ODOT contract 15595 bid tabulation
Or126b: westbound springfield (willamette river) bridge. Let by Oregon DOT on April 3, 2025, Region 2. 6 bids received.
- Owner
- Oregon DOT
- Letting
- 03 APR 2025
- Pay items
- 80
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 | Rank 5 | Rank 6 |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Trench resurfacing (0495-0100000J) | SY | 25 | $130.00 | $250.00 | $185.00 | $220.00 | $16.75 | $285.00 |
| 2 | Inlet protection, type 4 (0280-0114040E) | EACH | 1 | $200.00 | $150.00 | $210.00 | $425.00 | $140.00 | $600.00 |
| 3 | Level 3, 1/2 inch ACP mixture (0744-0302000M) | TON | 20 | $360.00 | $500.00 | $400.00 | $488.00 | $400.00 | $285.00 |
| 4 | Soil conditioner (1040-0107000K) | CY | 15 | $124.00 | $130.00 | $90.00 | $124.00 | $140.00 | $124.00 |
| 5 | Bridge removal work (0501-0100000A) | SF | 794 | $25.19 | $25.19 | $94.46 | $62.97 | $0.63 | $327.46 |
| 6 | Precompressed foam silicone joint seal (0585-0215000A) | LF | 214 | $84.11 | $93.46 | $135.51 | $95.79 | $116.82 | $84.11 |
| 7 | Sloped end sections, 12 inch (0445-0700120E) | EACH | 1 | $900.00 | $700.00 | $1,425.00 | $750.00 | $1,450.00 | $1,500.00 |
| 8 | Temporary striping (0225-0153000F) | LF | 670 | $3.00 | $2.00 | $3.00 | $3.00 | $3.40 | $3.00 |
| 9 | Temporary barricades, type II (0224-0104000E) | EACH | 4 | $65.00 | $100.00 | $80.00 | $65.00 | $50.00 | $75.00 |
| 10 | Temporary plastic drums (0224-0145000E) | EACH | 24 | $50.00 | $100.00 | $45.00 | $50.00 | $35.00 | $65.00 |
| 11 | Pollution control plan (0290-0100000A) | LS | 1 | $1,000.00 | $1,000.00 | $500.00 | $2,500.00 | $2,000.00 | $1,500.00 |
| 12 | Plastic sheeting (0280-0101000J) | SY | 400 | $4.22 | $2.00 | $2.50 | $10.00 | $16.75 | $8.00 |
| 13 | Flaggers (0223-0168000T) | HR | 300 | $70.50 | $70.00 | $72.00 | $75.00 | $90.00 | $70.50 |
| 14 | Surface texturing (0540-0401000J) | SY | 2,932 | $6.25 | $8.00 | $5.70 | $7.50 | $7.00 | $5.51 |
| 15 | Work containment plan (0290-0102000A) | LS | 1 | $1,000.00 | $1,000.00 | $10,000 | $2,500.00 | $2,000.00 | $25,000 |
| 16 | Selective hydrodemolition (0505-0101000J) | SY | 3,274 | $64.00 | $120.00 | $55.10 | $132.50 | $150.00 | $70.00 |
| 17 | Refurbishing and reinstalling existing illumination systems (0970-0106000A) | LS | 1 | $10,500 | $12,000 | $15,000 | $10,500 | $13,400 | $10,190 |
| 18 | Soil sample collection and analytical testing (0294-0700000E) | EACH | 2 | $3,000.00 | $1,500.00 | $2,950.00 | $4,750.00 | $1,500.00 | $3,500.00 |
| 19 | Concrete walks (0759-0128000J) | SF | 545.50 | $10.00 | $40.00 | $13.00 | $17.50 | $17.00 | $41.00 |
| 20 | Construct and remove temporary roadbed and surfacing (0230-0200000A) | LS | 1 | $41,130 | $50,000 | $120,000 | $65,000 | $50,000 | $185,000 |
| 21 | Temporary barricades, type III (0224-0105000E) | EACH | 15 | $185.00 | $200.00 | $200.00 | $185.00 | $250.00 | $225.00 |
| 22 | Inlet protection, type 3 (0280-0114030E) | EACH | 3 | $150.00 | $150.00 | $210.00 | $400.00 | $140.00 | $120.00 |
| 23 | Topsoil (1040-0101000K) | CY | 2 | $210.00 | $225.00 | $150.00 | $210.00 | $235.00 | $210.00 |
| 24 | Sediment barrier, type 3 (0280-0115030F) | LF | 325 | $5.00 | $6.00 | $7.50 | $5.00 | $5.60 | $5.00 |
| 25 | Repair temporary impact attenuator, truck mounted (0226-0141400E) | EACH | 4 | $1,000.00 | $0.01 | $1.00 | $1.00 | $1.10 | $1.00 |
| 26 | Bridge identification markers (0842-0401000E) | EACH | 2 | $390.00 | $300.00 | $375.00 | $275.00 | $300.00 | $350.00 |
| 27 | Concrete curbs (0759-0100000F) | LF | 40.40 | $60.00 | $175.00 | $40.00 | $72.50 | $46.00 | $62.02 |
| 28 | Concrete inlets, type CG-2 (0470-0307000E) | EACH | 5 | $4,000.00 | $6,000.00 | $4,200.00 | $3,050.00 | $3,000.00 | $4,500.00 |
| 29 | Concrete repair (0542-0102000J) | SY | 1 | $4,000.00 | $5,000.00 | $1,200.00 | $6,500.00 | $9,000.00 | $8,500.00 |
| 30 | Temporary work access and containment (0253-0106000A) | LS | 1 | $442,500 | $10,000 | $3,500.00 | $1,000.00 | $500.00 | $500,000 |
| 31 | Structure excavation (0510-0101000A) | CY | 22 | $136.36 | $136.36 | $113.64 | $136.36 | $113.64 | $250.00 |
| 32 | Shrubs, #2 container (1040-0154000E) | EACH | 88 | $35.00 | $35.00 | $18.00 | $35.00 | $39.00 | $35.00 |
| 33 | Pavement legend, type B-HS: arrows (0867-0103100E) | EACH | 6 | $550.00 | $550.00 | $550.00 | $550.00 | $620.00 | $3,300.00 |
| 34 | Granular structure backfill (0510-0108000A) | CY | 22 | $136.36 | $136.36 | $140.91 | $122.73 | $113.64 | $275.00 |
| 35 | Lawn seeding (1030-0138000J) | SY | 358 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 36 | 12 inch storm sewer pipe, 5 FT depth (0445-035012AF) | LF | 63 | $147.00 | $300.00 | $275.00 | $270.00 | $280.00 | $250.00 |
| 37 | Straw bale (0280-0119000E) | EACH | 5 | $80.00 | $100.00 | $20.00 | $175.00 | $100.00 | $180.00 |
| 38 | Bark mulch (1040-0190000K) | CY | 18 | $98.00 | $100.00 | $65.00 | $98.00 | $110.00 | $98.00 |
| 39 | Pavement legend, type B-HS: "only" (0867-0107100E) | EACH | 1 | $1,200.00 | $1,200.00 | $1,200.00 | $1,200.00 | $1,340.00 | $1,200.00 |
| 40 | Concrete washout facility (0280-0112500E) | EACH | 1 | $1,000.00 | $1,000.00 | $4,500.00 | $5,000.00 | $2,500.00 | $10,000 |
| 41 | Automated flagger assistance device (0223-0200000E) | EACH | 3 | $4,400.00 | $1,000.00 | $650.00 | $3,500.00 | $9,000.00 | $14,500 |
| 42 | Concrete deck micro-milling, 1 1/2 inch depth (0505-0100000J) | SY | 3,274 | $5.60 | $22.00 | $6.05 | $50.00 | $15.00 | $44.68 |
| 43 | Adjusting inlets (0490-0105000E) | EACH | 1 | $2,000.00 | $2,000.00 | $2,100.00 | $1,000.00 | $3,000.00 | $1,850.00 |
| 44 | Segregate and stockpile contaminated soil (0294-0600000A) | LS | 1 | $4,000.00 | $100.00 | $2,000.00 | $5,900.00 | $13,000 | $5,000.00 |
| 45 | Stripe removal (0225-0154000F) | LF | 280 | $5.00 | $3.00 | $5.00 | $5.00 | $5.60 | $5.00 |
| 46 | Portable changeable message signs (0222-0164000E) | EACH | 4 | $7,000.00 | $10,000 | $3,500.00 | $7,000.00 | $3,500.00 | $17,000 |
| 47 | Temporary impact attenuator, truck mounted (0226-0138000E) | EACH | 2 | $5,000.00 | $10,000 | $3,500.00 | $12,500 | $12,000 | $15,000 |
| 48 | Irrigation system (1120-0100000A) | LS | 1 | $16,000 | $10,000 | $16,000 | $15,900 | $17,500 | $15,900 |
| 49 | Structural concrete overlay material (0559-0300000K) | CY | 228 | $450.00 | $500.00 | $650.00 | $650.00 | $625.00 | $450.00 |
| 50 | Aggregate base (0640-0100000M) | TON | 36 | $86.00 | $45.00 | $150.00 | $100.00 | $150.00 | $275.00 |
| 51 | Legend removal (0225-0155100J) | SF | 192 | $12.00 | $6.00 | $12.00 | $12.00 | $13.50 | $12.00 |
| 52 | Constructing elastomeric concrete nosing (0584-0104000J) | SF | 221 | $50.00 | $175.00 | $225.00 | $180.00 | $80.00 | $202.56 |
| 53 | Metal handrail, 3 rails (1069-0100000F) | LF | 11 | $400.00 | $250.00 | $300.00 | $750.00 | $325.00 | $909.00 |
| 54 | Concrete driveways (0759-0126000J) | SF | 971 | $12.00 | $50.00 | $16.20 | $19.00 | $19.50 | $31.00 |
| 55 | Pedestrian channelizing devices (0228-0141600F) | LF | 24 | $27.00 | $50.00 | $26.00 | $65.00 | $25.00 | $35.00 |
| 56 | Sediment fence (0280-0113000F) | LF | 226 | $4.00 | $5.00 | $7.00 | $4.00 | $4.50 | $4.00 |
| 57 | Thermoplastic, wet weather, grooved, non-profiled (0865-0207000F) | LF | 580 | $15.00 | $15.00 | $15.00 | $15.00 | $16.75 | $15.00 |
| 58 | Sequential arrow signs (0222-0162000E) | EACH | 3 | $2,500.00 | $2,500.00 | $1,500.00 | $2,500.00 | $1,000.00 | $4,500.00 |
| 59 | Reinforced concrete bridge approach slabs (0545-0100100J) | SY | 64 | $380.00 | $625.00 | $575.00 | $800.00 | $900.00 | $825.00 |
| 60 | Inlet protection, type 11 (0280-0114110E) | EACH | 8 | $150.00 | $150.00 | $210.00 | $450.00 | $140.00 | $130.00 |
| 61 | Deciduous trees, 2 inch caliper (1040-0130000E) | EACH | 4 | $500.00 | $500.00 | $400.00 | $500.00 | $560.00 | $500.00 |
| 62 | Concrete curbs, curb and gutter (0759-0103000F) | LF | 265 | $42.00 | $175.00 | $51.00 | $76.50 | $54.00 | $80.00 |
| 63 | Cold plane pavement removal, 2 inches deep (0620-0120000J) | SY | 177 | $36.00 | $30.00 | $31.00 | $15.00 | $31.00 | $44.68 |
| 64 | Health and safety plan (0294-0100000A) | LS | 1 | $1,350.00 | $1,000.00 | $1,500.00 | $6,500.00 | $15,000 | $15,000 |
| 65 | Temporary signs (0222-0102000J) | SF | 810 | $25.00 | $30.00 | $36.00 | $25.00 | $20.00 | $35.00 |
| 66 | Construct structural concrete overlay (0559-0302000J) | SY | 3,274 | $32.00 | $57.00 | $103.00 | $79.75 | $75.00 | $80.00 |
| 67 | Detectable guide strips, blue (0759-0531000J) | SF | 40 | $80.00 | $50.00 | $165.00 | $73.50 | $110.00 | $75.00 |
| 68 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $4,000.00 | $10,000 | $15,000 | $21,110 | $1,000.00 | $45,000 |
| 69 | Stone embankment (0330-0126000K) | CY | 3 | $300.00 | $300.00 | $375.00 | $190.00 | $150.00 | $500.00 |
| 70 | Contaminated soil disposal (0294-0200010M) | TON | 12 | $90.00 | $50.00 | $150.00 | $300.00 | $150.00 | $250.00 |
| 71 | General excavation (0330-0105000K) | CY | 20.20 | $80.00 | $200.00 | $150.00 | $130.00 | $120.00 | $250.00 |
| 72 | Contaminated groundwater mobilization (0294-0300000A) | LS | 1 | $18,000 | $500.00 | $10,000 | $5,000.00 | $2,500.00 | $12,000 |
| 73 | Control joint (0585-0300000A) | LF | 109 | $27.52 | $27.52 | $27.52 | $21.56 | $29.82 | $36.70 |
| 74 | Shrubs, #1 container (1040-0153000E) | EACH | 150 | $20.00 | $20.00 | $12.00 | $20.00 | $22.00 | $20.00 |
| 75 | Clearing and grubbing (0320-0100000A) | ACRE | 0.10 | $40,000 | $30,000 | $20,000 | $11,000 | $30,000 | $250,000 |
| 76 | Elastomeric concrete nosing material (0584-0103000C) | CF | 37 | $115.00 | $185.00 | $245.00 | $185.90 | $200.00 | $237.00 |
| 77 | Capping existing concrete structures (0490-0125000E) | EACH | 1 | $3,000.00 | $2,000.00 | $1,500.00 | $1,600.00 | $3,000.00 | $3,500.00 |
| 78 | Flagger station lighting (0223-0168100E) | EACH | 3 | $2,200.00 | $500.00 | $900.00 | $1,600.00 | $1,000.00 | $7,500.00 |
| 79 | Temporary non-reflective tape (0225-0152000F) | LF | 300 | $3.02 | $1.50 | $12.00 | $12.00 | $3.70 | $12.00 |
| 80 | Contaminated groundwater removal (0294-0400000P) | GAL | 317 | $10.00 | $5.00 | $20.00 | $13.00 | $15.00 | $100.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of April 3, 2025. Compiled by Mirage Metrics.