ODOT contract 15610 bid tabulation
Or99w/or153 curb ramps (amity). Let by Oregon DOT on September 11, 2025, Region 2. 5 bids received.
- Owner
- Oregon DOT
- Letting
- 11 SEP 2025
- Pay items
- 83
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 | ||
| 5 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 | Rank 5 |
|---|---|---|---|---|---|---|---|---|
| 1 | Temporary barricades, type III (0224-0105000E) | EACH | 4 | $100.00 | $76.00 | $190.00 | $235.00 | $210.00 |
| 2 | Concrete sawcutting, 4 inches deep (0310-0119200F) | LF | 900 | $2.50 | $4.75 | $2.20 | $8.00 | $6.25 |
| 3 | Minor adjustment of manholes (0490-0120000E) | EACH | 1 | $330.00 | $1,260.00 | $3,300.00 | $1,850.00 | $1,457.00 |
| 4 | Adjusting boxes (0490-0100000E) | EACH | 13 | $130.00 | $790.00 | $550.00 | $1,250.00 | $668.00 |
| 5 | Contaminated groundwater removal (0294-0400000P) | GAL | 2,000 | $1.75 | $2.00 | $5.00 | $15.50 | $2.60 |
| 6 | Longitudinal pavement markings - paint (0860-0200000F) | LF | 420 | $4.00 | $3.50 | $5.00 | $3.90 | $3.85 |
| 7 | Removal of surfacings for curb ramp construction (0310-0106101J) | SY | 1,675 | $19.00 | $63.00 | $120.00 | $65.00 | $134.00 |
| 8 | Remove and reinstall existing signs (0905-0101000A) | LS | 1 | $3,415.00 | $2,880.00 | $3,170.00 | $10,758 | $10,737 |
| 9 | Sign support footings (0920-0100000A) | CY | 0.90 | $11,222 | $9,472.22 | $10,417 | $5,555.56 | $8,133.33 |
| 10 | Remove and reinstall benches (1999-9Z90000E) | EACH | 1 | $1,050.00 | $580.00 | $730.00 | $550.00 | $1,296.00 |
| 11 | Removal of fences (0310-0112000A) | LF | 64 | $43.75 | $34.06 | $17.19 | $38.28 | $131.72 |
| 12 | Temporary barricades, type II (0224-0104000E) | EACH | 40 | $35.00 | $32.00 | $71.50 | $102.00 | $78.00 |
| 13 | Bar removal (0225-0156000J) | SF | 243 | $17.50 | $18.00 | $5.00 | $16.50 | $28.00 |
| 14 | Asphalt pavement sawcutting, 8 inches deep (0310-0119100F) | LF | 740 | $3.50 | $5.00 | $2.00 | $4.50 | $6.25 |
| 15 | Contaminated soil disposal (0294-0200010M) | TON | 218 | $150.00 | $109.00 | $165.00 | $467.50 | $173.00 |
| 16 | Segregate and stockpile contaminated soil (0294-0600000A) | LS | 1 | $10,000 | $11,180 | $8,250.00 | $61,340 | $31,754 |
| 17 | Historical marker installation (1999-9Z90000E) | EACH | 1 | $1,000.00 | $770.00 | $1,430.00 | $3,000.00 | $7,167.00 |
| 18 | Remove existing signs (0905-0100000A) | LS | 1 | $142.00 | $120.00 | $135.00 | $1,764.00 | $1,212.00 |
| 19 | Concrete inlets, type CG-3 (0470-0309000E) | EACH | 1 | $5,000.00 | $4,420.00 | $3,500.00 | $8,500.00 | $5,798.00 |
| 20 | Weed control (1030-0101000R) | ACRE | 0.10 | $7,400.00 | $7,510.00 | $6,875.00 | $6,875.00 | $83,070 |
| 21 | Temporary plastic drums (0224-0145000E) | EACH | 24 | $60.00 | $38.00 | $55.00 | $56.00 | $60.00 |
| 22 | Rock mulch (1040-0196000M) | TON | 31 | $125.00 | $126.00 | $115.00 | $115.50 | $111.00 |
| 23 | Adjusting inlets (0490-0105000E) | EACH | 3 | $2,000.00 | $510.00 | $1,100.00 | $2,450.00 | $1,903.00 |
| 24 | Remove and reinstall bus shelters (1999-9Z90000E) | EACH | 1 | $1,600.00 | $2,650.00 | $730.00 | $1,800.00 | $1,884.00 |
| 25 | Aggregate base (0640-0100000M) | TON | 770 | $70.00 | $77.00 | $25.00 | $115.00 | $177.50 |
| 26 | Removal of pipes (0310-0100000F) | LF | 145 | $32.00 | $79.00 | $30.00 | $100.00 | $85.00 |
| 27 | Pedestrian channelizing devices (0228-0141600F) | LF | 1,000 | $15.00 | $13.00 | $6.00 | $45.00 | $32.50 |
| 28 | Inlet protection, type 10 (0280-0114100E) | EACH | 16 | $102.00 | $91.00 | $110.00 | $215.00 | $255.00 |
| 29 | Cold plane pavement removal, 2 inches deep (0620-0120000J) | SY | 445 | $25.00 | $58.00 | $20.00 | $25.00 | $63.00 |
| 30 | 8 inch culvert pipe, 5 FT depth (0445-010008AF) | LF | 31 | $175.00 | $260.00 | $330.00 | $325.00 | $434.00 |
| 31 | Wood sign posts (0910-0100000K) | FBM | 72 | $47.00 | $40.00 | $44.00 | $25.50 | $15.00 |
| 32 | Temporary walks (0228-0167680J) | SF | 1,750 | $10.00 | $6.00 | $5.50 | $32.00 | $5.50 |
| 33 | Asphalt pavement sawcutting, 10 inches deep (0310-0119100F) | LF | 1,140 | $4.00 | $5.00 | $2.00 | $5.00 | $7.00 |
| 34 | Level 3, 1/2 inch ACP mixture (0744-0302000M) | TON | 275 | $300.00 | $430.00 | $302.50 | $213.00 | $633.00 |
| 35 | Pavement legend, type B-HS: bicycle lane stencil (0867-0131000E) | EACH | 2 | $533.00 | $450.00 | $400.00 | $490.00 | $1,157.00 |
| 36 | Multiple mailbox supports (1070-0101000E) | EACH | 5 | $890.00 | $1,500.00 | $825.00 | $1,342.00 | $1,252.00 |
| 37 | Pole foundations (0970-0100000A) | EACH | 3 | $7,104.00 | $2,780.00 | $6,666.67 | $2,850.00 | $2,321.33 |
| 38 | Bollards (0815-0100000E) | EACH | 4 | $1,975.00 | $1,480.00 | $660.00 | $1,600.00 | $1,817.00 |
| 39 | Contaminated groundwater mobilization (0294-0300000A) | LS | 1 | $2,500.00 | $2,770.00 | $11,000 | $7,541.10 | $7,590.00 |
| 40 | Irrigation system (1120-0100000A) | LS | 1 | $35,000 | $7,490.00 | $72,600 | $69,960 | $9,300.00 |
| 41 | Pavement legend, type AB: disabled parking (0867-0173500E) | EACH | 1 | $1,050.00 | $900.00 | $400.00 | $1,000.00 | $898.00 |
| 42 | Concrete curbs, standard curb (0759-0110000F) | LF | 329 | $59.00 | $46.00 | $38.50 | $45.00 | $50.00 |
| 43 | 12 inch storm sewer pipe, 5 FT depth (0445-035012AF) | LF | 43 | $190.00 | $270.00 | $330.00 | $323.00 | $330.00 |
| 44 | 15 inch storm sewer pipe, 5 FT depth (0445-035015AF) | LF | 5 | $275.00 | $720.00 | $350.00 | $644.00 | $1,260.00 |
| 45 | Concrete driveways (0759-0126000J) | SF | 99 | $34.00 | $16.00 | $44.00 | $18.00 | $38.00 |
| 46 | Flaggers (0223-0168000T) | HR | 1,250 | $90.00 | $66.00 | $82.50 | $76.00 | $90.00 |
| 47 | Removal of inlets (0310-0104000E) | EACH | 7 | $445.00 | $1,190.00 | $1,100.00 | $1,950.00 | $1,528.00 |
| 48 | Signs, standard sheeting, sheet aluminum (0940-0202000J) | SF | 81.30 | $45.00 | $39.00 | $43.00 | $43.00 | $49.00 |
| 49 | Switching, conduit, and wiring (0970-0105000A) | LF | 500 | $58.00 | $40.74 | $56.00 | $46.30 | $42.50 |
| 50 | Mailbox concrete collars (1070-0102000E) | EACH | 6 | $175.00 | $350.00 | $165.00 | $442.00 | $828.00 |
| 51 | Concrete bus shelter pads (0759-0156000E) | EACH | 1 | $3,550.00 | $2,940.00 | $2,750.00 | $1,850.00 | $3,552.00 |
| 52 | Concrete inlets, type G-2 (0470-0315000E) | EACH | 11 | $5,300.00 | $4,160.00 | $4,700.00 | $8,750.00 | $5,975.00 |
| 53 | Pipe tees, 18 inch (0445-0650000E) | EACH | 1 | $1,496.00 | $2,160.00 | $1,500.00 | $2,408.00 | $4,460.00 |
| 54 | Mainline video inspection (0415-0100000F) | LF | 162 | $20.00 | $23.00 | $29.50 | $15.00 | $80.00 |
| 55 | Temporary signs (0222-0102000J) | SF | 1,020 | $10.00 | $10.00 | $27.50 | $43.00 | $12.00 |
| 56 | Temporary curb ramp, parallel (0228-0167670E) | EACH | 13 | $500.00 | $250.00 | $1,000.00 | $4,483.00 | $4,320.00 |
| 57 | Check dam, type 6 (0280-0106060E) | EACH | 10 | $87.00 | $450.00 | $165.00 | $200.00 | $204.00 |
| 58 | Pollution control plan (0290-0100000A) | LS | 1 | $5,000.00 | $1,530.00 | $2,750.00 | $3,989.00 | $1,314.00 |
| 59 | Truncated domes on new surfaces (0759-0510000J) | SF | 705 | $38.00 | $41.00 | $60.50 | $42.00 | $43.00 |
| 60 | Concrete walks (0759-0128000J) | SF | 12,090 | $23.00 | $12.00 | $18.70 | $10.00 | $19.00 |
| 61 | 10 inch storm sewer pipe, 5 FT depth (0445-035010AF) | LF | 53 | $190.00 | $370.00 | $330.00 | $368.00 | $493.00 |
| 62 | Traffic control supervisor (0223-0169000E) | EACH | 60 | $600.00 | $320.00 | $900.00 | $110.00 | $147.00 |
| 63 | Stripe removal (0225-0154000F) | LF | 34 | $17.50 | $18.00 | $5.00 | $16.50 | $28.00 |
| 64 | Concrete washout facility (0280-0112500E) | EACH | 3 | $148.00 | $970.00 | $130.00 | $2,750.00 | $1,501.00 |
| 65 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $25,000 | $13,860 | $16,500 | $22,850 | $10,696 |
| 66 | 8 inch storm sewer pipe, 5 FT depth (0445-035008AF) | LF | 15 | $225.00 | $370.00 | $330.00 | $230.00 | $909.00 |
| 67 | Single mailbox supports (1070-0100000E) | EACH | 1 | $600.00 | $750.00 | $550.00 | $700.00 | $566.00 |
| 68 | Soil sample collection and analytical testing (0294-0700000E) | EACH | 1 | $2,500.00 | $3,000.00 | $1,650.00 | $7,836.40 | $3,550.00 |
| 69 | Clearing and grubbing (0320-0100000A) | ACRE | 0.10 | $25,000 | $69,100 | $110,000 | $120,000 | $202,720 |
| 70 | Perforated steel square tube slip base sign supports (0930-0114000A) | LB | 964.70 | $7.77 | $6.53 | $7.18 | $8.86 | $6.45 |
| 71 | Crosswalk closure supports (0902-0101000E) | EACH | 3 | $1,750.00 | $1,475.00 | $1,620.00 | $1,300.00 | $1,662.00 |
| 72 | 18 inch storm sewer pipe, 5 FT depth (0445-035018AF) | LF | 15 | $213.00 | $420.00 | $350.00 | $417.00 | $704.00 |
| 73 | Lawn seeding (1030-0138000J) | SY | 300 | $9.00 | $10.00 | $8.80 | $8.80 | $14.75 |
| 74 | Legend removal (0225-0155100J) | SF | 5 | $110.00 | $120.00 | $5.00 | $110.00 | $28.00 |
| 75 | Bark mulch (1040-0190000K) | CY | 4 | $213.00 | $220.00 | $200.00 | $200.00 | $280.00 |
| 76 | Cold plane pavement removal, 4 inches deep (0620-0123000J) | SY | 222 | $35.00 | $121.00 | $20.00 | $50.00 | $126.00 |
| 77 | Concrete curbs, curb and gutter (0759-0103000F) | LF | 982 | $60.00 | $49.00 | $38.50 | $45.00 | $65.50 |
| 78 | Ditch excavation (0330-0101000K) | CY | 10 | $135.00 | $330.00 | $110.00 | $185.00 | $134.00 |
| 79 | Portable changeable message signs (0222-0164000E) | EACH | 4 | $8,000.00 | $6,320.00 | $10,000 | $10,890 | $12,615 |
| 80 | Pavement bar, type B-HS (0867-0145100J) | SF | 760 | $26.50 | $22.50 | $20.00 | $25.00 | $27.10 |
| 81 | Remove and reinstall litter receptacles (1999-9Z90000E) | EACH | 1 | $525.00 | $690.00 | $730.00 | $350.00 | $1,296.00 |
| 82 | Inlet protection, type 3 (0280-0114030E) | EACH | 21 | $48.00 | $84.00 | $215.00 | $135.00 | $273.00 |
| 83 | Health and safety plan (0294-0100000A) | LS | 1 | $15,000 | $2,300.00 | $8,250.00 | $3,989.00 | $1,314.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of September 11, 2025. Compiled by Mirage Metrics.