ODOT contract 15596 bid tabulation
North powder/richland/halfway curb ramps. Let by Oregon DOT on April 17, 2025, Region 5. 6 bids received.
- Owner
- Oregon DOT
- Letting
- 17 APR 2025
- Pay items
- 76
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 | Rank 5 | Rank 6 |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Longitudinal pavement markings - paint (0860-0200000F) | LF | 1,978 | $5.00 | $2.50 | $2.25 | $2.00 | $4.00 | $2.00 |
| 2 | Metal handrail, 3 rails (1069-0100000F) | LF | 16 | $550.00 | $350.00 | $450.00 | $375.00 | $700.00 | $300.00 |
| 3 | Wood sign posts (0910-0100000K) | FBM | 54 | $5.00 | $25.00 | $96.00 | $35.00 | $42.00 | $16.00 |
| 4 | Perforated steel square tube slip base sign supports (0930-0114000A) | LB | 1,720 | $22.33 | $18.60 | $6.58 | $20.35 | $20.35 | $17.44 |
| 5 | Inlet protection, type 4 (0280-0114040E) | EACH | 1 | $125.00 | $100.00 | $177.00 | $140.00 | $150.00 | $50.00 |
| 6 | Crosswalk closure supports (0902-0101000E) | EACH | 3 | $1,800.00 | $1,500.00 | $2,260.00 | $1,600.00 | $2,000.00 | $2,000.00 |
| 7 | Concrete inlets, type G-2 (0470-0315000E) | EACH | 36 | $4,500.00 | $2,550.00 | $4,400.00 | $5,200.00 | $3,500.00 | $7,000.00 |
| 8 | Temporary barricades, type III (0224-0105000E) | EACH | 182 | $85.00 | $125.00 | $82.00 | $190.00 | $90.00 | $15.00 |
| 9 | Stripe removal (0225-0154000F) | LF | 1,412 | $1.95 | $3.50 | $2.00 | $3.00 | $9.00 | $0.75 |
| 10 | 16 foot X 48 inch chain link double gates (1050-0208000E) | EACH | 1 | $6,500.00 | $5,700.00 | $5,570.00 | $6,000.00 | $6,000.00 | $3,000.00 |
| 11 | Flaggers (0223-0168000T) | HR | 3,840 | $0.01 | $86.00 | $75.00 | $1.00 | $80.00 | $0.01 |
| 12 | Adjusting inlets (0490-0105000E) | EACH | 16 | $525.00 | $2,100.00 | $1,200.00 | $1,300.00 | $1,000.00 | $500.00 |
| 13 | 18 inch storm sewer pipe, 5 FT depth (0445-035018AF) | LF | 26 | $192.00 | $341.00 | $510.00 | $700.00 | $360.00 | $175.00 |
| 14 | Lead compliance plan (0294-0500000A) | LS | 1 | $5,000.00 | $2,500.00 | $2,500.00 | $2,000.00 | $1,500.00 | $2,000.00 |
| 15 | Contaminated groundwater removal (0294-0400000P) | GAL | 2,000 | $1.00 | $11.05 | $13.00 | $1.75 | $10.00 | $0.50 |
| 16 | 12 inch HDPE pipe, 5 FT depth (0445-055012AF) | LF | 6 | $185.00 | $220.00 | $650.00 | $850.00 | $345.00 | $150.00 |
| 17 | Weed control geotextile (1040-0208000J) | SF | 636 | $3.00 | $2.50 | $1.75 | $2.15 | $4.00 | $1.00 |
| 18 | Remove existing signs (0905-0100000A) | LS | 1 | $24,000 | $10,000 | $5,660.00 | $15,000 | $2,500.00 | $4,000.00 |
| 19 | Minor adjustment of manholes (0490-0120000E) | EACH | 5 | $700.00 | $500.00 | $1,580.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 20 | Refurbishing and reinstalling existing illumination systems (0970-0106000A) | LS | 1 | $20,900 | $20,530 | $15,940 | $75,000 | $15,000 | $17,000 |
| 21 | Concrete driveways (0759-0126000J) | SF | 425 | $17.43 | $16.60 | $22.00 | $16.60 | $26.00 | $20.00 |
| 22 | Pavement bar, type B-HS (0867-0145100J) | SF | 1,693 | $22.00 | $16.50 | $21.00 | $18.85 | $23.00 | $18.85 |
| 23 | Concrete manholes, with inlet (0470-0103000E) | EACH | 2 | $7,500.00 | $4,676.00 | $10,240 | $13,000 | $9,500.00 | $14,000 |
| 24 | Soil conditioner (1040-0107000K) | CY | 1 | $3,500.00 | $200.00 | $1,640.00 | $1,000.00 | $500.00 | $1,000.00 |
| 25 | Contaminated groundwater mobilization (0294-0300000A) | LS | 1 | $2,000.00 | $2,600.00 | $8,830.00 | $2,250.00 | $2,000.00 | $100.00 |
| 26 | Sediment fence (0280-0113000F) | LF | 40 | $42.00 | $5.00 | $39.00 | $5.25 | $22.00 | $12.00 |
| 27 | Special ADA concrete curb (0759-0103000F) | LF | 4,807 | $73.50 | $73.00 | $75.00 | $70.00 | $84.00 | $85.00 |
| 28 | Asphalt pavement sawcutting (0310-0119000F) | LF | 5,927 | $45.00 | $5.00 | $8.00 | $10.00 | $6.00 | $10.00 |
| 29 | Inlet protection, type 11 (0280-0114110E) | EACH | 34 | $115.00 | $100.00 | $148.00 | $175.00 | $90.00 | $50.00 |
| 30 | Temporary barricades, type II (0224-0104000E) | EACH | 100 | $65.00 | $100.00 | $41.00 | $78.00 | $80.00 | $15.00 |
| 31 | Temporary plastic drums (0224-0145000E) | EACH | 118 | $49.00 | $50.00 | $41.00 | $45.00 | $80.00 | $10.00 |
| 32 | Temporary pavement bars (0225-0153200J) | SF | 1,350 | $5.25 | $3.50 | $6.00 | $5.00 | $7.00 | $1.50 |
| 33 | Adjusting boxes (0490-0100000E) | EACH | 26 | $450.00 | $500.00 | $470.00 | $750.00 | $600.00 | $150.00 |
| 34 | Remove and reinstall existing signs (0905-0101000A) | LS | 1 | $35,600 | $1,000.00 | $8,490.00 | $15,000 | $500.00 | $7,000.00 |
| 35 | Rock mulch (1040-0192000K) | CY | 12 | $450.00 | $150.00 | $450.00 | $300.00 | $250.00 | $250.00 |
| 36 | Type CL-4R chain link fence (1050-0135000F) | LF | 13 | $250.00 | $200.00 | $230.00 | $205.00 | $250.00 | $150.00 |
| 37 | Signs, standard sheeting, plywood (0940-0203000J) | SF | 591 | $12.00 | $40.00 | $62.00 | $30.00 | $55.00 | $26.00 |
| 38 | Contaminated soil disposal (0294-0200010M) | TON | 1,042 | $1.00 | $92.50 | $82.00 | $35.00 | $85.00 | $0.01 |
| 39 | Connection to existing structures (0490-0104000E) | EACH | 37 | $1,100.00 | $500.00 | $780.00 | $1,450.00 | $1,500.00 | $100.00 |
| 40 | Topsoil (1040-0101000K) | CY | 1 | $850.00 | $200.00 | $1,640.00 | $1,000.00 | $500.00 | $1,000.00 |
| 41 | Pedestrian channelizing devices (0228-0141600F) | LF | 1,540 | $22.50 | $30.00 | $19.00 | $8.00 | $28.00 | $10.00 |
| 42 | Switching, conduit, and wiring (0970-0105000A) | LF | 57 | $281.54 | $408.86 | $425.61 | $1,315.79 | $403.51 | $438.60 |
| 43 | Removing and rebuilding fence (1050-0240000F) | LF | 43 | $200.00 | $65.00 | $220.00 | $135.00 | $250.00 | $100.00 |
| 44 | Truncated domes on new surfaces (0759-0510000J) | SF | 1,794 | $23.10 | $27.00 | $43.00 | $22.00 | $62.00 | $25.00 |
| 45 | Temporary walks (0228-0167680J) | SF | 30 | $11.50 | $10.00 | $24.00 | $45.00 | $50.00 | $50.00 |
| 46 | 12 inch ductile iron pipe, 5 FT depth (0445-060012AF) | LF | 140 | $185.00 | $276.88 | $400.00 | $450.00 | $385.00 | $170.00 |
| 47 | Pole foundations (0970-0100000A) | EACH | 8 | $150.00 | $3,166.25 | $3,018.75 | $9,375.00 | $2,875.00 | $3,125.00 |
| 48 | Temporary curb ramp, parallel (0228-0167670E) | EACH | 4 | $1,550.00 | $1,200.00 | $1,290.00 | $1,200.00 | $1,500.00 | $2,000.00 |
| 49 | Legend removal (0225-0155100J) | SF | 3 | $262.50 | $3.00 | $280.00 | $250.00 | $500.00 | $100.00 |
| 50 | Portable changeable message signs (0222-0164000E) | EACH | 3 | $7,500.00 | $6,500.00 | $5,290.00 | $7,500.00 | $2,300.00 | $15,000 |
| 51 | Hydrant extensions (1160-0105000E) | EACH | 2 | $2,500.00 | $4,500.00 | $2,820.00 | $6,500.00 | $15,000 | $4,000.00 |
| 52 | Pollution control plan (0290-0100000A) | LS | 1 | $2,200.00 | $1,000.00 | $1,500.00 | $1,000.00 | $1,500.00 | $3,000.00 |
| 53 | Soil sample collection and analytical testing (0294-0700000E) | EACH | 3 | $1,500.00 | $1,650.00 | $1,870.00 | $3,000.00 | $5,000.00 | $2,700.00 |
| 54 | Health and safety plan (0294-0100000A) | LS | 1 | $2,500.00 | $3,500.00 | $2,500.00 | $2,000.00 | $8,000.00 | $3,000.00 |
| 55 | Sign support footings (0920-0100000A) | CY | 3.40 | $2.94 | $6,470.59 | $4,994.12 | $10,294 | $11,471 | $4,705.88 |
| 56 | Removal of surfacings for curb ramp construction (0310-0106101J) | SY | 6,369 | $42.00 | $40.00 | $55.00 | $62.00 | $36.00 | $135.00 |
| 57 | Mainline video inspection (0415-0100000F) | LF | 1,636 | $38.00 | $12.00 | $14.00 | $6.00 | $18.00 | $0.01 |
| 58 | Clearing and grubbing (0320-0100000A) | ACRE | 1 | $4,500.00 | $2,500.00 | $7,580.00 | $25,000 | $10,000 | $2,000.00 |
| 59 | Remove and reinstall pavers (0760-0100000J) | SF | 13 | $125.00 | $25.00 | $167.00 | $60.00 | $100.00 | $200.00 |
| 60 | Sod lawn (1040-0189000J) | SY | 8 | $150.00 | $50.00 | $310.00 | $165.00 | $300.00 | $200.00 |
| 61 | Inlet protection, type 10 (0280-0114100E) | EACH | 2 | $95.00 | $100.00 | $113.00 | $125.00 | $100.00 | $50.00 |
| 62 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $25,000 | $350,000 | $15,720 | $55,000 | $75,000 | $310,000 |
| 63 | 12 inch storm sewer pipe, 5 FT depth (0445-035012AF) | LF | 192 | $170.00 | $220.00 | $390.00 | $650.00 | $360.00 | $150.00 |
| 64 | Aggregate base (0640-0100000M) | TON | 3,077 | $0.01 | $41.07 | $98.00 | $34.50 | $90.00 | $20.00 |
| 65 | Commercial asphalt concrete pavement (0740-0100000M) | TON | 692 | $350.00 | $237.90 | $400.00 | $385.00 | $465.00 | $460.00 |
| 66 | Temporary removable tape (0225-0150000F) | LF | 2,640 | $5.77 | $2.50 | $2.25 | $5.50 | $6.00 | $1.50 |
| 67 | Extra for new curb ramps (0759-0154100E) | EACH | 148 | $997.00 | $1,450.00 | $810.00 | $950.00 | $900.00 | $800.00 |
| 68 | Concrete storm sewer manholes (0470-0101000E) | EACH | 1 | $6,500.00 | $3,450.00 | $7,710.00 | $12,500 | $9,500.00 | $12,000 |
| 69 | Concrete walks (0759-0128000J) | SF | 33,075 | $16.38 | $17.10 | $14.00 | $15.60 | $17.00 | $22.00 |
| 70 | Concrete inlets, type CG-3 (0470-0309000E) | EACH | 1 | $4,500.00 | $3,275.00 | $4,310.00 | $4,500.00 | $4,300.00 | $7,000.00 |
| 71 | Concrete inlets, type CG-2 (0470-0307000E) | EACH | 2 | $5,200.00 | $2,800.00 | $4,590.00 | $5,600.00 | $4,000.00 | $7,000.00 |
| 72 | Segregate and stockpile contaminated soil (0294-0600000A) | LS | 1 | $2,500.00 | $7,200.00 | $37,760 | $50,000 | $60,000 | $500.00 |
| 73 | Inlet protection, type 3 (0280-0114030E) | EACH | 55 | $78.00 | $100.00 | $106.00 | $175.00 | $90.00 | $50.00 |
| 74 | Bar removal (0225-0156000J) | SF | 1,676 | $8.92 | $5.00 | $10.00 | $8.50 | $11.00 | $3.00 |
| 75 | Concrete stairs (0759-0150000K) | CY | 1 | $1,575.00 | $1,500.00 | $3,480.00 | $1,500.00 | $3,000.00 | $4,000.00 |
| 76 | Temporary signs (0222-0102000J) | SF | 2,635 | $13.50 | $35.00 | $8.00 | $26.00 | $16.00 | $12.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of April 17, 2025. Compiled by Mirage Metrics.