ODOT contract 15613 bid tabulation
Or6: roadside barrier upgrades. Let by Oregon DOT on September 18, 2025, Region 2. 5 bids received.
- Owner
- Oregon DOT
- Letting
- 18 SEP 2025
- Pay items
- 76
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 | ||
| 5 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 | Rank 5 |
|---|---|---|---|---|---|---|---|---|
| 1 | Temporary impact attenuator, truck mounted (0226-0138000E) | EACH | 1 | $5,000.00 | $6,000.00 | $35,000 | $20,000 | $15,000 |
| 2 | Extra for 8 foot posts (0810-0133000E) | EACH | 3,886 | $40.00 | $50.00 | $40.00 | $65.00 | $65.00 |
| 3 | General structural concrete, class 3300 (0540-0301000A) | CY | 65 | $953.85 | $1,144.62 | $846.15 | $1,230.77 | $738.46 |
| 4 | Sign support footings (0920-0100000A) | CY | 2.60 | $5,769.23 | $8,349.23 | $12,708 | $4,807.69 | $6,923.08 |
| 5 | Temporary pavement bars (0225-0153200J) | SF | 200 | $8.00 | $9.60 | $8.00 | $10.00 | $8.00 |
| 6 | Aggregate shoulders (0640-0101000M) | TON | 965 | $50.00 | $79.55 | $235.00 | $65.00 | $330.00 |
| 7 | Metal beam rails (0812-0104000E) | EACH | 300 | $117.00 | $189.00 | $117.00 | $200.00 | $475.00 |
| 8 | Perforated steel square tube slip base sign supports (0930-0114000A) | LB | 1,400 | $7.14 | $4.83 | $10.81 | $4.46 | $2.86 |
| 9 | Temporary impact attenuator, narrow site system (0226-0134000E) | EACH | 2 | $3,950.00 | $4,740.00 | $3,950.00 | $4,250.00 | $3,950.00 |
| 10 | Bridge removal work (0501-0100000A) | SF | 23 | $652.17 | $782.61 | $326.09 | $869.57 | $173.91 |
| 11 | Removal of surfacings (0310-0103000J) | SY | 4,288 | $28.00 | $27.50 | $15.00 | $6.00 | $77.00 |
| 12 | Guardrail anchors, type 1 modified (0810-0120000E) | EACH | 158 | $1,265.22 | $910.00 | $1,265.22 | $900.00 | $1,075.00 |
| 13 | 32 inch vertical concrete parapet, modified (0587-0118000A) | LF | 50 | $205.20 | $246.24 | $700.00 | $1,100.00 | $132.00 |
| 14 | Removal of guardrail (0310-0113000A) | LF | 66,200 | $3.02 | $3.90 | $2.87 | $3.78 | $7.67 |
| 15 | Temporary striping (0225-0153000F) | LF | 7,000 | $0.55 | $0.66 | $0.55 | $0.60 | $0.55 |
| 16 | Aggregate base (0640-0100000M) | TON | 2,111 | $74.00 | $80.00 | $145.00 | $50.00 | $250.00 |
| 17 | Temporary plastic drums (0224-0145000E) | EACH | 30 | $70.00 | $60.00 | $75.00 | $75.00 | $60.00 |
| 18 | Asphalt pavement sawcutting, 6 inches deep (0310-0119100F) | LF | 15,700 | $2.40 | $2.40 | $5.00 | $3.00 | $16.00 |
| 19 | HI-build paint, sprayed, surface (0866-0117000F) | LF | 5,500 | $0.90 | $1.08 | $0.90 | $1.00 | $0.90 |
| 20 | Level 3, 1/2 inch ACP mixture (0744-0302000M) | TON | 1,585 | $190.00 | $318.00 | $300.00 | $265.00 | $240.00 |
| 21 | Pollution control plan (0290-0100000A) | LS | 1 | $3,000.00 | $3,000.00 | $2,500.00 | $500.00 | $2,500.00 |
| 22 | Extra for hand dug guardrail post holes (0810-0145000E) | EACH | 100 | $100.00 | $320.00 | $100.00 | $100.00 | $150.00 |
| 23 | Lead compliance plan (0294-0500000A) | LS | 1 | $3,000.00 | $1,980.00 | $2,500.00 | $500.00 | $4,500.00 |
| 24 | Midwest guardrail system, type 2A (0810-0146100F) | LF | 54,625 | $26.13 | $27.00 | $26.13 | $25.00 | $33.00 |
| 25 | Repair temporary impact attenuator, sand module (0226-0141500E) | EACH | 24 | $100.00 | $120.00 | $100.00 | $115.00 | $100.00 |
| 26 | Temporary barrier (0226-0126100F) | LF | 1,176 | $25.00 | $28.75 | $25.00 | $20.00 | $24.00 |
| 27 | Stripe removal (0225-0154000F) | LF | 7,100 | $0.70 | $0.84 | $0.70 | $0.75 | $0.70 |
| 28 | Temporary barricades, type III (0224-0105000E) | EACH | 6 | $353.00 | $210.00 | $250.00 | $150.00 | $270.00 |
| 29 | Portable changeable message signs (0222-0164000E) | EACH | 2 | $11,000 | $1,800.00 | $10,000 | $11,000 | $15,000 |
| 30 | Contaminated soil disposal (0294-0200010M) | TON | 35 | $120.00 | $180.00 | $2,500.00 | $200.00 | $500.00 |
| 31 | Guardrail height conversion, type 2A (0810-0147000E) | EACH | 172 | $807.46 | $720.00 | $807.46 | $200.00 | $1,000.00 |
| 32 | Repair temporary impact attenuator, narrow site system (0226-0141300E) | EACH | 2 | $1,000.00 | $1,200.00 | $1,000.00 | $500.00 | $1,000.00 |
| 33 | Bridge identification markers (0842-0401000E) | EACH | 15 | $100.00 | $60.00 | $250.00 | $350.00 | $155.00 |
| 34 | Adjusting guardrail (0812-0101000F) | LF | 72,150 | $3.21 | $3.88 | $3.21 | $5.00 | $5.00 |
| 35 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $10,000 | $18,550 | $205,000 | $1,675,000 | $7,000.00 |
| 36 | Guardrail blocks (0812-0108000E) | EACH | 600 | $20.76 | $57.00 | $20.76 | $10.00 | $75.00 |
| 37 | Guardrail posts (0810-0144000E) | EACH | 600 | $76.06 | $187.00 | $76.06 | $55.00 | $190.00 |
| 38 | Temporary impact attenuator, sand barrel system (0226-0133000E) | EACH | 4 | $3,950.00 | $4,740.00 | $3,950.00 | $4,250.00 | $3,950.00 |
| 39 | Reinforcement, grade 60 (0530-0104000A) | LB | 3,248 | $3.08 | $3.69 | $3.08 | $4.62 | $3.69 |
| 40 | Guardrail end pieces, type B (0810-0122000E) | EACH | 92 | $153.49 | $85.00 | $153.49 | $125.00 | $90.00 |
| 41 | Guardrail terminals, non-flared. test level 3 (0810-0129000E) | EACH | 347 | $2,907.38 | $2,910.00 | $2,907.38 | $2,800.00 | $2,850.00 |
| 42 | Midwest guardrail system, type 3 (0810-0146100F) | LF | 1,075 | $45.13 | $74.00 | $45.13 | $70.00 | $70.00 |
| 43 | Guardrail transition (0810-0126000E) | EACH | 96 | $2,825.83 | $4,715.00 | $2,751.75 | $3,000.00 | $3,200.00 |
| 44 | Temporary barricades, type II (0224-0104000E) | EACH | 12 | $150.00 | $78.00 | $75.00 | $60.00 | $90.00 |
| 45 | Portable traffic signal (0227-0158100A) | LS | 1 | $60,000 | $57,540 | $30,000 | $15,000 | $70,000 |
| 46 | Clearing and grubbing (0320-0100000A) | ACRE | 0.25 | $80,000 | $54,560 | $20,000 | $100,000 | $20,000 |
| 47 | Structure excavation (0510-0101000A) | CY | 109 | $123.85 | $148.62 | $211.01 | $137.61 | $137.61 |
| 48 | Reinforcement, grade 60 (0530-0104000A) | LB | 10,530 | $2.14 | $2.56 | $1.42 | $1.66 | $2.42 |
| 49 | Repair temporary impact attenuator, truck mounted (0226-0141400E) | EACH | 2 | $500.00 | $100.00 | $10,000 | $1.00 | $1.00 |
| 50 | PG 64-22 asphalt in 1/2 inch ACP (0745-0620000M) | TON | 80 | $1.00 | $1.20 | $925.00 | $1.20 | $1.00 |
| 51 | Flagger station lighting (0223-0168100E) | EACH | 2 | $6,000.00 | $4,440.00 | $5,500.00 | $1,500.00 | $25,000 |
| 52 | Structure excavation (0510-0101000A) | CY | 58 | $172.41 | $206.90 | $206.90 | $137.93 | $241.38 |
| 53 | Extra for asphalt approaches (0749-0100000E) | EACH | 161 | $10.00 | $780.00 | $2,250.00 | $450.00 | $1,150.00 |
| 54 | Concrete curbs, standard curb (0759-0110000F) | LF | 87 | $62.00 | $79.25 | $110.00 | $137.65 | $35.00 |
| 55 | Reflective barrier panels (0226-0141100E) | EACH | 244 | $30.00 | $36.00 | $30.00 | $22.50 | $30.00 |
| 56 | Sediment barrier, type 8 (0280-0115080F) | LF | 426 | $13.00 | $13.25 | $25.00 | $12.00 | $25.00 |
| 57 | Midwest guardrail system, type 4 (0810-0146100F) | LF | 93.75 | $35.54 | $100.00 | $35.54 | $37.50 | $88.00 |
| 58 | Concrete barrier (0820-0100000F) | LF | 175 | $185.00 | $302.00 | $185.00 | $155.00 | $210.00 |
| 59 | General structural concrete, class 3300 (0540-0301000A) | CY | 34 | $588.24 | $705.88 | $1,470.59 | $1,176.47 | $588.24 |
| 60 | Temporary signs (0222-0102000J) | SF | 778 | $32.00 | $29.50 | $67.74 | $23.00 | $40.00 |
| 61 | Delineators, type 4 alternate 2 (0840-0104200E) | EACH | 360 | $52.00 | $35.00 | $53.03 | $40.00 | $45.00 |
| 62 | Extra for new curb ramps (0759-0154100E) | EACH | 4 | $400.00 | $4,620.00 | $1,450.00 | $100.00 | $2,100.00 |
| 63 | Remove and reinstall existing signs (0905-0101000A) | LS | 1 | $20,000 | $6,660.00 | $9,400.00 | $15,000 | $9,500.00 |
| 64 | Inlet protection, type 3 (0280-0114030E) | EACH | 22 | $80.00 | $183.00 | $100.00 | $150.00 | $200.00 |
| 65 | Plastic sheeting (0280-0101000J) | SY | 100 | $6.00 | $5.00 | $5.99 | $15.00 | $12.00 |
| 66 | Straw bale (0280-0119000E) | EACH | 25 | $60.00 | $100.00 | $50.00 | $50.00 | $60.00 |
| 67 | Perforated steel square tube anchor sign supports (0930-0117000A) | LB | 730 | $6.85 | $3.48 | $19.95 | $3.42 | $1.37 |
| 68 | Delineators, type 1 (0840-0100000E) | EACH | 360 | $71.00 | $60.00 | $72.83 | $100.00 | $100.00 |
| 69 | Sediment fence (0280-0113000F) | LF | 500 | $6.00 | $6.00 | $25.00 | $3.00 | $2.50 |
| 70 | Soil sample collection and analytical testing (0294-0700000E) | EACH | 1 | $3,500.00 | $3,600.00 | $2,000.00 | $4,000.00 | $1,750.00 |
| 71 | Vertical concrete parapet, 42 inch, modified (0587-0116000A) | LF | 44 | $454.55 | $545.45 | $1,022.73 | $681.82 | $427.27 |
| 72 | Bar removal (0225-0156000J) | SF | 200 | $11.00 | $12.30 | $10.25 | $10.50 | $10.00 |
| 73 | Automated flagger assistance device (0223-0200000E) | EACH | 2 | $9,600.00 | $3,600.00 | $5,000.00 | $5,000.00 | $20,000 |
| 74 | Flaggers (0223-0168000T) | HR | 8,004 | $77.00 | $100.50 | $84.00 | $68.00 | $84.00 |
| 75 | Temporary transverse rumble strips (0225-0153800F) | LF | 72 | $60.00 | $105.00 | $200.00 | $85.00 | $190.00 |
| 76 | Removal of concrete barrier (0310-0200000F) | LF | 775 | $12.00 | $20.00 | $23.00 | $13.00 | $46.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of September 18, 2025. Compiled by Mirage Metrics.