ODOT contract 15605 bid tabulation
Portland metro area 2024-2027 ada curb ramps, phase 2. Let by Oregon DOT on June 26, 2025, Region 1. 9 bids received.
- Owner
- Oregon DOT
- Letting
- 26 JUN 2025
- Pay items
- 88
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 | ||
| 7 | ||
| 8 | ||
| 9 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 | Rank 5 | Rank 6 |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Legend removal (0225-0155100J) | SF | 80 | $15.00 | $15.00 | $20.00 | $10.00 | $10.00 | $15.00 |
| 2 | Concrete curbs, curb and gutter (0759-0103000F) | LF | 7,200 | $52.00 | $40.00 | $68.00 | $35.00 | $50.00 | $67.00 |
| 3 | Temporary walks (0228-0167680J) | SF | 550 | $18.00 | $10.00 | $18.00 | $15.00 | $25.00 | $9.75 |
| 4 | Removal of surfacings for curb ramp construction (0310-0106101J) | SY | 9,100 | $23.00 | $34.00 | $55.00 | $5.00 | $67.00 | $34.00 |
| 5 | Aggregate base (0640-0100000M) | TON | 4,000 | $72.00 | $82.00 | $150.00 | $10.00 | $48.00 | $25.00 |
| 6 | Temporary plastic drums (0224-0145000E) | EACH | 562 | $55.00 | $50.00 | $40.00 | $10.00 | $20.00 | $60.00 |
| 7 | Traffic signal modification, US26 @ 047DO conn. MP 4C62.49 (MP 62.39) (hillsboro) (0990-0102000A) | EACH | 1 | $4,400.00 | $5,000.00 | $4,400.00 | $10,000 | $4,860.00 | $6,000.00 |
| 8 | Extra for new curb ramps (0759-0154100E) | EACH | 239 | $644.00 | $1,000.00 | $800.00 | $500.00 | $900.00 | $1,700.00 |
| 9 | Wood sign posts (0910-0100000K) | FBM | 78 | $20.00 | $30.00 | $35.00 | $20.00 | $31.00 | $32.00 |
| 10 | Signs, standard sheeting, sheet aluminum (0940-0202000J) | SF | 3 | $60.00 | $100.00 | $88.00 | $100.00 | $48.00 | $47.00 |
| 11 | Topsoil (1040-0101000K) | CY | 170 | $60.00 | $100.00 | $88.00 | $50.00 | $175.00 | $170.00 |
| 12 | Level 3, 1/2 inch ACP mixture (0744-0302000M) | TON | 1,000 | $210.00 | $250.00 | $315.00 | $300.00 | $210.00 | $315.00 |
| 13 | Traffic signal modification, US26 @ 047CV conn. MP 1C64.34 (MP 64.34) (hillsboro) (0990-0102000A) | EACH | 1 | $8,875.00 | $10,000 | $12,500 | $18,000 | $9,800.00 | $12,000 |
| 14 | Contaminated soil disposal (0294-0200010M) | TON | 185 | $110.00 | $200.00 | $90.00 | $30.00 | $150.00 | $195.00 |
| 15 | Concrete washout facility (0280-0112500E) | EACH | 20 | $1,100.00 | $700.00 | $300.00 | $0.01 | $500.00 | $1,400.00 |
| 16 | Traffic signal modification, I-5 @ 001SG conn. MP 4C293.55 (SW dartmouth ST.) (MP 293.55) (tigard) (0990-0102000A) | EACH | 1 | $6,575.00 | $7,000.00 | $7,000.00 | $14,000 | $7,260.00 | $9,000.00 |
| 17 | Permanent seeding (1030-0108000R) | ACRE | 0.30 | $13,000 | $24,000 | $22,000 | $5,000.00 | $29,000 | $28,000 |
| 18 | Traffic signal modification, OR10 @ SW maple ave. (MP 1.11) (beaverton) (0990-0102000A) | EACH | 1 | $1,400.00 | $1,600.00 | $2,600.00 | $3,000.00 | $1,550.00 | $3,000.00 |
| 19 | Pavement legend, type B-HS: bicycle lane stencil (0867-0131000E) | EACH | 3 | $500.00 | $500.00 | $520.00 | $500.00 | $400.00 | $425.00 |
| 20 | Concrete driveways (0759-0126000J) | SF | 50 | $20.00 | $16.00 | $28.00 | $20.00 | $35.00 | $80.00 |
| 21 | Pedestrian channelizing devices (0228-0141600F) | LF | 2,000 | $30.00 | $25.00 | $18.00 | $10.00 | $20.00 | $36.50 |
| 22 | Remove and reinstall existing signs (0905-0101000A) | LS | 1 | $2,000.00 | $6,000.00 | $8,000.00 | $2,000.00 | $5,000.00 | $7,500.00 |
| 23 | Traffic signal modification, US26 @ 047BN conn. MP 4C67.73) (MP 67.28) (beaverton) (0990-0102000A) | EACH | 1 | $800.00 | $1,000.00 | $2,100.00 | $2,000.00 | $880.00 | $2,500.00 |
| 24 | Traffic signal modification, US26 @ 047BF conn. MP 1C65.68 (MP 65.68) (beaverton) (0990-0102000A) | EACH | 1 | $3,300.00 | $3,600.00 | $4,500.00 | $8,000.00 | $3,650.00 | $5,000.00 |
| 25 | Traffic signal modification, OR99W @ SW gaarde ST. (SW mcdonald ST) (MP 10.36) (tualatin) (0990-0102000A) | EACH | 1 | $14,200 | $16,000 | $21,222 | $30,000 | $15,700 | $18,000 |
| 26 | Sign support footings (0920-0100000A) | CY | 1.50 | $3,333.33 | $10,000 | $13,333 | $6,000.00 | $9,333.33 | $10,000 |
| 27 | Traffic signal modification, OR99W @ SW royalty parkway, (MP 11.19) (tigard) (0990-0102000A) | EACH | 1 | $3,400.00 | $4,000.00 | $7,000.00 | $8,000.00 | $3,760.00 | $6,000.00 |
| 28 | Traffic signal modification, OR217 @ 144BW conn. MP 3C0.91 (144BU conn. MP 1C0.92) (MP 0.88) (beaverton) (0990-0102000A) | EACH | 1 | $3,450.00 | $3,600.00 | $400.00 | $8,000.00 | $3,810.00 | $6,000.00 |
| 29 | Traffic signal modification, OR10 @ SW 110TH ave. (MP 1.14) (beaverton) (0990-0102000A) | EACH | 1 | $5,800.00 | $6,000.00 | $8,200.00 | $12,000 | $6,410.00 | $9,000.00 |
| 30 | Concrete walks (0759-0128000J) | SF | 51,000 | $9.50 | $14.00 | $12.00 | $10.00 | $16.00 | $13.00 |
| 31 | Bar removal (0225-0156000J) | SF | 50 | $15.00 | $20.00 | $25.00 | $10.00 | $10.00 | $17.00 |
| 32 | Traffic signal modification, US26 @ 047BI conn. MP 4C65.89 (MP 65.89) (beaverton) (0990-0102000A) | EACH | 1 | $3,375.00 | $3,600.00 | $4,400.00 | $8,000.00 | $3,730.00 | $5,000.00 |
| 33 | Traffic signal modification, OR99W @ SW langer farms pkwy. (MP 14.68) (sherwood) (0990-0102000A) | EACH | 1 | $800.00 | $1,000.00 | $2,222.00 | $2,000.00 | $880.00 | $3,000.00 |
| 34 | Crosswalk closure supports (0902-0101000E) | EACH | 8 | $1,300.00 | $1,500.00 | $1,600.00 | $2,500.00 | $1,500.00 | $1,450.00 |
| 35 | Cold plane pavement removal, 4 inches deep (0620-0123000J) | SY | 700 | $19.00 | $20.00 | $60.00 | $12.00 | $20.00 | $55.00 |
| 36 | Adjusting inlets (0490-0105000E) | EACH | 35 | $1,400.00 | $1,000.00 | $1,200.00 | $200.00 | $1,100.00 | $1,750.00 |
| 37 | Sediment barrier, type 3 (0280-0115030F) | LF | 25 | $10.00 | $10.00 | $45.00 | $50.00 | $25.00 | $14.00 |
| 38 | Traffic signal modification, OR99W @ SW 124TH ave. (MP 12.66) (tualatin) (0990-0102000A) | EACH | 1 | $15,550 | $17,000 | $22,222 | $32,000 | $17,200 | $20,000 |
| 39 | Traffic signal modification, OR10 @ SW 109TH ave. (MP 1.21) (beaverton) (0990-0102000A) | EACH | 1 | $1,300.00 | $1,400.00 | $2,500.00 | $2,000.00 | $1,440.00 | $3,000.00 |
| 40 | Minor adjustment of manholes (0490-0120000E) | EACH | 4 | $1,400.00 | $1,200.00 | $1,500.00 | $2,500.00 | $1,400.00 | $2,000.00 |
| 41 | Soil sample collection and analytical testing (0294-0700000E) | EACH | 5 | $3,000.00 | $3,000.00 | $2,000.00 | $500.00 | $2,000.00 | $2,700.00 |
| 42 | Traffic signal modification, US26 @ 047DA conn. MP 6C63.66 (MP 64.23) (hillsboro) (0990-0102000A) | EACH | 1 | $2,225.00 | $2,500.00 | $2,500.00 | $5,000.00 | $2,460.00 | $4,000.00 |
| 43 | Traffic signal modification, OR127 @ NE wagon DR. (cornelius pass front. RD.) (MP 7.75) (hillsboro) (0990-0102000A) | EACH | 1 | $1,500.00 | $2,000.00 | $2,000.00 | $3,000.00 | $1,660.00 | $3,000.00 |
| 44 | Concrete islands (0759-0122000J) | SF | 3,000 | $22.00 | $20.00 | $25.00 | $10.00 | $27.50 | $30.00 |
| 45 | Clearing and grubbing (0320-0100000A) | ACRE | 1 | $35,000 | $10,000 | $25,000 | $5,000.00 | $28,900 | $30,000 |
| 46 | Temporary barricades, type III (0224-0105000E) | EACH | 99 | $185.00 | $160.00 | $70.00 | $25.00 | $100.00 | $200.00 |
| 47 | Bark mulch (1040-0190000K) | CY | 60 | $70.00 | $100.00 | $80.00 | $50.00 | $200.00 | $190.00 |
| 48 | Traffic signal modification, US26 @ 047BJ conn. MP 5C66.50 (MP 65.98) (beaverton) (0990-0102000A) | EACH | 1 | $4,175.00 | $5,000.00 | $4,800.00 | $9,000.00 | $4,610.00 | $6,000.00 |
| 49 | Traffic signal modification, I-5 @ SW 72ND ave. (MP 290.61) (tualatin) (0990-0102000A) | EACH | 1 | $1,250.00 | $1,400.00 | $2,500.00 | $2,000.00 | $1,380.00 | $3,000.00 |
| 50 | Pavement bar, type B-HS (0867-0145100J) | SF | 780 | $22.00 | $30.00 | $25.00 | $20.00 | $25.00 | $24.00 |
| 51 | Traffic control supervisor (0223-0169000E) | EACH | 520 | $750.00 | $800.00 | $300.00 | $0.01 | $450.00 | $150.00 |
| 52 | Sequential arrow signs (0222-0162000E) | EACH | 10 | $3,300.00 | $3,400.00 | $3,000.00 | $200.00 | $2,000.00 | $1,000.00 |
| 53 | Traffic signal modification, I-5 @ 001RR conn. MP 3C290.50 (MP 290.42) (tualatin) (0990-0102000A) | EACH | 1 | $1,750.00 | $2,000.00 | $2,000.00 | $4,000.00 | $1,930.00 | $3,500.00 |
| 54 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $10,000 | $240,000 | $50,000 | $1,884,000 | $14,500 | $220,000 |
| 55 | Weed control geotextile (1040-0208000J) | SF | 1,500 | $0.65 | $1.00 | $0.50 | $0.25 | $2.00 | $2.00 |
| 56 | Traffic signal modification, OR217 @ SW barnes RD. (144AH conn. PM 8C0.12) (MP 0.23) (beaverton) (0990-0102000A) | EACH | 1 | $8,360.00 | $9,000.00 | $15,000 | $18,000 | $9,230.00 | $11,000 |
| 57 | Temporary signs (0222-0102000J) | SF | 4,370 | $21.00 | $13.00 | $12.00 | $15.00 | $12.00 | $22.00 |
| 58 | Temporary barricades, type II (0224-0104000E) | EACH | 100 | $65.00 | $50.00 | $75.00 | $25.00 | $40.00 | $60.00 |
| 59 | Health and safety plan (0294-0100000A) | LS | 1 | $2,000.00 | $1,000.00 | $500.00 | $3,000.00 | $2,000.00 | $3,000.00 |
| 60 | Segregate and stockpile contaminated soil (0294-0600000A) | LS | 1 | $15,000 | $20,000 | $38,000 | $1,000.00 | $5,000.00 | $10,000 |
| 61 | Asphalt pavement sawcutting, 10 inches deep (0310-0119100F) | LF | 10,000 | $3.50 | $6.00 | $6.00 | $3.00 | $4.00 | $5.50 |
| 62 | Cold plane pavement removal, 2 inches deep (0620-0120000J) | SY | 90 | $36.00 | $20.00 | $70.00 | $10.00 | $20.00 | $73.00 |
| 63 | Temporary curb ramp, parallel (0228-0167670E) | EACH | 96 | $500.00 | $900.00 | $1,100.00 | $0.01 | $500.00 | $1,700.00 |
| 64 | Traffic signal modification, US26 @ 047BT conn. MP 4C69.34) (MP 68.50) (beaverton) (0990-0102000A) | EACH | 1 | $2,050.00 | $2,500.00 | $2,500.00 | $4,000.00 | $2,260.00 | $4,000.00 |
| 65 | Flagger station lighting (0223-0168100E) | EACH | 4 | $3,000.00 | $2,000.00 | $800.00 | $5,000.00 | $400.00 | $12,500 |
| 66 | Concrete curbs, standard curb (0759-0110000F) | LF | 3,400 | $44.00 | $40.00 | $65.00 | $35.00 | $50.00 | $63.00 |
| 67 | Inlet protection, type 3 (0280-0114030E) | EACH | 74 | $119.00 | $100.00 | $75.00 | $30.00 | $80.00 | $125.00 |
| 68 | Inlet protection, type 11 (0280-0114110E) | EACH | 16 | $90.00 | $100.00 | $72.00 | $30.00 | $80.00 | $125.00 |
| 69 | Temporary pavement bars (0225-0153200J) | SF | 500 | $3.50 | $10.00 | $10.00 | $2.00 | $10.00 | $3.50 |
| 70 | Pollution control plan (0290-0100000A) | LS | 1 | $2,000.00 | $1,000.00 | $500.00 | $3,000.00 | $1,000.00 | $3,000.00 |
| 71 | Concrete sawcutting, 4 inches deep (0310-0210000F) | LF | 3,100 | $3.50 | $6.00 | $6.00 | $4.00 | $4.00 | $5.00 |
| 72 | Adjusting boxes (0490-0100000E) | EACH | 4 | $600.00 | $400.00 | $680.00 | $400.00 | $250.00 | $300.00 |
| 73 | Extra for pavement repair (0749-0109000J) | SF | 19,000 | $14.24 | $4.00 | $5.00 | $0.01 | $5.00 | $4.00 |
| 74 | Traffic signal modification, US26 @ NW bronson RD (MP 65.86) (beaverton) (0990-0102000A) | EACH | 1 | $3,200.00 | $4,000.00 | $38,000 | $7,000.00 | $3,530.00 | $5,000.00 |
| 75 | Perforated steel square tube anchor sign supports (0930-0117000A) | LB | 375 | $21.33 | $21.33 | $21.60 | $32.00 | $20.67 | $33.33 |
| 76 | Perforated steel square tube slip base sign supports (0930-0114000A) | LB | 205 | $14.63 | $19.51 | $20.49 | $24.39 | $19.51 | $36.59 |
| 77 | Traffic signal modification, US26 @ NW 158TH ave. (MP 65.80) (beaverton) (0990-0102000A) | EACH | 1 | $2,850.00 | $3,200.00 | $2,800.00 | $6,000.00 | $3,150.00 | $5,000.00 |
| 78 | Removing and rebuilding fence (1050-0240000F) | LF | 40 | $80.00 | $200.00 | $225.00 | $125.00 | $200.00 | $175.00 |
| 79 | Flaggers (0223-0168000T) | HR | 1,800 | $70.00 | $80.00 | $70.00 | $0.01 | $110.00 | $80.00 |
| 80 | Temporary removable tape (0225-0150000F) | LF | 500 | $3.50 | $10.00 | $6.00 | $3.00 | $5.00 | $8.50 |
| 81 | Truncated domes on new surfaces (0759-0510000J) | SF | 2,900 | $30.00 | $40.00 | $50.00 | $30.00 | $50.00 | $30.00 |
| 82 | Traffic signal modification, OR8 @ SW 17TH ave. (MP 14.15) (hillsboro) (0990-0102000A) | EACH | 1 | $3,850.00 | $4,000.00 | $7,000.00 | $8,000.00 | $4,250.00 | $6,500.00 |
| 83 | Traffic signal modification, I-5 @ 001RK conn. MP 1C289.54 (MP 289.43) (tualatin) (0990-0102000A) | EACH | 1 | $4,500.00 | $4,500.00 | $6,000.00 | $10,000 | $4,970.00 | $7,000.00 |
| 84 | Traffic signal modification, OR217 @ 144BX conn. PM 2C7.16 (MP 7.16) (tigard) (0990-0102000A) | EACH | 1 | $12,860 | $14,000 | $18,000 | $27,000 | $14,200 | $17,000 |
| 85 | Traffic signal modification, US26 @ 047DU conn. PM 8C61.08 (MP61.09) (hillsboro) (0990-0102000A) | EACH | 1 | $3,850.00 | $4,000.00 | $4,400.00 | $8,000.00 | $4,250.00 | $6,000.00 |
| 86 | Thermoplastic, extruded, surface, non-profiled (0865-0116610F) | LF | 50 | $35.00 | $40.00 | $45.00 | $50.00 | $37.00 | $36.00 |
| 87 | Plain concrete pavement repair (0754-0100000J) | SY | 10 | $800.00 | $300.00 | $500.00 | $400.00 | $400.00 | $445.00 |
| 88 | Inlet protection, type 10 (0280-0114100E) | EACH | 16 | $80.00 | $100.00 | $78.00 | $30.00 | $80.00 | $125.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of June 26, 2025. Compiled by Mirage Metrics.