ODOT contract 15614 bid tabulation

Or18b curb ramps (willamina/sheridan). Let by Oregon DOT on September 11, 2025, Region 2. 5 bids received.

Owner
Oregon DOT
Letting
11 SEP 2025
Pay items
86
Data through
13 AUG 2026

Bidders

RankTotal bidAgainst the low bid
1Low
2
3
4
5
ODOT contract 15614: bids by rank

Bid tabulation

LinePay itemUnitQuantityRank 1Rank 2Rank 3Rank 4Rank 5
1Asphalt approaches (0749-0110000E)EACH1$3,200.00$2,500.00$1,800.00$1,800.00$3,320.00
2Flaggers (0223-0168000T)HR1,500$77.00$74.00$82.00$77.00$100.00
3Temporary signs (0222-0102000J)SF925$9.00$24.00$10.00$21.00$12.00
4Perforated steel square tube anchor sign supports (0930-0117000A)LB322$6.21$0.93$9.32$9.63$9.32
5Concrete manholes, shallow (0470-0105000E)EACH5$5,000.00$6,500.00$6,400.00$8,250.00$5,140.00
6Connection to existing structures (0490-0104000E)EACH16$1,600.00$700.00$1,000.00$1,500.00$1,030.00
7Sign support footings (0920-0100000A)CY1.53$7,843.14$4,705.88$13,464$3,594.77$13,464
815 inch storm sewer pipe, 5 FT depth (0445-035015AF)LF51$222.00$230.00$274.00$300.00$330.00
9Traffic control supervisor (0223-0169000E)EACH188$300.00$800.00$500.00$500.00$340.00
10Portable changeable message signs (0222-0164000E)EACH4$1,200.00$13,200$11,000$8,000.00$6,300.00
118 inch storm sewer pipe, 5 FT depth (0445-035008AF)LF103$145.00$150.00$140.00$183.00$197.00
128 inch PVC pipe, 5 FT depth (0445-052008AF)LF20$200.00$140.00$145.00$230.00$220.00
13Traffic signal modification, bridge street signal (0990-0102000A)EACH1$58,000$85,000$65,341$55,100$79,540
14Concrete driveways (0759-0126000J)SF137$28.00$30.00$18.00$28.00$25.00
15Pedestrian channelizing devices (0228-0141600F)LF5,700$8.00$2.00$27.00$6.00$11.00
16Bar removal (0225-0156000J)SF255$21.00$16.25$16.25$17.00$20.00
17Concrete walks (0759-0128000J)SF26,055$12.00$15.00$14.50$16.50$17.00
18Aggregate base (0640-0100000M)TON1,857$77.00$70.00$68.00$28.00$78.00
19Embankment in place (0330-0123000K)CY10$175.00$200.00$180.00$135.00$143.00
20Asphalt pavement sawcutting, 8 inches deep (0310-0119100F)LF6,100$3.00$2.80$6.00$2.50$5.00
21Removal of inlets (0310-0104000E)EACH32$600.00$280.00$500.00$320.00$1,050.00
22Remove and reinstall existing signs (0905-0101000A)LS1$5,000.00$7,000.00$18,100$18,375$18,100
23Truncated domes on new surfaces (0759-0510000J)SF1,738$38.00$55.00$40.00$37.00$46.00
24Concrete inlets, type CG-3 (0470-0309000E)EACH8$3,000.00$3,500.00$3,000.00$3,650.00$3,630.00
254 inch drain pipe (0430-0100040F)LF4$196.00$300.00$200.00$195.00$126.00
26Pollution control plan (0290-0100000A)LS1$500.00$3,000.00$3,500.00$350.00$1,520.00
27Concrete sawcutting, 4 inches deep (0310-0119200F)LF1,500$3.00$3.25$6.00$3.00$4.50
28Level 3, 1/2 inch ACP mixture (0744-0302000M)TON70$200.00$300.00$200.00$210.00$410.00
29Clearing and grubbing (0320-0100000A)ACRE0.02$75,000$1,500,000$500,000$240,000$346,500
30Remove existing signs (0905-0100000A)LS1$500.00$2,000.00$300.00$800.00$300.00
31Concrete inlets, type G-2 (0470-0315000E)EACH32$3,000.00$3,500.00$3,000.00$3,200.00$4,340.00
32Inlet protection, type 10 (0280-0114100E)EACH1$125.00$200.00$300.00$90.00$92.00
33Stripe removal (0225-0154000F)LF1,190$6.00$2.00$2.00$2.00$2.50
34Plastic sheeting (0280-0101000J)SY100$2.00$4.00$10.00$3.50$3.25
35Adjusting inlets (0490-0105000E)EACH35$800.00$1,400.00$1,200.00$750.00$490.00
36Contaminated soil disposal (0294-0200010M)TON70$189.00$120.00$200.00$134.00$110.00
37Signs, standard sheeting, sheet aluminum (0940-0202000J)SF16$65.00$50.00$49.00$40.00$49.00
38Inlet protection, type 7 (0280-0114070E)EACH75$74.00$120.00$300.00$100.00$126.00
3912 inch storm sewer pipe, 5 FT depth (0445-035012AF)LF34$202.00$200.00$220.00$295.00$290.00
406 inch gate valve (1150-0100000E)EACH2$3,300.00$2,000.00$2,000.00$1,900.00$4,200.00
41Flagger station lighting (0223-0168100E)EACH4$500.00$4,380.00$3,700.00$1,100.00$3,150.00
428 inch gate valve (1150-0100000E)EACH1$3,200.00$4,000.00$2,550.00$2,600.00$3,140.00
43Mono-directional white type I markers (0855-0100100E)EACH20$50.00$25.00$25.00$26.00$25.00
44Lawn seeding (1030-0138000J)SY60$50.00$40.00$40.00$39.00$49.00
456 inch potable water pipe, fittings and couplings with class B backfill (1140-0100000F)LF72$240.00$175.00$199.00$220.00$320.00
46Reconnecting existing water services, 3/4 inch (1170-0104000E)EACH1$180.00$600.00$2,300.00$600.00$1,560.00
47Pavement bar, type B-HS (0867-0145100J)SF1,940$23.00$18.50$18.50$19.00$18.50
48Minor adjustment of manholes (0490-0120000E)EACH9$1,500.00$1,000.00$2,000.00$2,500.00$810.00
49Adjusting boxes (0490-0100000E)EACH29$820.00$300.00$400.00$225.00$620.00
50Straw bale (0280-0119000E)EACH25$15.00$60.00$60.00$52.00$9.00
51Cold plane pavement removal, 0 - 4 inches deep (0620-0107000J)SY50$140.00$90.00$165.00$86.00$670.00
52Trench drain, type 3 (0446-0102000F)LF30$185.00$220.00$170.00$350.00$320.00
53Health and safety plan (0294-0100000A)LS1$200.00$3,000.00$1,000.00$350.00$3,050.00
54Salvage, stockpile and reinstall pavers (1999-9Z90000J)SF12$95.00$130.00$300.00$125.00$44.00
553/4 inch water service connection piping (1170-0103000F)LF25$450.00$120.00$102.00$120.00$450.00
56Concrete curbs, curb and gutter (0759-0103000F)LF3,877$58.00$30.00$45.00$67.00$42.00
57Filling abandoned structures (0490-0117000E)EACH1$3,500.00$1,500.00$2,500.00$3,850.00$4,980.00
58Commercial asphalt concrete pavement (0740-0100000M)TON711$215.00$190.00$220.00$265.00$370.00
59Temporary plastic drums (0224-0145000E)EACH300$15.00$55.00$50.00$14.50$44.00
606 inch ductile iron pipe, 5 FT depth (0445-060006AF)LF120$200.00$150.00$165.00$225.00$240.00
61Removal of surfacings for curb ramp construction (0310-0106101J)SY5,537$27.00$28.00$45.00$60.00$62.00
62Relocate 3/4 inch water meter assembly (1170-0111000E)EACH5$4,500.00$1,500.00$2,825.00$1,950.00$4,640.00
63Moving existing hydrants (1160-0102000E)EACH3$1,500.00$2,800.00$6,200.00$2,300.00$3,020.00
64Wood sign posts (0910-0100000K)FBM500$35.00$18.00$40.00$16.65$40.00
65Concrete curbs, low profile mountable curb (0759-0106000F)LF29$70.00$50.00$50.00$68.00$40.00
66Mailbox concrete collars (1070-0102000E)EACH1$1,000.00$100.00$200.00$275.00$360.00
67Asphalt slope paving (0749-0116000J)SF20$175.00$20.00$90.00$35.00$51.00
68Perforated steel square tube slip base sign supports (0930-0114000A)LB88$5.68$12.50$23.30$20.45$23.30
69Removal of fences (0310-0112000A)LF30$16.67$100.00$100.00$66.67$31.67
708 inch potable water pipe, fittings and couplings with class B backfill (1140-0100000F)LF39$215.00$210.00$219.00$320.00$400.00
71Temporary barricades, type III (0224-0105000E)EACH20$70.00$200.00$175.00$82.00$76.00
72Removal of structures and obstructions (0310-0106000A)LS1$5,000.00$5,000.00$5,000.00$20,000$21,510
73Single mailbox supports (1070-0100000E)EACH1$1,500.00$475.00$1,000.00$965.00$750.00
74Removal of pipes (0310-0100000F)LF188$123.00$23.00$53.00$90.00$85.00
75Temporary curb ramp, parallel (0228-0167670E)EACH38$850.00$450.00$2,486.00$600.00$310.00
768 inch ductile iron pipe, 5 FT depth (0445-060008AF)LF411$200.00$155.00$145.00$230.00$250.00
77Service line lateral video inspection (0415-0400000E)EACH37$250.00$200.00$500.00$300.00$490.00
78Extra for concrete walks with existing railing (1999-9Z90000E)EACH6$1,500.00$4,000.00$600.00$650.00$3,840.00
79Permanent surface mounted tubular markers (0856-0101000E)EACH11$250.00$350.00$350.00$365.00$430.00
804 inch potable water pipe, fittings & couplings with restrained joints and class B backfill (1140-0145000F)LF42$200.00$180.00$135.00$200.00$320.00
812 inch water service connection piping (1170-0103000F)LF12$250.00$150.00$215.00$120.00$840.00
82Concrete curbs, standard curb (0759-0110000F)LF914$54.00$30.00$40.00$54.00$48.00
83Trench resurfacing (0495-0100000J)SY44$131.00$90.00$75.00$230.00$162.00
84Lead compliance plan (0294-0500000A)LS1$2,500.00$3,000.00$6,700.00$650.00$2,290.00
85Inlet protection, type 3 (0280-0114030E)EACH1$100.00$200.00$300.00$74.00$86.00
86Temporary barricades, type II (0224-0104000E)EACH55$50.00$60.00$65.00$55.00$44.00
ODOT contract 15614: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.

Every contract let that day: ODOT letting of September 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy