ODOT contract 15586 bid tabulation
Or62: lost creek lake bridge. Let by Oregon DOT on February 5, 2026, Region 3. 10 bids received.
- Owner
- Oregon DOT
- Letting
- 05 FEB 2026
- Pay items
- 63
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 | ||
| 7 | ||
| 8 | ||
| 9 | ||
| 10 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 | Rank 5 | Rank 6 |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Midwest guardrail system, type 2A (0810-0146100F) | LF | 162.50 | $36.00 | $36.00 | $40.00 | $36.00 | $40.00 | $40.00 |
| 2 | Extra for hand dug guardrail post holes (0810-0145000E) | EACH | 10 | $250.00 | $250.00 | $250.00 | $250.00 | $275.00 | $225.00 |
| 3 | Bridge removal work (0501-0100000A) | SF | 852 | $5.35 | $117.37 | $64.55 | $82.16 | $35.21 | $352.11 |
| 4 | Temporary plastic drums (0224-0145000E) | EACH | 43 | $45.00 | $50.00 | $100.00 | $45.00 | $50.00 | $40.00 |
| 5 | Precompressed foam silicone joint seal (0585-0215000A) | LF | 44 | $123.86 | $113.64 | $136.36 | $340.91 | $136.36 | $136.36 |
| 6 | Cold plane pavement removal, 3 inches deep (0620-0122000J) | SY | 527 | $4.50 | $8.00 | $14.00 | $5.10 | $23.00 | $12.00 |
| 7 | Concrete deck micro-milling, 1 1/2 inch depth (0505-0100000J) | SY | 7,910 | $14.00 | $13.00 | $18.00 | $14.00 | $12.50 | $40.00 |
| 8 | Minimum deflection bridge temporary barrier (0226-0147000F) | LF | 3,680 | $60.00 | $26.00 | $42.00 | $59.00 | $65.00 | $51.00 |
| 9 | Midwest guardrail system, type 3 (0810-0146100F) | LF | 37.50 | $80.00 | $80.00 | $85.00 | $80.00 | $88.00 | $85.00 |
| 10 | Deep cut hydrodemolition, 1 inch depth (0505-0102000J) | SY | 362 | $93.00 | $95.00 | $100.00 | $95.00 | $102.00 | $65.00 |
| 11 | Repair temporary impact attenuator, narrow site system (0226-0141300E) | EACH | 4 | $25.00 | $1.00 | $100.00 | $2,000.00 | $2,000.00 | $1.00 |
| 12 | Moving temporary impact attenuators, narrow site system (0226-0137000E) | EACH | 2 | $1,750.00 | $800.00 | $1,500.00 | $3,000.00 | $2,000.00 | $1,235.00 |
| 13 | Poured joint seal (0585-0206100A) | LF | 233 | $0.26 | $4.29 | $64.38 | $64.38 | $85.84 | $51.50 |
| 14 | Pollution control plan (0290-0100000A) | LS | 1 | $500.00 | $500.00 | $1,000.00 | $5,000.00 | $750.00 | $2,000.00 |
| 15 | Flagger station lighting (0223-0168100E) | EACH | 3 | $1,500.00 | $100.00 | $500.00 | $1,800.00 | $250.00 | $500.00 |
| 16 | Temporary pavement bars (0225-0153200J) | SF | 36 | $6.00 | $6.00 | $10.00 | $6.00 | $10.00 | $6.00 |
| 17 | Constructing elastomeric concrete nosing (0584-0104000J) | SF | 50 | $154.00 | $195.00 | $150.00 | $170.00 | $345.00 | $400.00 |
| 18 | Reconditioning existing roadway (0610-0103000A) | LS | 1 | $11,250 | $500.00 | $2,000.00 | $15,000 | $7,500.00 | $12,000 |
| 19 | Bridge identification markers (0842-0401000E) | EACH | 2 | $500.00 | $250.00 | $500.00 | $250.00 | $300.00 | $400.00 |
| 20 | Concrete deck micro-milling, 1 inch depth (0505-0100000J) | SY | 362 | $10.00 | $14.00 | $18.00 | $15.00 | $15.00 | $30.00 |
| 21 | Construct structural concrete overlay (0559-0302000J) | SY | 8,271 | $44.50 | $52.00 | $80.00 | $26.00 | $45.00 | $40.00 |
| 22 | Selective hydrodemolition (0505-0101000J) | SY | 7,910 | $57.50 | $65.00 | $80.00 | $65.00 | $84.00 | $45.00 |
| 23 | Portable changeable message signs (0222-0164000E) | EACH | 2 | $3,000.00 | $7,500.00 | $15,000 | $10,000 | $5,000.00 | $5,000.00 |
| 24 | Structural concrete overlay material (0559-0300000K) | CY | 574 | $950.00 | $915.00 | $400.00 | $975.00 | $1,250.00 | $800.00 |
| 25 | Check dam, type 3 (0280-0106030E) | EACH | 2 | $500.00 | $200.00 | $400.00 | $400.00 | $150.00 | $150.00 |
| 26 | Reinforcement, grade 60 (0530-0104000A) | LB | 330 | $14.55 | $37.88 | $12.12 | $30.30 | $9.09 | $24.24 |
| 27 | Guardrail terminals, flared (0810-0130000E) | EACH | 1 | $3,500.00 | $3,500.00 | $4,000.00 | $3,500.00 | $3,800.00 | $4,500.00 |
| 28 | Asphalt pavement sawcutting, 8 inches deep (0310-0119100F) | LF | 205 | $8.00 | $10.09 | $5.00 | $4.00 | $11.00 | $20.00 |
| 29 | Level 3, 1/2 inch ACP mixture (0744-0302000M) | TON | 310 | $170.00 | $190.00 | $220.00 | $199.00 | $189.00 | $190.00 |
| 30 | Guardrail transition (0810-0126000E) | EACH | 4 | $3,500.00 | $3,500.00 | $4,000.00 | $3,500.00 | $3,800.00 | $4,200.00 |
| 31 | Guardrail height conversion, type 2A (0810-0147000E) | EACH | 1 | $1,500.00 | $1,500.00 | $2,000.00 | $1,495.00 | $1,500.00 | $1,600.00 |
| 32 | Permanent reflective barrier panels (0840-0105500E) | EACH | 424 | $35.00 | $32.50 | $10.00 | $35.00 | $35.00 | $31.29 |
| 33 | Portable traffic signal, lost creek lake bridge (0227-0158100A) | LS | 1 | $28,500 | $35,000 | $33,000 | $60,000 | $42,000 | $40,000 |
| 34 | Bar removal (0225-0156000J) | SF | 36 | $8.00 | $8.00 | $10.00 | $8.00 | $10.00 | $8.00 |
| 35 | Delineators, type 4 alternate 2 (0840-0104200E) | EACH | 13 | $50.00 | $50.00 | $50.00 | $50.00 | $100.00 | $20.00 |
| 36 | Temporary reflective pavement markers (0225-0148000E) | EACH | 300 | $8.50 | $1.50 | $5.00 | $3.50 | $5.00 | $8.00 |
| 37 | Wood sign posts (0910-0100000K) | FBM | 396 | $20.00 | $18.00 | $18.00 | $18.00 | $20.00 | $15.00 |
| 38 | Midwest guardrail system, type 4 (0810-0146100F) | LF | 87 | $65.00 | $65.00 | $70.00 | $65.00 | $70.00 | $145.00 |
| 39 | Modified tube retrofit (0587-0139000A) | LF | 3,393 | $130.43 | $137.05 | $117.89 | $162.10 | $145.89 | $198.94 |
| 40 | Temporary barricades, type III (0224-0105000E) | EACH | 6 | $200.00 | $200.00 | $200.00 | $175.00 | $200.00 | $150.00 |
| 41 | Thermoplastic, sprayed, surface, non-profiled (0865-0119600F) | LF | 6,100 | $1.85 | $2.00 | $1.85 | $1.85 | $1.97 | $1.85 |
| 42 | Bridge approach slab cold plane pavement removal, 3 inches deep (0503-0103100J) | SY | 130 | $16.00 | $22.00 | $40.00 | $25.00 | $75.00 | $20.00 |
| 43 | General structural concrete, class 3300 (0540-0301000A) | CY | 1 | $9,000.00 | $20,000 | $10,000 | $20,000 | $12,000 | $12,000 |
| 44 | Elastomeric concrete nosing material (0584-0103000C) | CF | 32 | $220.00 | $310.00 | $220.00 | $105.00 | $215.00 | $220.00 |
| 45 | Cold plane pavement removal, 5 1/2 inches deep (0620-0125000J) | SY | 643 | $6.00 | $15.00 | $24.00 | $13.75 | $33.00 | $15.00 |
| 46 | Pavement bar, type B-HS (0867-0145100J) | SF | 28.50 | $30.00 | $35.00 | $30.00 | $30.00 | $50.00 | $30.00 |
| 47 | Saw cut texturing (0559-0401000J) | SY | 7,733 | $5.25 | $5.75 | $8.00 | $4.95 | $6.00 | $5.24 |
| 48 | Guardrail terminals, non-flared (0810-0129000E) | EACH | 2 | $3,400.00 | $3,400.00 | $4,000.00 | $3,400.00 | $3,800.00 | $4,500.00 |
| 49 | Signs, standard sheeting, plywood (0940-0203000J) | SF | 32.50 | $40.00 | $35.00 | $35.00 | $35.00 | $39.00 | $30.00 |
| 50 | Signs, standard sheeting, sheet aluminum (0940-0202000J) | SF | 55.30 | $36.00 | $30.00 | $30.00 | $30.00 | $33.00 | $30.00 |
| 51 | Reflective barrier panels (0226-0141100E) | EACH | 157 | $37.00 | $28.00 | $40.00 | $37.00 | $40.00 | $33.00 |
| 52 | Delineators, type 1 (0840-0100000E) | EACH | 13 | $85.00 | $75.00 | $75.00 | $75.00 | $100.00 | $125.00 |
| 53 | Flaggers (0223-0168000T) | HR | 200 | $85.00 | $70.00 | $100.00 | $68.00 | $50.00 | $95.00 |
| 54 | Temporary signs (0222-0102000J) | SF | 410 | $33.00 | $16.00 | $20.00 | $16.00 | $25.00 | $30.00 |
| 55 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $5,730.00 | $10,000 | $8,000.00 | $20,000 | $2,000.00 | $5,000.00 |
| 56 | Temporary impact attenuator, narrow site system (0226-0134000E) | EACH | 2 | $3,850.00 | $9,000.00 | $15,000 | $6,000.00 | $4,000.00 | $5,500.00 |
| 57 | Temporary barricades, type II (0224-0104000E) | EACH | 2 | $100.00 | $75.00 | $100.00 | $60.00 | $60.00 | $40.00 |
| 58 | Construct grading at guardrail terminals (0810-0142100E) | EACH | 3 | $1,000.00 | $4,250.00 | $2,000.00 | $2,000.00 | $2,500.00 | $5,000.00 |
| 59 | Pilot cars (0223-0172000T) | HR | 80 | $110.00 | $85.00 | $115.00 | $78.00 | $100.00 | $120.00 |
| 60 | Temporary striping (0225-0153000F) | LF | 450 | $2.00 | $2.00 | $2.00 | $2.00 | $3.00 | $2.00 |
| 61 | BI-directional yellow type iar markers (0855-0103100E) | EACH | 47 | $25.00 | $25.00 | $25.00 | $25.00 | $30.00 | $25.00 |
| 62 | Remove existing signs (0905-0100000A) | LS | 1 | $350.00 | $500.00 | $500.00 | $5,000.00 | $450.00 | $1,500.00 |
| 63 | Stripe removal (0225-0154000F) | LF | 690 | $5.00 | $5.00 | $5.00 | $6.00 | $5.33 | $5.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of February 5, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.