ODOT contract 15607 bid tabulation
Or99w/or18 curb ramps (mcminnville). Let by Oregon DOT on December 18, 2025, Region 2. 6 bids received.
- Owner
- Oregon DOT
- Letting
- 18 DEC 2025
- Pay items
- 128
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 | Rank 5 | Rank 6 |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Traffic signal modification, OR99W-adams/NE 2ND ST (0990-0102000A) | EACH | 1 | $16,000 | $15,350 | $20,000 | $25,000 | $20,370 | $25,000 |
| 2 | Pavement legend, type B-HS: "xing" (0867-0153100E) | EACH | 2 | $1,300.00 | $1,250.00 | $1,200.00 | $1,200.00 | $1,388.00 | $1,200.00 |
| 3 | Concrete stairs (0759-0150000K) | CY | 0.15 | $12,000 | $3,900.00 | $2,600.00 | $40,000 | $2,910.00 | $6,000.00 |
| 4 | Aggregate base (0640-0100000M) | TON | 4,528 | $55.00 | $25.00 | $72.00 | $68.00 | $75.00 | $10.00 |
| 5 | Temporary pavement legends (0225-0153100E) | EACH | 10 | $130.00 | $125.00 | $120.00 | $150.00 | $130.00 | $50.00 |
| 6 | Pavement legend, type B-HS: arrows (0867-0103100E) | EACH | 16 | $570.00 | $550.00 | $525.00 | $500.00 | $600.00 | $525.00 |
| 7 | 3 inch PVC pipe, 5 FT depth (0445-052003AF) | LF | 20 | $108.00 | $50.00 | $75.00 | $100.00 | $120.00 | $100.00 |
| 8 | Truncated domes on new surfaces, curb ramp (0765-0100000J) | SF | 3,154 | $43.00 | $38.00 | $41.00 | $33.00 | $46.50 | $45.00 |
| 9 | Soil sample collection and analytical testing (0294-0700000E) | EACH | 1 | $2,700.00 | $1,500.00 | $6,500.00 | $5,000.00 | $1,500.00 | $5,000.00 |
| 10 | Temporary barricades, type III (0224-0105000E) | EACH | 44 | $162.00 | $81.00 | $150.00 | $70.00 | $80.00 | $50.00 |
| 11 | Weed control geotextile (1040-0208000J) | SF | 6,814 | $0.45 | $0.40 | $0.40 | $0.50 | $0.60 | $0.25 |
| 12 | Concrete curbs, modified (0759-0102000F) | LF | 24 | $65.00 | $53.00 | $32.05 | $120.00 | $35.00 | $35.00 |
| 13 | Metal handrail, two rails (1069-0100000F) | LF | 30 | $215.00 | $265.00 | $260.00 | $300.00 | $294.00 | $250.00 |
| 14 | Traffic signal modification, OR99W / SW linfield AV (0990-0102000A) | EACH | 1 | $92,000 | $88,500 | $95,000 | $77,000 | $85,620 | $110,000 |
| 15 | Flashing beacon installation, OR99W-adams (0990-0106000A) | EACH | 1 | $40,000 | $38,000 | $45,000 | $30,000 | $31,480 | $45,000 |
| 16 | Traffic signal modification, OR99W / SW fellows ST (0990-0102000A) | EACH | 1 | $115,000 | $110,350 | $120,000 | $100,000 | $115,290 | $130,000 |
| 17 | Lawn seeding (1030-0138000J) | SY | 700 | $2.70 | $2.50 | $2.50 | $20.00 | $3.50 | $3.00 |
| 18 | 6 inch ductile iron pipe, 5 FT depth (0445-060006AF) | LF | 7 | $550.00 | $120.00 | $251.00 | $400.00 | $920.00 | $300.00 |
| 19 | Concrete driveways (0759-0126000J) | SF | 482 | $23.00 | $21.00 | $14.47 | $21.00 | $16.30 | $18.00 |
| 20 | Level 3, 1/2 inch ACP mixture (0744-0302000M) | TON | 213 | $380.00 | $280.00 | $200.00 | $320.00 | $324.00 | $335.00 |
| 21 | Concrete islands (0759-0122000J) | SF | 1,601 | $20.00 | $23.50 | $18.34 | $23.00 | $21.00 | $20.00 |
| 22 | Pole foundations (0970-0100000A) | EACH | 8 | $1,875.00 | $1,847.50 | $2,500.00 | $1,000.00 | $1,367.50 | $3,125.00 |
| 23 | Thermoplastic, extruded, surface, non-profiled (0865-0116610F) | LF | 51,028 | $1.70 | $1.60 | $1.55 | $2.00 | $1.80 | $1.55 |
| 24 | Remove existing signs (0905-0100000A) | LS | 1 | $815.00 | $1,040.00 | $2,250.00 | $1,000.00 | $1,160.00 | $2,000.00 |
| 25 | Rock mulch (1040-0196000M) | TON | 16 | $97.00 | $93.00 | $90.00 | $175.00 | $125.00 | $120.00 |
| 26 | Perforated steel square tube slip base sign supports (0930-0114000A) | LB | 767 | $9.58 | $7.33 | $9.78 | $6.52 | $8.14 | $10.43 |
| 27 | Bark mulch (1040-0190000K) | CY | 79 | $59.50 | $57.00 | $55.00 | $150.00 | $140.00 | $135.00 |
| 28 | Extra for manholes over existing sewers (0490-0123000E) | EACH | 10 | $8,860.00 | $1,350.00 | $3,500.00 | $1,300.00 | $2,000.00 | $1,000.00 |
| 29 | Temporary removable tape (0225-0150000F) | LF | 5,000 | $4.65 | $6.00 | $4.40 | $6.00 | $3.00 | $1.00 |
| 30 | Temporary walks (0228-0167680J) | SF | 2,500 | $4.15 | $10.00 | $12.00 | $13.00 | $10.00 | $12.00 |
| 31 | 2-1/2 inch - 0 aggregate base (0641-0121000M) | TON | 2 | $275.00 | $135.00 | $232.00 | $200.00 | $110.00 | $200.00 |
| 32 | Clearing and grubbing (0320-0100000A) | ACRE | 1 | $6,250.00 | $5,000.00 | $65,000 | $10,000 | $40,000 | $1,000.00 |
| 33 | Temporary flashing beacons, or 99W at approx. MP 38.63 (0227-0160001A) | LS | 1 | $15,500 | $14,200 | $35,000 | $10,000 | $11,600 | $25,000 |
| 34 | Flashing beacon installation, OR99W-adams/15TH (0990-0106000A) | EACH | 1 | $23,000 | $21,850 | $25,000 | $45,000 | $51,411 | $30,000 |
| 35 | Milepost marker posts (0840-0106000E) | EACH | 1 | $380.00 | $260.00 | $350.00 | $500.00 | $290.00 | $400.00 |
| 36 | Pavement legend, type A: yield line triangle (0867-0168000E) | EACH | 13 | $92.00 | $89.00 | $85.00 | $90.00 | $98.00 | $85.00 |
| 37 | Traffic signal modification, SW baker ST/SW booth bend RD (0990-0102000A) | EACH | 1 | $130,000 | $123,850 | $130,000 | $100,000 | $115,520 | $140,000 |
| 38 | Flashing beacon installation, OR99W-baker/15TH (0990-0106000A) | EACH | 1 | $30,000 | $28,100 | $30,000 | $20,000 | $23,980 | $35,000 |
| 39 | Traffic signal modification, OR99W / NE mcdonald LN (0990-0102000A) | EACH | 1 | $70,500 | $67,650 | $72,000 | $65,000 | $72,430 | $80,000 |
| 40 | Switching, conduit, and wiring (0970-0105000A) | LF | 715 | $67.13 | $65.50 | $73.14 | $34.97 | $34.32 | $90.91 |
| 41 | Retaining wall, cast-in-place concrete semi-gravity cantilever (0596-C003000A) | SF | 417 | $119.90 | $136.69 | $191.85 | $165.47 | $117.51 | $299.76 |
| 42 | Minor adjustment of manholes (0490-0120000E) | EACH | 10 | $1,550.00 | $2,500.00 | $1,200.00 | $900.00 | $390.00 | $1,000.00 |
| 43 | Adjusting boxes (0490-0100000E) | EACH | 48 | $320.00 | $225.00 | $300.00 | $800.00 | $245.00 | $100.00 |
| 44 | Mainline video inspection (0415-0100000F) | LF | 617 | $7.50 | $5.00 | $7.00 | $18.00 | $8.00 | $20.00 |
| 45 | Temporary signs (0222-0102000J) | SF | 4,315 | $18.50 | $10.00 | $17.00 | $8.00 | $10.00 | $10.00 |
| 46 | Temporary plastic drums (0224-0145000E) | EACH | 556 | $11.00 | $14.25 | $48.00 | $20.00 | $40.00 | $10.00 |
| 47 | Legend removal (0225-0155100J) | SF | 768 | $7.00 | $6.75 | $6.50 | $7.00 | $7.50 | $3.00 |
| 48 | Segregate and stockpile contaminated soil (0294-0600000A) | LS | 1 | $2,200.00 | $6,500.00 | $25,000 | $28,000 | $2,500.00 | $2,000.00 |
| 49 | Concrete inlets, type CG-2 (0470-0307000E) | EACH | 1 | $2,200.00 | $3,900.00 | $5,250.00 | $4,000.00 | $5,300.00 | $7,000.00 |
| 50 | Inlet protection, type 7 (0280-0114070E) | EACH | 180 | $56.00 | $100.00 | $85.00 | $45.00 | $60.00 | $50.00 |
| 51 | Pedestrian channelizing devices (0228-0141600F) | LF | 2,000 | $5.25 | $24.50 | $3.00 | $25.00 | $20.00 | $20.00 |
| 52 | Concrete manholes, shallow (0470-0105000E) | EACH | 1 | $5,500.00 | $9,500.00 | $5,800.00 | $5,500.00 | $12,540 | $11,000 |
| 53 | Concrete storm sewer manholes (0470-0101000E) | EACH | 11 | $8,300.00 | $9,700.00 | $5,925.00 | $5,200.00 | $9,000.00 | $12,000 |
| 54 | Temporary flashing beacons, or 99W at approx. MP 36.23 (0227-0160001A) | LS | 1 | $15,500 | $14,200 | $35,000 | $10,000 | $11,600 | $25,000 |
| 55 | Portable changeable message signs (0222-0164000E) | EACH | 4 | $2,300.00 | $18,000 | $19,900 | $3,000.00 | $5,500.00 | $15,000 |
| 56 | Health and safety plan (0294-0100000A) | LS | 1 | $3,315.00 | $500.00 | $2,250.00 | $500.00 | $1,000.00 | $3,000.00 |
| 57 | 12 inch storm sewer pipe, 10 FT depth (0445-035012BF) | LF | 143 | $208.00 | $200.00 | $185.00 | $300.00 | $220.00 | $370.00 |
| 58 | Pollution control plan (0290-0100000A) | LS | 1 | $552.00 | $500.00 | $2,250.00 | $500.00 | $1,000.00 | $2,000.00 |
| 59 | Remove and reinstall existing signs (0905-0101000A) | LS | 1 | $13,500 | $8,000.00 | $12,500 | $8,000.00 | $8,900.00 | $15,000 |
| 60 | Commercial asphalt concrete pavement (0740-0100000M) | TON | 1,278 | $360.00 | $330.00 | $200.00 | $260.00 | $358.00 | $400.00 |
| 61 | 12 inch ductile iron pipe, 5 FT depth (0445-060012AF) | LF | 575 | $142.00 | $180.00 | $180.00 | $245.00 | $280.00 | $275.00 |
| 62 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $22,000 | $90,000 | $45,000 | $20,000 | $290,000 | $900,000 |
| 63 | Asphalt pavement sawcutting, 8 inches deep (0310-0119100F) | LF | 6,745 | $2.25 | $2.75 | $2.00 | $4.00 | $5.50 | $10.00 |
| 64 | Cold plane pavement removal, 4 inches deep (0620-0123000J) | SY | 971 | $60.00 | $73.00 | $26.00 | $85.00 | $81.00 | $50.00 |
| 65 | Temporary barricades, type II (0224-0104000E) | EACH | 100 | $65.00 | $53.00 | $60.00 | $60.00 | $70.00 | $50.00 |
| 66 | Flashing beacon installation, OR99W-adams/8TH (0990-0106000A) | EACH | 1 | $23,000 | $21,850 | $25,000 | $26,000 | $31,110 | $30,000 |
| 67 | Concrete manholes, with inlet (0470-0103000E) | EACH | 1 | $6,500.00 | $9,600.00 | $5,820.00 | $6,000.00 | $13,000 | $14,000 |
| 68 | Trench resurfacing (0495-0100000J) | SY | 110 | $250.00 | $240.00 | $110.00 | $69.00 | $170.00 | $200.00 |
| 69 | Connection to existing structures (0490-0104000E) | EACH | 12 | $1,850.00 | $1,500.00 | $1,100.00 | $1,500.00 | $1,040.00 | $400.00 |
| 70 | Green bicycle lane, preformed thermoplastic film (0868-0100000J) | SF | 1,430 | $19.75 | $19.00 | $18.22 | $20.00 | $21.00 | $18.22 |
| 71 | Concrete curbs, curb and gutter (0759-0103000F) | LF | 6,750 | $45.00 | $65.00 | $37.05 | $50.00 | $42.00 | $40.00 |
| 72 | Capping existing concrete structures (0490-0125000E) | EACH | 7 | $485.00 | $1,500.00 | $1,660.00 | $1,000.00 | $720.00 | $1,000.00 |
| 73 | Asphalt pavement sawcutting, 16 inches deep (0310-0119100F) | LF | 3,817 | $6.50 | $4.25 | $16.00 | $4.00 | $12.00 | $15.00 |
| 74 | Temporary flashing beacons, or 99W (adams ST) at approx. MP 38.09 (0227-0160001A) | LS | 1 | $15,500 | $14,200 | $35,000 | $10,000 | $11,600 | $25,000 |
| 75 | Flaggers (0223-0168000T) | HR | 1,300 | $84.00 | $82.00 | $75.00 | $88.00 | $82.00 | $90.00 |
| 76 | Concrete inlets, type CG-3 (0470-0309000E) | EACH | 4 | $2,200.00 | $3,900.00 | $5,620.00 | $4,000.00 | $5,090.00 | $7,000.00 |
| 77 | CL-6 chain link fence (1050-0135000F) | LF | 78 | $65.00 | $62.50 | $100.00 | $88.00 | $69.00 | $75.00 |
| 78 | Type "A" preformed compression joint seal (0585-0208100A) | LF | 52 | $62.50 | $86.54 | $86.54 | $76.92 | $123.08 | $192.31 |
| 79 | Traffic signal modification, OR99W / SW keck DR (0990-0102000A) | EACH | 1 | $114,000 | $109,280 | $120,000 | $88,000 | $101,810 | $130,000 |
| 80 | Pavement legend, type B-HS: shared lane markings (0867-0174000E) | EACH | 2 | $485.00 | $470.00 | $450.00 | $500.00 | $520.00 | $450.00 |
| 81 | Removal of surfacings for curb ramp construction (0310-0106101J) | SY | 12,687 | $27.00 | $25.00 | $34.50 | $28.00 | $45.00 | $5.00 |
| 82 | Temporary pavement bars (0225-0153200J) | SF | 10,035 | $3.50 | $3.40 | $3.25 | $4.00 | $3.50 | $1.25 |
| 83 | Extra for hand dug holes (1999-9Z90000E) | EACH | 10 | $1,285.00 | $520.00 | $660.00 | $900.00 | $1,185.00 | $400.00 |
| 84 | Emulsified asphalt in fog coat (0705-0101000M) | TON | 1.10 | $2,200.00 | $2,000.00 | $3,000.00 | $3,000.00 | $2,000.00 | $2,500.00 |
| 85 | Sequential arrow signs (0222-0162000E) | EACH | 5 | $850.00 | $5,000.00 | $6,000.00 | $1,300.00 | $1,700.00 | $500.00 |
| 86 | Pavement legend, type B-HS: bicycle lane stencil (0867-0131000E) | EACH | 40 | $485.00 | $470.00 | $450.00 | $450.00 | $520.00 | $450.00 |
| 87 | Concrete wheel stop (1999-9Z90000E) | EACH | 1 | $540.00 | $260.00 | $1,200.00 | $1,200.00 | $560.00 | $500.00 |
| 88 | Stripe removal (0225-0154000F) | LF | 9,086 | $1.25 | $1.00 | $1.15 | $3.00 | $1.20 | $0.50 |
| 89 | Bar removal (0225-0156000J) | SF | 6,638 | $6.25 | $6.00 | $5.75 | $8.00 | $6.60 | $2.00 |
| 90 | Pavement legend, type B-HS: "school" (0867-0111100E) | EACH | 2 | $1,750.00 | $1,650.00 | $1,585.00 | $1,200.00 | $1,830.00 | $1,585.00 |
| 91 | Inlet protection, type 3 (0280-0114030E) | EACH | 176 | $183.00 | $85.00 | $105.00 | $60.00 | $75.00 | $50.00 |
| 92 | Removal of inlets (0310-0104000E) | EACH | 16 | $1,185.00 | $320.00 | $350.00 | $800.00 | $1,500.00 | $600.00 |
| 93 | Adjusting inlets (0490-0105000E) | EACH | 80 | $400.00 | $750.00 | $1,000.00 | $750.00 | $550.00 | $500.00 |
| 94 | Flagger station lighting (0223-0168100E) | EACH | 4 | $165.00 | $6,750.00 | $5,000.00 | $2,000.00 | $22.00 | $3,000.00 |
| 95 | Sediment barrier, type 2 (0280-0115020E) | EACH | 30 | $130.00 | $5.25 | $80.00 | $65.00 | $77.00 | $20.00 |
| 96 | Temporary striping (0225-0153000F) | LF | 7,537 | $0.70 | $0.70 | $0.65 | $2.00 | $0.70 | $0.25 |
| 97 | Contaminated soil disposal (0294-0200010M) | TON | 530 | $120.00 | $82.00 | $100.00 | $70.00 | $50.00 | $20.00 |
| 98 | Temporary curb ramp, parallel (0228-0167670E) | EACH | 65 | $250.00 | $600.00 | $600.00 | $1,100.00 | $1,200.00 | $200.00 |
| 99 | Crosswalk closure supports (0902-0101000E) | EACH | 4 | $1,350.00 | $1,770.00 | $1,500.00 | $2,500.00 | $1,965.00 | $2,000.00 |
| 100 | Flashing beacon installation, OR99W-baker (0990-0106000A) | EACH | 1 | $23,000 | $21,850 | $25,000 | $18,000 | $19,250 | $30,000 |
| 101 | Flashing beacon installation, OR99W-baker/8TH (0990-0106000A) | EACH | 1 | $23,000 | $21,850 | $25,000 | $17,000 | $19,250 | $30,000 |
| 102 | Curb marking, paint (0869-0200000F) | LF | 194 | $8.65 | $8.25 | $8.00 | $15.00 | $9.00 | $10.00 |
| 103 | Concrete curbs, curb and gutter, 5 foot gutter pan (0759-0105000F) | LF | 331 | $80.00 | $96.00 | $55.17 | $75.00 | $63.00 | $65.00 |
| 104 | 8 inch ductile iron pipe, 5 FT depth (0445-060008AF) | LF | 42 | $183.00 | $150.00 | $175.00 | $230.00 | $360.00 | $300.00 |
| 105 | Asphalt pavement sawcutting, 4 inches deep (0310-0119100F) | LF | 5,319 | $1.10 | $1.75 | $1.00 | $3.00 | $9.00 | $8.00 |
| 106 | Traffic signal modification, OR99W / SW booth bend RD (0990-0102000A) | EACH | 1 | $80,000 | $77,000 | $80,000 | $65,000 | $77,050 | $100,000 |
| 107 | Removal of pipes (0310-0100000F) | LF | 337 | $85.00 | $63.00 | $25.00 | $65.00 | $35.00 | $30.00 |
| 108 | Topsoil (1040-0101000K) | CY | 116 | $53.00 | $51.00 | $49.00 | $150.00 | $140.00 | $135.00 |
| 109 | Perforated steel square tube anchor sign supports (0930-0117000A) | LB | 2,595 | $5.78 | $11.75 | $5.59 | $9.63 | $13.07 | $5.78 |
| 110 | Pavement bar, type B-HS (0867-0145100J) | SF | 8,068 | $15.50 | $14.85 | $14.25 | $15.00 | $16.50 | $14.25 |
| 111 | Concrete walks (0759-0128000J) | SF | 55,468 | $9.60 | $14.75 | $8.47 | $12.00 | $9.60 | $11.00 |
| 112 | Inlet protection, type 10 (0280-0114100E) | EACH | 4 | $80.00 | $90.00 | $85.00 | $115.00 | $80.00 | $75.00 |
| 113 | Concrete curbs, standard curb (0759-0110000F) | LF | 2,515 | $41.00 | $45.00 | $30.74 | $44.00 | $35.00 | $35.00 |
| 114 | Concrete sawcutting, 4 inches deep (0310-0119200F) | LF | 2,806 | $5.50 | $2.75 | $3.70 | $4.00 | $12.00 | $12.00 |
| 115 | Lighting poles and arms (0970-0200000A) | EACH | 8 | $3,437.50 | $3,318.75 | $3,750.00 | $10,000 | $12,606 | $4,375.00 |
| 116 | Temporary flashing beacons, or 99W at approx. MP 36.54 (0227-0160001A) | LS | 1 | $15,500 | $14,200 | $35,000 | $10,000 | $11,600 | $25,000 |
| 117 | 12 inch storm sewer pipe, 5 FT depth (0445-035012AF) | LF | 302 | $126.00 | $100.00 | $128.00 | $188.00 | $175.00 | $150.00 |
| 118 | Concrete inlets, type G-2 (0470-0315000E) | EACH | 36 | $2,100.00 | $3,500.00 | $3,800.00 | $3,800.00 | $4,100.00 | $7,000.00 |
| 119 | Plastic sheeting (0280-0101000J) | SY | 100 | $6.85 | $5.25 | $4.25 | $7.00 | $10.00 | $10.00 |
| 120 | Flashing beacon installation, OR99W-adams/3RD (0990-0106000A) | EACH | 1 | $23,000 | $21,850 | $25,000 | $18,000 | $19,311 | $30,000 |
| 121 | Sign support footings (0920-0100000A) | CY | 7.20 | $3,888.89 | $6,388.89 | $4,513.89 | $6,250.00 | $7,069.44 | $4,166.67 |
| 122 | Signs, standard sheeting, sheet aluminum (0940-0202000J) | SF | 190 | $27.00 | $33.00 | $25.00 | $40.00 | $37.00 | $25.00 |
| 123 | Luminaires, lamps, and ballasts (0970-0104000A) | EACH | 9 | $517.78 | $497.22 | $944.44 | $555.56 | $475.56 | $1,111.11 |
| 124 | Traffic signal modification, OR99W / NE baker creek-evan ST (0990-0102000A) | EACH | 1 | $119,000 | $114,500 | $120,000 | $100,000 | $120,880 | $125,000 |
| 125 | Mainline video with laser profile inspection (0415-0401000F) | LF | 445 | $13.00 | $13.50 | $12.00 | $30.00 | $13.00 | $25.00 |
| 126 | Traffic control supervisor (0223-0169000E) | EACH | 400 | $118.00 | $300.00 | $620.00 | $700.00 | $350.00 | $0.01 |
| 127 | Cold plane pavement removal, 2 inches deep (0620-0120000J) | SY | 39 | $75.00 | $170.00 | $50.50 | $95.00 | $200.00 | $75.00 |
| 128 | Asphalt slope paving (0749-0116000J) | SF | 3,071 | $6.50 | $14.50 | $6.00 | $15.00 | $6.80 | $10.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of December 18, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.