ODOT contract 15582 bid tabulation

Umatilla/morrow county curb ramps phase 2b. Let by Oregon DOT on February 6, 2025, Region 5. 7 bids received.

Owner
Oregon DOT
Letting
06 FEB 2025
Pay items
83
Data through
13 AUG 2026

Bidders

RankTotal bidAgainst the low bid
1Low
2
3
4
5
6
7
ODOT contract 15582: bids by rank

Bid tabulation

LinePay itemUnitQuantityRank 1Rank 2Rank 3Rank 4Rank 5Rank 6
1Remove and reinstall existing signs (0905-0101000A)LS1$500.00$3,900.00$3,210.00$3,000.00$49,680$4,500.00
2Cinder mulch (1040-0192000K)CY2.30$1,000.00$280.00$940.00$900.00$307.80$800.00
3Concrete inlets, type G-2 (0470-0315000E)EACH9$3,400.00$2,700.00$4,590.00$5,500.00$3,780.00$4,500.00
46 inch ductile iron pipe with class A backfill (1140-0400000F)LF36$369.00$160.00$290.00$200.00$534.60$600.00
5Legend removal (0225-0155100J)SF1,056$5.00$3.50$3.25$1.50$8.10$2.75
6Asphalt pavement sawcutting (0310-0119000F)LF3,600$5.00$3.00$8.00$12.00$7.02$13.00
7Rock mulch (1040-0196000M)TON109$200.00$220.00$165.00$160.00$162.00$140.00
8Signs, standard sheeting, plywood (0940-0203000J)SF559$52.00$51.00$43.00$26.00$48.06$26.50
9Concrete curbs, curb and gutter (0759-0103000F)LF3,123$70.00$47.00$56.00$75.00$48.00$58.10
10Aggregate base (0640-0100000M)TON1,484$81.00$55.00$92.00$25.00$51.84$20.00
11Concrete curbs, standard curb, modified (0759-0112000F)LF222$131.00$44.00$59.00$75.00$46.41$58.10
12Moving existing hydrants (1160-0102000E)EACH4$6,800.00$3,400.00$2,980.00$3,000.00$11,340$3,000.00
13Concrete driveways (0759-0126000J)SF698$20.00$18.00$19.00$30.00$24.84$16.10
14Pole foundations (0970-0100000A)EACH1$65,000$95,000$68,960$12,000$99,360$10,000
15Temporary plastic drums (0224-0145000E)EACH90$40.00$45.00$55.00$80.00$54.00$38.00
16Concrete walks (0759-0128000J)SF22,784$14.00$10.80$15.00$20.00$11.82$11.15
17Flashing beacon, OR207 at W hartley (0990-0106000A)EACH1$62,000$79,000$57,830$65,000$64,828$80,000
18Chain link fence, type CL- 6R (1050-0135000F)LF20$420.00$480.00$410.00$100.00$383.40$180.00
19Concrete curbs, standard curb (0759-0110000F)LF21$151.00$44.00$86.00$90.00$84.60$58.10
20Extra for asphalt approaches (0749-0100000E)EACH1$1,000.00$1,000.00$3,760.00$3,000.00$2,727.00$1,800.00
21Inlet protection, type 3 (0280-0114030E)EACH20$77.00$75.00$137.00$50.00$135.00$130.00
22Soil sample collection and analytical testing (0294-0700000E)EACH5$2,000.00$1,200.00$2,060.00$2,500.00$945.00$1,800.00
23Commercial asphalt concrete pavement (0740-0100000M)TON311$369.00$375.00$350.00$450.00$361.80$275.00
24Sod lawn (1040-0189000J)SY273$36.00$120.00$26.00$25.00$48.60$22.00
25Flashing beacon, US730 at S first ST (0990-0106000A)EACH1$16,000$24,000$14,445$20,000$17,977$25,000
26Perforated steel square tube slip base sign supports (0930-0114000A)LB1,985.30$10.07$17.63$14.39$15.11$28.08$15.11
27Removal of inlets (0310-0104000E)EACH9$1,200.00$1,500.00$970.00$1,700.00$1,701.00$1,175.00
28Bar removal (0225-0156000J)SF3,473$7.00$6.00$6.00$2.00$9.94$4.85
29Sequential arrow signs (0222-0162000E)EACH3$700.00$3,200.00$4,290.00$500.00$1,620.00$4,500.00
30Stripe removal (0225-0154000F)LF252$5.00$2.00$1.75$0.75$5.24$1.50
31Temporary walks (0228-0167680J)SF1,000$9.00$9.00$15.00$13.00$7.56$10.00
32Segregate and stockpile contaminated soil (0294-0600000A)LS1$18,000$9,700.00$4,290.00$1,000.00$1.08$15,000
33Removal of pipes (0310-0100000F)LF23$110.00$300.00$104.00$50.00$378.00$60.00
34Sign support footings (0920-0100000A)CY2.88$5,208.33$16,667$13,536$4,861.11$9,396.00$6,250.00
35Ductile iron pipe bend, 6 inch (1140-0650000E)EACH4$900.00$1,000.00$670.00$300.00$1,296.00$1,100.00
366 inch gate valve (1150-0100000E)EACH1$2,100.00$3,500.00$4,570.00$3,000.00$2,592.00$4,800.00
37Adjusting inlets (0490-0105000E)EACH2$1,200.00$430.00$890.00$1,500.00$1,706.40$1,200.00
38Temporary signs (0222-0102000J)SF1,686$12.00$28.00$11.00$22.00$19.44$25.00
3912 inch storm sewer pipe, 5 FT depth (0445-035012AF)LF59$284.00$190.00$280.00$125.00$540.00$325.00
40Valley gutter concrete surfacing (0759-0135000J)SF149$38.00$15.00$41.00$50.00$47.69$36.10
41Pavement bar, type B (0867-0145000J)SF3,637$26.00$16.00$12.70$12.70$13.18$12.70
42Flashing beacon, OR207 at W joseph ave (0990-0106000A)EACH1$70,000$83,000$60,440$67,000$67,650$80,000
43Inlet protection, type 11 (0280-0114110E)EACH1$110.00$105.00$270.00$50.00$216.00$200.00
44Contaminated soil disposal (0294-0200010M)TON292$85.00$88.00$106.00$25.00$118.80$90.00
45Adjusting boxes (0490-0100000E)EACH34$350.00$110.00$520.00$150.00$648.00$450.00
46Traffic signal modification, US395 at E highland ave (0990-0106000A)EACH1$24,000$26,000$20,580$25,000$24,598$70,000
47Topsoil (1040-0101000K)CY50$133.00$220.00$350.00$150.00$270.00$200.00
48Extra for new curb ramps (0759-0154100E)EACH86$900.00$760.00$1,060.00$2,000.00$1,188.00$1,200.00
49Truncated domes on new surfaces (0759-0510000J)SF1,217$44.00$36.00$38.00$38.00$32.63$38.10
50Removal of surfacings for curb ramp construction (0310-0106101J)SY5,549$31.00$54.00$61.00$65.00$44.28$65.00
516 inch storm sewer pipe, 5 FT depth (0445-035006AF)LF16$266.00$170.00$310.00$100.00$1,026.00$480.00
52Concrete inlets, type G-1 (0470-0313000E)EACH2$3,500.00$2,500.00$2,770.00$5,500.00$4,536.00$4,500.00
53Minor adjustment of manholes (0490-0120000E)EACH6$500.00$650.00$1,220.00$2,000.00$1,458.00$650.00
54Pavement legend, type B: arrows (0867-0103000E)EACH18$450.00$350.00$350.00$350.00$270.00$350.00
55Longitudinal pavement markings - paint (0860-0200000F)LF111$14.00$6.00$5.00$5.00$10.80$5.00
56Pollution control plan (0290-0100000A)LS1$500.00$1,800.00$1,500.00$2,000.00$324.00$500.00
57Inlet protection, type 10 (0280-0114100E)EACH5$80.00$92.00$144.00$50.00$167.40$180.00
58Traffic signal modification, US395 at E theater LN (0990-0106000A)EACH1$15,000$17,000$13,505$20,000$16,959$65,000
59Lead compliance plan (0294-0500000A)LS1$2,500.00$4,000.00$1,500.00$1,000.00$2,160.00$1,500.00
60Connection to existing structures (0490-0104000E)EACH16$1,000.00$320.00$1,620.00$1,500.00$1,614.60$1,000.00
61Crosswalk closure supports (0902-0101000E)EACH4$1,500.00$1,800.00$1,505.00$1,500.00$1,566.00$1,000.00
62Pedestrian channelizing devices (0228-0141600F)LF900$23.00$24.00$18.00$20.00$16.20$6.25
63Cold plane pavement removal, 0 - 1 inches deep (0620-0103000J)SY15$62.00$108.00$250.00$65.00$97.20$100.00
64Cold plane pavement removal, 2 inches deep (0620-0120000J)SY63$69.00$108.00$250.00$65.00$129.60$40.00
65Flashing beacon, OR207 at M.P. 7.92 (DR wendell ford ave) (0990-0106000A)EACH1$21,000$30,000$19,065$25,000$22,963$30,000
66Inlet protection, type 7 (0280-0114070E)EACH16$80.00$110.00$140.00$50.00$243.00$150.00
67Traffic signal modification, US395 at OR207 (elm ave) (0990-0106000A)EACH1$15,000$15,000$11,965$20,000$15,294$60,000
68Temporary curb ramp, parallel (0228-0167670E)EACH4$1,800.00$1,800.00$1,100.00$2,500.00$1,350.00$1,800.00
69Level 3, 1/2 inch ACP mixture (0744-0302000M)TON31$369.00$375.00$430.00$500.00$486.00$295.00
70Temporary barricades, type II (0224-0104000E)EACH30$90.00$110.00$43.00$75.00$70.20$65.00
71Traffic signal modification, US395 at W hermiston ave - E gladys ave (0990-0106000A)EACH1$8,500.00$9,000.00$7,230.00$10,000$10,180$40,000
72Bollards (0815-0100000E)EACH3$1,500.00$1,000.00$410.00$1,200.00$1,620.00$1,050.00
73Lighting poles and arms (0970-0200000A)EACH1$7,000.00$8,000.00$6,445.00$9,000.00$9,335.52$11,000
74Truncated domes on existing surfaces (0759-0520000J)SF20$95.00$36.00$84.00$60.00$107.69$60.10
75Hydrant assemblies (1160-0100000E)EACH4$8,000.00$8,800.00$10,680$5,000.00$9,180.00$10,550
76Remove existing signs (0905-0100000A)LS1$2,500.00$730.00$605.00$5,000.00$24,408$4,500.00
77Luminaires, lamps, and ballasts (0970-0104000A)EACH1$1,500.00$1,500.00$1,120.00$2,000.00$1,205.28$5,000.00
78Switching, conduit, and wiring (0970-0105000A)LF1$50,000$30,000$16,680$22,000$18,011$10,000
79Mainline video inspection (0415-0100000F)LF75$30.00$48.00$49.00$20.00$45.36$20.00
80Flaggers (0223-0168000T)HR490$92.00$74.00$92.00$82.00$89.64$69.00
81Reinforced concrete pavement repair (0758-0202000J)SY15$511.00$1,025.00$610.00$450.00$186.84$750.00
82Traffic signal modification, US395 at SE 4TH ST (0990-0106000A)EACH1$11,000$12,000$9,675.00$12,000$12,823$50,000
83Temporary barricades, type III (0224-0105000E)EACH16$100.00$190.00$74.00$75.00$81.00$195.00
ODOT contract 15582: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.

Every contract let that day: ODOT letting of February 6, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy