ODOT contract 15611 bid tabulation
Cornelius pass hwy & us30 its improvements. Let by Oregon DOT on September 11, 2025, Region 1. 5 bids received.
- Owner
- Oregon DOT
- Letting
- 11 SEP 2025
- Pay items
- 68
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 | ||
| 5 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 | Rank 5 |
|---|---|---|---|---|---|---|---|---|
| 1 | Delineators, type 4 alternate 2 (0840-0104200E) | EACH | 100 | $55.00 | $73.00 | $55.00 | $55.00 | $100.00 |
| 2 | Check dam, type 6 (0280-0106060E) | EACH | 3 | $150.00 | $220.00 | $200.00 | $300.00 | $1,500.00 |
| 3 | Flaggers (0223-0168000T) | HR | 600 | $75.00 | $73.50 | $70.00 | $88.00 | $100.00 |
| 4 | Delineators, type 5 (0840-0105000E) | EACH | 50 | $22.00 | $29.00 | $12.00 | $65.00 | $50.00 |
| 5 | Electrical systems installation, US30 EB (0985-0100000A) | LS | 1 | $20,000 | $31,500 | $20,000 | $21,000 | $25,000 |
| 6 | Flagger station lighting (0223-0168100E) | EACH | 4 | $1,500.00 | $2,640.00 | $2,180.00 | $1,900.00 | $3,000.00 |
| 7 | Remove and reinstall existing signs (0905-0101000A) | LS | 1 | $1,600.00 | $1,015.00 | $1,500.00 | $1,200.00 | $1,000.00 |
| 8 | Traffic signal modification, cornelius pass RD/wagon DR (0990-0102000A) | EACH | 1 | $25,000 | $18,930 | $21,000 | $30,000 | $35,000 |
| 9 | Permanent seeding (1030-0108000R) | ACRE | 0.35 | $11,000 | $10,125 | $9,000.00 | $20,000 | $20,000 |
| 10 | Inlet protection, type 4 (0280-0114040E) | EACH | 4 | $100.00 | $220.00 | $150.00 | $175.00 | $300.00 |
| 11 | Sign support footings (0920-0100000A) | CY | 2.70 | $7,407.41 | $5,000.00 | $11,111 | $11,852 | $9,259.26 |
| 12 | Repair temporary impact attenuator, truck mounted (0226-0141400E) | EACH | 1 | $1.00 | $1.00 | $1,000.00 | $5,500.00 | $1.00 |
| 13 | Aggregate base (0640-0100000M) | TON | 28 | $225.00 | $125.00 | $100.00 | $140.00 | $350.00 |
| 14 | Concrete curbs, standard curb (0759-0110000F) | LF | 150 | $55.00 | $110.00 | $45.00 | $75.00 | $50.00 |
| 15 | Flashing beacon installation, cornelius pass RD/skyline BLVD (0990-0106000A) | EACH | 1 | $175,000 | $138,820 | $150,000 | $165,000 | $200,000 |
| 16 | Guardrail terminals, downstream anchor terminal (0810-0132200E) | EACH | 1 | $2,000.00 | $3,125.00 | $2,000.00 | $2,500.00 | $5,000.00 |
| 17 | Temporary plastic drums (0224-0145000E) | EACH | 80 | $55.00 | $66.00 | $50.00 | $65.00 | $75.00 |
| 18 | Repair temporary impact attenuator, narrow site system (0226-0141300E) | EACH | 1 | $2,000.00 | $725.00 | $1,750.00 | $3,000.00 | $1.00 |
| 19 | Signs, standard sheeting, plywood (0940-0203000J) | SF | 40 | $42.00 | $47.50 | $35.00 | $64.00 | $40.00 |
| 20 | Sediment barrier, type 9 (0280-0115090F) | LF | 300 | $6.00 | $6.25 | $6.00 | $2.00 | $25.00 |
| 21 | General excavation (0330-0105000K) | CY | 35 | $100.00 | $180.00 | $100.00 | $125.00 | $400.00 |
| 22 | Sequential arrow signs (0222-0162000E) | EACH | 2 | $1,500.00 | $3,000.00 | $3,250.00 | $1,300.00 | $3,000.00 |
| 23 | Traffic signal modification, cornelius pass RD/west union RD (0990-0102000A) | EACH | 1 | $27,500 | $22,650 | $23,000 | $30,000 | $35,000 |
| 24 | Midwest guardrail system, type 2A (0810-0146100F) | LF | 75 | $43.00 | $125.00 | $43.00 | $78.00 | $50.00 |
| 25 | Remove existing signs (0905-0100000A) | LS | 1 | $2,000.00 | $2,350.00 | $3,000.00 | $900.00 | $1,000.00 |
| 26 | Traffic signal modification, cornelius pass RD/old cornelius pass RD (0990-0102000A) | EACH | 1 | $4,500.00 | $3,250.00 | $4,000.00 | $5,000.00 | $5,000.00 |
| 27 | Compost erosion blanket (0280-0105100J) | SY | 1,700 | $2.25 | $6.00 | $5.50 | $7.00 | $10.00 |
| 28 | Inlet protection, type 10 (0280-0114100E) | EACH | 1 | $120.00 | $302.50 | $150.00 | $350.00 | $300.00 |
| 29 | Lead compliance plan (0294-0500000A) | LS | 1 | $500.00 | $1,000.00 | $3,000.00 | $600.00 | $500.00 |
| 30 | Luminaires, lamps, and ballasts (0970-0104000A) | EACH | 1 | $135,000 | $116,000 | $130,000 | $145,000 | $175,000 |
| 31 | Cold plane pavement removal, 2 inches deep (0620-0120000J) | SY | 97 | $50.00 | $115.00 | $135.00 | $95.00 | $50.00 |
| 32 | Electrical systems installation, US30 WB (0985-0100000A) | LS | 1 | $90,000 | $94,350 | $75,000 | $88,000 | $100,000 |
| 33 | Traffic signal modification, cornelius pass RD/rock creek BLVD (0990-0102000A) | EACH | 1 | $15,000 | $9,925.00 | $12,000 | $14,000 | $20,000 |
| 34 | Temporary impact attenuator, truck mounted (0226-0138000E) | EACH | 2 | $5,500.00 | $7,500.00 | $4,500.00 | $8,000.00 | $5,000.00 |
| 35 | Bpa safety watcher (0223-0169500T) | HR | 200 | $73.50 | $300.00 | $121.00 | $70.00 | $150.00 |
| 36 | Perforated steel square tube anchor sign supports (0930-0117000A) | LB | 1,050 | $9.52 | $9.64 | $7.14 | $8.57 | $6.67 |
| 37 | 48 inch diameter sign support drilled shaft foundation (0921-0301000F) | LF | 50 | $1,300.00 | $900.00 | $1,600.00 | $1,500.00 | $1,500.00 |
| 38 | Level 3, 1/2 inch ACP mixture (0744-0302000M) | TON | 47 | $325.00 | $431.00 | $400.00 | $275.00 | $350.00 |
| 39 | Sediment barrier, type 3 (0280-0115030F) | LF | 400 | $6.25 | $6.25 | $6.00 | $2.00 | $50.00 |
| 40 | Delineators, type 1 (0840-0100000E) | EACH | 300 | $80.00 | $105.00 | $80.00 | $60.00 | $100.00 |
| 41 | Monotube cantilever sign structures, STR. no. 24414 (0930-0104000A) | LB | 8,000 | $8.25 | $6.04 | $6.49 | $9.38 | $7.50 |
| 42 | Telecommunications, material (0987-0100000A) | LS | 1 | $4,000.00 | $3,850.00 | $3,500.00 | $5,000.00 | $5,000.00 |
| 43 | Temporary impact attenuator, narrow site system (0226-0134000E) | EACH | 1 | $4,000.00 | $7,425.00 | $5,000.00 | $7,250.00 | $5,000.00 |
| 44 | Traffic control supervisor (0223-0169000E) | EACH | 30 | $1,250.00 | $400.00 | $800.00 | $155.00 | $1,000.00 |
| 45 | Vertical sign mounts on existing structures (0930-0109000A) | LB | 500 | $24.00 | $16.18 | $50.00 | $24.00 | $40.00 |
| 46 | Contaminated soil disposal (0294-0200010M) | TON | 11.50 | $225.00 | $300.00 | $140.00 | $224.00 | $1,000.00 |
| 47 | Electrical systems installation, OR127 (0985-0100000A) | LS | 1 | $75,000 | $81,600 | $60,000 | $65,000 | $80,000 |
| 48 | Perforated steel square tube slip base sign supports (0930-0114000A) | LB | 250 | $48.00 | $43.20 | $39.60 | $48.00 | $60.00 |
| 49 | Pollution control plan (0290-0100000A) | LS | 1 | $500.00 | $1,000.00 | $3,000.00 | $888.00 | $500.00 |
| 50 | Straw bale (0280-0119000E) | EACH | 3 | $100.00 | $100.00 | $130.00 | $125.00 | $250.00 |
| 51 | Temporary barricades, type II (0224-0104000E) | EACH | 16 | $60.00 | $73.00 | $55.00 | $122.00 | $50.00 |
| 52 | Temporary signs (0222-0102000J) | SF | 750 | $22.00 | $29.00 | $22.00 | $13.00 | $25.00 |
| 53 | Temporary barrier (0226-0126100F) | LF | 200 | $35.00 | $47.25 | $27.00 | $128.00 | $50.00 |
| 54 | Temporary barricades, type III (0224-0105000E) | EACH | 6 | $150.00 | $244.00 | $185.00 | $135.00 | $250.00 |
| 55 | Thermoplastic, extruded, surface, profiled (0865-0116600F) | LF | 150 | $16.00 | $21.00 | $15.50 | $22.00 | $20.00 |
| 56 | Telecommunications, splicing and testing (0987-0120000A) | LS | 1 | $2,500.00 | $7,000.00 | $2,000.00 | $3,000.00 | $5,000.00 |
| 57 | Portable changeable message signs (0222-0164000E) | EACH | 4 | $2,500.00 | $5,000.00 | $6,500.00 | $2,500.00 | $6,000.00 |
| 58 | Removal of electrical systems (0950-0101000A) | LS | 1 | $5,000.00 | $7,500.00 | $4,000.00 | $3,500.00 | $10,000 |
| 59 | Telecommunications, installation (0987-0110000A) | LS | 1 | $3,500.00 | $24,200 | $3,000.00 | $4,000.00 | $5,000.00 |
| 60 | Traffic signal modification, cornelius pass RD/jacobson ST (0990-0102000A) | EACH | 1 | $17,500 | $12,325 | $15,000 | $16,000 | $25,000 |
| 61 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $5,000.00 | $3,500.00 | $10,000 | $6,500.00 | $5,000.00 |
| 62 | Clearing and grubbing (0320-0100000A) | ACRE | 0.20 | $50,000 | $17,500 | $175,000 | $175,000 | $1,000.00 |
| 63 | Subgrade geotextile (0350-0105000J) | SY | 60 | $2.00 | $12.00 | $15.00 | $15.00 | $30.00 |
| 64 | Monotube cantilever sign structures, STR. no. 24415 (0930-0104000A) | LB | 8,000 | $8.25 | $6.04 | $6.49 | $9.38 | $7.50 |
| 65 | Signs, standard sheeting, sheet aluminum (0940-0202000J) | SF | 400 | $35.00 | $40.50 | $30.00 | $40.00 | $40.00 |
| 66 | Guardrail terminals, non-flared (0810-0129000E) | EACH | 1 | $4,000.00 | $7,190.00 | $4,000.00 | $4,650.00 | $5,000.00 |
| 67 | Inlet protection, type 3 (0280-0114030E) | EACH | 3 | $150.00 | $192.50 | $150.00 | $125.00 | $300.00 |
| 68 | Pedestrian channelizing devices (0228-0141600F) | LF | 500 | $6.00 | $30.00 | $18.00 | $8.00 | $50.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of September 11, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.