00
44Guardrail, type 2A (0810-0104000F)LF188$24.00$38.00$49.00$49.00$49.00$24.00
45Temporary barricades, type III (0224-0105000E)EACH8$200.00$300.00$200.00$250.00$294.00$200.00
46Single slope concrete bridge rail (0587-0119000A)LF390$282.05$232.49$284.27$384.62$273.85$256.41
47Poured joint seal (0585-0206100A)LF62$48.39$55.97$145.16$29.03$80.65$403.23
48Loose riprap, class 2000 (0390-0116000K)CY380$180.00$180.00$183.50$177.00$175.00$150.00
49Furnish drilling equipment (0512-0100000A)LS1$572,000$166,950$151,000$250,000$285,000$250,000
50Reinforced concrete bridge approach slabs (0545-0100100J)SY140$500.00$350.00$474.00$550.00$580.00$575.00
51Conifer trees, 4 FT height (1040-0112000E)EACH8$800.00$900.00$400.00$790.00$790.00$790.00
ODOT contract 15579: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.

Every contract let that day: ODOT letting of January 30, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy