ODOT contract 15581 bid tabulation
Or42: us101 to cedar point rd. Let by Oregon DOT on February 20, 2025, Region 3. 3 bids received.
- Owner
- Oregon DOT
- Letting
- 20 FEB 2025
- Pay items
- 153
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 |
|---|---|---|---|---|---|---|
| 1 | Pavement bar, type B-HS (0867-0145100J) | SF | 183 | $12.00 | $12.00 | $12.10 |
| 2 | Elastomeric concrete nosing (0584-0100000F) | LF | 182 | $104.60 | $105.00 | $105.00 |
| 3 | Guardrail terminals, non-flared, test level 2 (0810-0131000E) | EACH | 4 | $3,600.00 | $3,600.00 | $3,650.00 |
| 4 | Connection to existing structures (0490-0104000E) | EACH | 11 | $3,000.00 | $5,500.00 | $1,500.00 |
| 5 | Pollution control plan (0290-0100000A) | LS | 1 | $100.00 | $1,000.00 | $500.00 |
| 6 | Temporary water management facility at milepoint 6.92 (0245-0100000A) | LS | 1 | $3,755.00 | $28,000 | $60,000 |
| 7 | Temporary water management facility at milepoint 2.90 (0245-0100000A) | LS | 1 | $2,500.00 | $28,000 | $60,000 |
| 8 | Poured joint seal (0585-0206100A) | LF | 182 | $56.28 | $56.59 | $71.43 |
| 9 | Mono-directional white type iar markers, recessed (0855-0106100E) | EACH | 661 | $15.50 | $15.50 | $15.65 |
| 10 | Rolled waterproof membrane (0592-0101000J) | SF | 6,811 | $3.95 | $4.00 | $4.00 |
| 11 | Bridge deck cold plane pavement removal, 2 1/2 inches deep (0503-0101000J) | SY | 644 | $11.00 | $13.00 | $16.30 |
| 12 | Concrete manholes, large precast (0470-0106000E) | EACH | 2 | $15,600 | $26,500 | $38,000 |
| 13 | Mainline video inspection (0415-0100000F) | LF | 1,306 | $10.00 | $49.00 | $32.26 |
| 14 | General excavation (0330-0105000K) | CY | 511 | $58.00 | $86.00 | $80.00 |
| 15 | Temporary water management facility at milepoint 1.46 WB (0245-0100000A) | LS | 1 | $1,550.00 | $28,000 | $60,000 |
| 16 | Repair temporary impact attenuator, truck mounted (0226-0141400E) | EACH | 4 | $750.00 | $10,000 | $1.00 |
| 17 | Cold plane pavement removal, 3 inches deep (0620-0122000J) | SY | 212,100 | $2.68 | $4.25 | $1.91 |
| 18 | Temporary signs (0222-0102000J) | SF | 1,675 | $30.00 | $30.00 | $35.00 |
| 19 | Temporary water management facility at milepoint 0.99 WB (0245-0100000A) | LS | 1 | $3,200.00 | $28,000 | $60,000 |
| 20 | Turbidity monitoring (0290-0200000A) | LS | 1 | $3,300.00 | $2,000.00 | $30,000 |
| 21 | Guardrail terminals, non-flared, test level 3 (0810-0131000E) | EACH | 20 | $3,850.00 | $3,850.00 | $3,950.00 |
| 22 | Midwest guardrail system, type 3 (0810-0146100F) | LF | 175 | $56.15 | $56.00 | $56.50 |
| 23 | Construct and remove temporary roadbed and surfacing (0230-0200000A) | LS | 1 | $33,500 | $26,000 | $85,000 |
| 24 | Cold plane pavement removal, 5 inches deep (0620-0124000J) | SY | 5,102 | $5.75 | $9.50 | $5.10 |
| 25 | Repair elastomeric concrete nosing (0584-0102000F) | LF | 63 | $106.00 | $105.50 | $106.00 |
| 26 | Aggregate shoulders (0641-0130000M) | TON | 4,000 | $66.00 | $60.50 | $55.00 |
| 27 | Temporary pavement legends (0225-0153100E) | EACH | 5 | $122.00 | $122.00 | $143.13 |
| 28 | Temporary water management facility at milepoint 1.21 EB (0245-0100000A) | LS | 1 | $1,550.00 | $28,000 | $60,000 |
| 29 | Removal of guardrail (0310-0113000A) | LF | 21,330 | $2.67 | $2.67 | $2.72 |
| 30 | Temporary impact attenuator, truck mounted (0226-0138000E) | EACH | 1 | $10,000 | $14,000 | $30,000 |
| 31 | Flagger station lighting (0223-0168100E) | EACH | 5 | $2,200.00 | $4,400.00 | $1,100.00 |
| 32 | Temporary water management facility at milepoint 0.95 EB (0245-0100000A) | LS | 1 | $6,350.00 | $28,000 | $60,000 |
| 33 | Temporary water management facility at milepoint 2.02 WB (0245-0100000A) | LS | 1 | $215,000 | $53,000 | $60,000 |
| 34 | Asphalt pavement sawcutting (0310-0119000F) | LF | 1,600 | $4.50 | $6.00 | $8.00 |
| 35 | Cipp liner, 18 inch (0412-0100000F) | LF | 99 | $375.00 | $360.00 | $325.00 |
| 36 | 18 inch culvert pipe, 10 FT depth (0445-010018BF) | LF | 77 | $475.00 | $384.00 | $560.00 |
| 37 | Concrete inlets, type G-2 (0470-0315000E) | EACH | 8 | $5,725.00 | $5,600.00 | $6,200.00 |
| 38 | Class 2 preparation (0504-0100000J) | SY | 7 | $472.00 | $472.00 | $475.00 |
| 39 | Poured joint seal (0585-0206100A) | LF | 63 | $49.52 | $49.33 | $63.49 |
| 40 | Bridge approach slab cold plane pavement removal, 3 inches deep (0503-0103100J) | SY | 320 | $10.50 | $25.00 | $19.50 |
| 41 | 24 inch storm sewer pipe, 20 FT depth (0445-035024CF) | LF | 133 | $1,010.00 | $1,120.00 | $1,100.00 |
| 42 | Elastomeric concrete nosing material for repair (0584-0101000K) | CY | 0.70 | $4,350.00 | $4,331.00 | $4,400.00 |
| 43 | Guardrail terminals, downstream anchor terminal (0810-0132200E) | EACH | 8 | $8,650.00 | $8,650.00 | $8,750.00 |
| 44 | Delineators, type 5 (0840-0105000E) | EACH | 67 | $21.00 | $21.00 | $21.10 |
| 45 | Wood sign posts (0910-0100000K) | FBM | 132 | $25.00 | $25.00 | $26.00 |
| 46 | Temporary barricades, type III (0224-0105000E) | EACH | 22 | $200.00 | $200.00 | $250.00 |
| 47 | Temporary plastic drums (0224-0145000E) | EACH | 437 | $50.00 | $60.00 | $66.00 |
| 48 | Clearing and grubbing (0320-0100000A) | ACRE | 0.60 | $33,333 | $112,500 | $55,000 |
| 49 | Trench foundation (0405-0106000K) | CY | 401 | $225.00 | $243.00 | $125.00 |
| 50 | 60 inch storm sewer pipe, 10 FT depth (0445-035060BF) | LF | 44 | $1,300.00 | $1,020.00 | $1,600.00 |
| 51 | Bridge deck cold plane pavement removal, 3 inches deep (0503-0101000J) | SY | 403 | $10.50 | $21.00 | $18.10 |
| 52 | 60 inch storm sewer pipe, 20 FT depth (0445-035060CF) | LF | 247 | $1,300.00 | $876.00 | $900.00 |
| 53 | Subgrade geotextile (0350-0105000J) | SY | 9 | $75.00 | $14.00 | $32.00 |
| 54 | Bridge removal work (0501-0100000A) | SF | 218 | $0.46 | $4.59 | $20.64 |
| 55 | Polymer membrane (0590-0100000J) | SF | 6,722 | $4.25 | $4.25 | $4.30 |
| 56 | Bridge deck cold plane pavement removal, 2 1/2 inches deep (0503-0101000J) | SY | 757 | $10.50 | $11.50 | $15.60 |
| 57 | Polymer membrane (0590-0100000J) | SF | 5,792 | $4.50 | $4.50 | $4.40 |
| 58 | 12 inch storm sewer pipe, 5 FT depth (0445-035012AF) | LF | 172 | $150.00 | $91.00 | $315.00 |
| 59 | 18 inch culvert pipe, 20 FT depth (0445-010018CF) | LF | 22 | $1,250.00 | $710.00 | $1,200.00 |
| 60 | Temporary water management facility at milepoint 0.63 WB (0245-0100000A) | LS | 1 | $2,200.00 | $28,000 | $60,000 |
| 61 | Portable changeable message signs, roller mounted (0222-0167300E) | EACH | 1 | $12,000 | $3,000.00 | $5,866.00 |
| 62 | Sequential arrow signs (0222-0162000E) | EACH | 2 | $3,100.00 | $7,000.00 | $5,000.00 |
| 63 | Temporary water management facility at milepoint 1.94 WB (0245-0100000A) | LS | 1 | $215,000 | $28,000 | $60,000 |
| 64 | Erosion and sediment control manager (0280-0110000A) | LS | 1 | $4,600.00 | $1,000.00 | $10,000 |
| 65 | Concrete manholes, shallow (0470-0105000E) | EACH | 1 | $7,200.00 | $6,500.00 | $6,500.00 |
| 66 | Mpco removal (0504-0103000J) | SY | 2,117 | $18.00 | $10.25 | $10.50 |
| 67 | Mpco removal (0504-0103000J) | SY | 2,117 | $18.00 | $10.25 | $10.20 |
| 68 | Guardrail anchors, type 1 modified (0810-0120000E) | EACH | 18 | $780.00 | $775.00 | $800.00 |
| 69 | Extra for 8 foot posts (0810-0133000E) | EACH | 19 | $125.00 | $125.00 | $130.00 |
| 70 | Culvert drainage markers, type 1 (0842-0201000E) | EACH | 45 | $28.00 | $28.00 | $175.00 |
| 71 | Signs, standard sheeting, sheet aluminum (0940-0202000J) | SF | 32 | $50.00 | $50.00 | $51.00 |
| 72 | Gap pattern rumble strips (0857-0101500L) | MI | 2.20 | $2,850.00 | $2,850.00 | $2,900.00 |
| 73 | Guardrail terminals, buried in backslope (0810-0132100E) | EACH | 3 | $14,000 | $14,000 | $14,100 |
| 74 | Emulsified asphalt for tack coat (0730-0100000M) | TON | 69 | $1.00 | $1.00 | $510.00 |
| 75 | Bridge removal work (0501-0100000A) | SF | 218 | $0.46 | $4.59 | $16.51 |
| 76 | Concrete inlets, type G-2MA (0470-0319000E) | EACH | 1 | $5,725.00 | $8,000.00 | $6,300.00 |
| 77 | Concrete inlets, type D (0470-0311000E) | EACH | 2 | $5,725.00 | $5,800.00 | $7,000.00 |
| 78 | Cipp liner, 30 inch (0412-0100000F) | LF | 95 | $575.00 | $545.00 | $550.00 |
| 79 | Lead compliance plan (0294-0500000A) | LS | 1 | $500.00 | $1,000.00 | $500.00 |
| 80 | Temporary barricades, type II (0224-0104000E) | EACH | 3 | $70.00 | $47.00 | $75.00 |
| 81 | Radar speed trailer (0222-0167500E) | EACH | 2 | $10,000 | $14,000 | $4,000.00 |
| 82 | Class 2 preparation (0504-0100000J) | SY | 24 | $385.00 | $386.00 | $390.00 |
| 83 | Core correlation of nuclear gauge readings (0745-0900000E) | EACH | 2 | $500.00 | $3,500.00 | $1,250.00 |
| 84 | 24 inch culvert pipe, 20 FT depth (0445-010024CF) | LF | 145 | $670.00 | $1,071.00 | $825.00 |
| 85 | Mpco removal (0504-0103000J) | SY | 1,186 | $24.25 | $16.00 | $16.00 |
| 86 | 12 inch culvert pipe, 5 FT depth (0445-010012AF) | LF | 172 | $174.00 | $186.00 | $350.00 |
| 87 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $35,000 | $126,000 | $200,000 |
| 88 | Temporary water management facility at milepoint 2.47 (0245-0100000A) | LS | 1 | $6,300.00 | $28,000 | $60,000 |
| 89 | Temporary water management facility at milepoint 1.06 WB (0245-0100000A) | LS | 1 | $360,000 | $75,000 | $60,000 |
| 90 | Stripe removal (0225-0154000F) | LF | 63 | $5.00 | $5.00 | $5.87 |
| 91 | Temporary flexible pavement markers (0225-0149000E) | EACH | 20,425 | $1.10 | $4.00 | $1.50 |
| 92 | Permanent seeding (1030-0108000R) | ACRE | 1.25 | $4,400.00 | $4,400.00 | $4,450.00 |
| 93 | Pavement legend, type B-HS: arrows (0867-0103100E) | EACH | 62 | $350.00 | $350.00 | $360.00 |
| 94 | Extra for hand dug guardrail post holes (0810-0145000E) | EACH | 32 | $200.00 | $200.00 | $210.00 |
| 95 | 18 inch culvert pipe, 5 FT depth (0445-010018AF) | LF | 10 | $400.00 | $239.00 | $1,100.00 |
| 96 | Portable changeable message signs (0222-0164000E) | EACH | 2 | $9,000.00 | $17,000 | $13,500 |
| 97 | Legend removal (0225-0155100J) | SF | 286 | $4.00 | $4.00 | $4.69 |
| 98 | Furnish mpco material (0556-0300000J) | SY | 2,117 | $24.10 | $24.25 | $24.10 |
| 99 | Temporary water management facility at milepoint 0.44 WB (0245-0100000A) | LS | 1 | $2,800.00 | $28,000 | $60,000 |
| 100 | Concrete manholes, with inlet, large (0470-0103000E) | EACH | 2 | $17,000 | $24,000 | $38,000 |
| 101 | Construct mpco (0556-0500000J) | SY | 2,117 | $17.75 | $17.75 | $17.80 |
| 102 | BI-directional yellow type iar markers (0855-0103100E) | EACH | 74 | $10.00 | $10.00 | $10.25 |
| 103 | Thermoplastic, sprayed, surface, non-profiled (0865-0119600F) | LF | 165,000 | $1.12 | $1.12 | $1.15 |
| 104 | Guardrail, type 2A (0810-0104000F) | LF | 250 | $31.00 | $31.00 | $32.00 |
| 105 | Extra for asphalt approaches (0749-0100000E) | EACH | 35 | $1,250.00 | $2,000.00 | $1,100.00 |
| 106 | Poured joint seal (0585-0206100A) | LF | 182 | $56.46 | $551.10 | $71.43 |
| 107 | Class 2 preparation (0504-0100000J) | SY | 6 | $506.00 | $506.00 | $510.00 |
| 108 | Construct mpco (0556-0500000J) | SY | 1,186 | $17.75 | $17.75 | $17.80 |
| 109 | Guardrail transition (0810-0126000E) | EACH | 15 | $4,600.00 | $4,600.00 | $4,700.00 |
| 110 | Culvert drainage markers, type 2 (0842-0202000E) | EACH | 44 | $150.00 | $150.00 | $226.00 |
| 111 | Guardrail end pieces, type B (0810-0122000E) | EACH | 2 | $105.00 | $105.00 | $110.00 |
| 112 | 18 inch storm sewer pipe, 5 FT depth (0445-035018AF) | LF | 14 | $290.00 | $286.00 | $1,175.00 |
| 113 | Install 72 inch culvert pipe, 20 FT depth (0445-010070CF) | LF | 91 | $7,100.00 | $1,860.00 | $2,750.00 |
| 114 | Paved culvert end slopes (0460-0100000J) | SF | 823 | $70.00 | $113.00 | $90.00 |
| 115 | Delineators, type 1 (0840-0100000E) | EACH | 830 | $77.00 | $77.00 | $78.00 |
| 116 | Elastomeric concrete nosing (0584-0100000F) | LF | 182 | $104.60 | $105.00 | $105.00 |
| 117 | 18 inch storm sewer pipe, 20 FT depth (0445-035018CF) | LF | 56 | $650.00 | $1,664.00 | $850.00 |
| 118 | Automated flagger assistance device (0223-0200000E) | EACH | 2 | $3,800.00 | $16,000 | $2,750.00 |
| 119 | 6 inch asphalt concrete pavement repair (0748-0103000J) | SY | 1,500 | $19.00 | $70.00 | $57.00 |
| 120 | Bridge deck cold plane pavement removal, 2 inches deep (0503-0101000J) | SY | 747 | $10.50 | $11.00 | $15.60 |
| 121 | Metal median barrier (0810-0117000F) | LF | 100 | $83.25 | $83.00 | $125.00 |
| 122 | Bridge approach slab cold plane pavement removal, 2 1/2 inches deep (0503-0103100J) | SY | 180 | $10.50 | $21.00 | $26.10 |
| 123 | Guardrail terminals, flared (0810-0130000E) | EACH | 9 | $4,100.00 | $4,100.00 | $4,200.00 |
| 124 | PG 64-22 asphalt in level 3, 1/2 inch ACP (0745-0620000M) | TON | 2,537 | $1.00 | $1.00 | $610.00 |
| 125 | Pilot cars (0223-0172000T) | HR | 120 | $85.70 | $105.00 | $92.00 |
| 126 | Flaggers (0223-0168000T) | HR | 1,300 | $78.50 | $84.00 | $78.00 |
| 127 | Level 3, 1/2 inch ACP (0745-0302000M) | TON | 42,290 | $109.50 | $133.50 | $98.00 |
| 128 | 8 foot type C protective fence (1050-0224000F) | LF | 180 | $240.00 | $115.00 | $200.00 |
| 129 | Sloped end sections, 72 inch (0445-0700700E) | EACH | 1 | $1,300.00 | $431.00 | $13,250 |
| 130 | Temporary striping (0225-0153000F) | LF | 174,457 | $0.21 | $0.21 | $0.25 |
| 131 | Bridge identification markers (0842-0401000E) | EACH | 5 | $250.00 | $250.00 | $260.00 |
| 132 | 24 inch storm sewer pipe, 10 FT depth (0445-035024BF) | LF | 189 | $525.00 | $650.00 | $925.00 |
| 133 | 18 inch storm sewer pipe, 10 FT depth (0445-035018BF) | LF | 89 | $405.00 | $686.00 | $630.00 |
| 134 | Remove asbestos material, non-friable (0295-0200000F) | LF | 178 | $35.00 | $50.00 | $108.00 |
| 135 | Furnish mpco material (0556-0300000J) | SY | 1,186 | $24.25 | $24.25 | $24.10 |
| 136 | BI-directional yellow type iar markers, recessed (0855-0107100E) | EACH | 1,670 | $15.50 | $15.50 | $15.60 |
| 137 | Permanent surface mounted tubular markers (0856-0101000E) | EACH | 76 | $160.00 | $160.00 | $161.00 |
| 138 | Temporary water management facility at milepoint 1.04 WB (0245-0100000A) | LS | 1 | $3,200.00 | $28,000 | $60,000 |
| 139 | Construct mpco (0556-0500000J) | SY | 2,117 | $17.75 | $17.75 | $17.80 |
| 140 | Temporary water management facility at milepoint 0.19 WB (0245-0100000A) | LS | 1 | $2,800.00 | $28,000 | $60,000 |
| 141 | Contaminated soil disposal (0294-0200010M) | TON | 243 | $120.00 | $212.00 | $135.00 |
| 142 | Class 2 preparation (0504-0100000J) | SY | 42 | $368.50 | $334.00 | $340.00 |
| 143 | Class 2 preparation (0504-0100000J) | SY | 42 | $335.00 | $369.00 | $370.00 |
| 144 | Aggregate base (0641-0102000M) | TON | 901 | $95.75 | $78.00 | $58.00 |
| 145 | Midwest guardrail system, type 2A (0810-0146100F) | LF | 19,806 | $24.05 | $24.00 | $25.00 |
| 146 | Sediment barrier, type 3 (0280-0115030F) | LF | 2,250 | $2.25 | $5.00 | $4.25 |
| 147 | Guardrail height conversion, type 2A (0810-0147000E) | EACH | 2 | $950.00 | $950.00 | $960.00 |
| 148 | Inlet protection, type 3 (0280-0114030E) | EACH | 6 | $55.00 | $75.00 | $150.00 |
| 149 | 24 inch culvert pipe, 10 FT depth (0445-010024BF) | LF | 130 | $450.00 | $578.00 | $650.00 |
| 150 | Extra for manholes over existing sewers (0490-0123000E) | EACH | 2 | $3,600.00 | $6,200.00 | $30,000 |
| 151 | Trench resurfacing (0495-0100000J) | SY | 1,002 | $135.00 | $144.00 | $220.00 |
| 152 | Cold plane pavement removal, 6 inches deep (0620-0125000J) | SY | 3,295 | $5.90 | $12.00 | $10.60 |
| 153 | Furnish mpco material (0556-0300000J) | SY | 2,117 | $24.10 | $24.25 | $24.10 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of February 20, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.