ODOT contract 15618 bid tabulation
Portland metro area 2024-2027 ada curb ramps, phase 6. Let by Oregon DOT on October 30, 2025, Region 1. 7 bids received.
- Owner
- Oregon DOT
- Letting
- 30 OCT 2025
- Pay items
- 83
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 | ||
| 7 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 | Rank 5 | Rank 6 |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Temporary plastic drums (0224-0145000E) | EACH | 600 | $35.00 | $60.00 | $50.00 | $15.00 | $15.00 | $15.00 |
| 2 | Pollution control plan (0290-0100000A) | LS | 1 | $5,000.00 | $1,000.00 | $2,500.00 | $500.00 | $875.00 | $2,500.00 |
| 3 | Truncated domes on new surfaces, curb ramp (0765-0100000J) | SF | 3,650 | $59.00 | $32.50 | $50.00 | $33.50 | $58.00 | $45.00 |
| 4 | Traffic signal modification, SW beef bend RD. (MP 10.95) (tigard) (0990-0102000A) | EACH | 1 | $3,800.00 | $3,500.00 | $3,500.00 | $2,050.00 | $2,100.00 | $2,100.00 |
| 5 | Traffic signal modification, US26 @ midblock crossing (MP 0.11) (portland) (0990-0102000A) | EACH | 1 | $2,655.00 | $3,000.00 | $2,000.00 | $995.00 | $1,100.00 | $2,003.00 |
| 6 | Removing and rebuilding fence (1050-0240000F) | LF | 80 | $109.00 | $80.00 | $75.00 | $80.50 | $110.00 | $130.00 |
| 7 | Traffic signal modification, SW miles ST.(SW 3RD ave.) (MP 3.85) (portland) (0990-0102000A) | EACH | 1 | $11,095 | $12,000 | $10,000 | $8,700.00 | $9,500.00 | $7,800.00 |
| 8 | Soil sample collection and analytical testing (0294-0700000E) | EACH | 5 | $1,000.00 | $1,750.00 | $3,500.00 | $1,600.00 | $2,900.00 | $4,800.00 |
| 9 | Cold plane pavement removal, 2 inches deep (0620-0120000J) | SY | 200 | $175.00 | $92.00 | $45.00 | $115.00 | $89.00 | $55.00 |
| 10 | Traffic signal modification, holmes ST. (MP 10.52) (west linn) (0990-0102000A) | EACH | 1 | $2,538.00 | $2,500.00 | $3,000.00 | $890.00 | $960.00 | $3,000.00 |
| 11 | Traffic signal modification, pacific hwy. W. at SW 116TH ave. (SW durham RD.) OR99W (MP 11.46) (tigard) (0990-0102000A) | EACH | 1 | $25,000 | $27,500 | $26,500 | $22,900 | $24,810 | $30,000 |
| 12 | Pavement bar, type B-HS (0867-0145100J) | SF | 850 | $21.75 | $15.00 | $20.00 | $20.00 | $22.00 | $26.00 |
| 13 | Thermoplastic, extruded, surface, profiled (0865-0116600F) | LF | 10 | $41.00 | $15.00 | $35.00 | $37.50 | $41.00 | $29.00 |
| 14 | Concrete driveways (0759-0126000J) | SF | 1,000 | $34.25 | $22.00 | $25.00 | $18.75 | $27.00 | $16.00 |
| 15 | Concrete curbs, curb and gutter (0759-0103000F) | LF | 9,100 | $47.00 | $65.00 | $45.00 | $68.00 | $43.00 | $70.00 |
| 16 | Temporary striping (0225-0153000F) | LF | 200 | $6.50 | $0.50 | $6.00 | $6.00 | $6.40 | $6.00 |
| 17 | Cold plane pavement removal, 4 inches deep (0620-0123000J) | SY | 1,800 | $74.00 | $39.00 | $40.00 | $72.00 | $40.00 | $38.00 |
| 18 | Sediment barrier, type 3 (0280-0115030F) | LF | 25 | $9.50 | $14.00 | $7.50 | $11.00 | $6.25 | $19.00 |
| 19 | Traffic control supervisor (0223-0169000E) | EACH | 300 | $425.00 | $300.00 | $750.00 | $300.00 | $320.00 | $1,100.00 |
| 20 | Traffic signal modification, molalla ave. (douglas loop RD.) (MP 3.59) (oregon city) (0990-0102000A) | EACH | 1 | $10,980 | $11,000 | $13,500 | $8,590.00 | $9,315.00 | $9,000.00 |
| 21 | Traffic signal modification, S leland RD. (MP 5.73) (clackamas CO.) (0990-0102000A) | EACH | 1 | $11,800 | $12,500 | $7,000.00 | $9,450.00 | $10,000 | $7,000.00 |
| 22 | Aggregate base (0641-0102000M) | TON | 4,600 | $84.50 | $30.00 | $76.00 | $34.00 | $45.00 | $80.00 |
| 23 | Temporary signs (0222-0102000J) | SF | 4,000 | $6.75 | $24.00 | $24.00 | $11.00 | $29.00 | $7.00 |
| 24 | Pedestrian channelizing devices (0228-0141600F) | LF | 2,000 | $23.50 | $37.00 | $25.00 | $23.00 | $9.00 | $15.00 |
| 25 | Health and safety plan (0294-0100000A) | LS | 1 | $5,800.00 | $2,400.00 | $2,500.00 | $500.00 | $4,080.00 | $2,000.00 |
| 26 | Adjusting boxes (0490-0100000E) | EACH | 19 | $262.00 | $175.00 | $300.00 | $250.00 | $310.00 | $1,100.00 |
| 27 | Adjusting inlets (0490-0105000E) | EACH | 68 | $485.00 | $2,300.00 | $1,800.00 | $900.00 | $612.00 | $800.00 |
| 28 | Thermoplastic, extruded, surface, non-profiled (0865-0116610F) | LF | 200 | $10.00 | $2.50 | $8.50 | $9.00 | $10.00 | $15.00 |
| 29 | Concrete sawcutting, 4 inches deep (0310-0119200F) | LF | 2,500 | $2.25 | $9.50 | $5.00 | $4.50 | $3.00 | $5.00 |
| 30 | Perforated steel square tube anchor sign supports (0930-0117000A) | LB | 1,385 | $17.41 | $14.44 | $10.83 | $11.55 | $12.27 | $5.20 |
| 31 | Pavement legend, type B-HS: arrows (0867-0103100E) | EACH | 3 | $645.00 | $350.00 | $550.00 | $600.00 | $640.00 | $600.00 |
| 32 | Traffic signal modification, SW bertha BLVD.(091CJ conn. M.P.1C4.22) (MP 4.22) (portland) (0990-0102000A) | EACH | 1 | $8,803.00 | $9,000.00 | $7,000.00 | $6,600.00 | $7,000.00 | $6,500.00 |
| 33 | Concrete islands (0759-0122000J) | SF | 700 | $28.00 | $30.00 | $25.00 | $22.00 | $26.00 | $38.00 |
| 34 | Sequential arrow signs (0222-0162000E) | EACH | 25 | $1,400.00 | $1,000.00 | $6,500.00 | $1,500.00 | $1,154.00 | $500.00 |
| 35 | Temporary curb ramp, parallel (0228-0167670E) | EACH | 212 | $189.00 | $750.00 | $750.00 | $450.00 | $265.00 | $600.00 |
| 36 | Bark mulch (1040-0190000K) | CY | 60 | $65.00 | $58.00 | $60.00 | $59.00 | $215.00 | $250.00 |
| 37 | Permanent seeding (1030-0108000R) | ACRE | 0.30 | $17,650 | $16,500 | $15,000 | $16,000 | $33,000 | $76,000 |
| 38 | Extra for asphalt slope paving (0749-0108000J) | SF | 85 | $17.50 | $22.00 | $15.00 | $20.50 | $17.50 | $60.00 |
| 39 | Inlet protection, type 11 (0280-0114110E) | EACH | 12 | $115.00 | $220.00 | $150.00 | $90.00 | $170.00 | $120.00 |
| 40 | Inlet protection, type 3 (0280-0114030E) | EACH | 118 | $64.00 | $125.00 | $150.00 | $75.00 | $220.00 | $120.00 |
| 41 | Stripe removal (0225-0154000F) | LF | 212 | $7.00 | $0.75 | $6.00 | $6.50 | $6.50 | $18.00 |
| 42 | Temporary removable tape (0225-0150000F) | LF | 500 | $12.25 | $6.75 | $6.00 | $11.30 | $3.50 | $6.00 |
| 43 | Traffic signal modification, 091CT front.(SW edy RD.)M.P.1F15.35 (MP 15.35) (sherwood) (0990-0102000A) | EACH | 1 | $12,009 | $12,000 | $3,500.00 | $9,500.00 | $10,000 | $3,000.00 |
| 44 | Traffic signal modification, caufield RD. (glen oak RD.) (MP 3.81) (oregon city) (0990-0102000A) | EACH | 1 | $6,185.00 | $6,000.00 | $10,000 | $4,200.00 | $4,570.00 | $8,500.00 |
| 45 | Plain concrete pavement repair (0754-0100000J) | SY | 10 | $541.00 | $475.00 | $300.00 | $512.00 | $475.00 | $420.00 |
| 46 | Concrete curbs, standard curb (0759-0110000F) | LF | 4,300 | $47.00 | $62.00 | $35.00 | $54.00 | $43.00 | $52.00 |
| 47 | Legend removal (0225-0155100J) | SF | 34 | $14.00 | $7.25 | $12.00 | $13.00 | $13.50 | $18.00 |
| 48 | Perforated steel square tube slip base sign supports (0930-0114000A) | LB | 710 | $16.56 | $16.90 | $11.27 | $12.96 | $14.08 | $8.45 |
| 49 | Remove and reinstall existing signs (0905-0101000A) | LS | 1 | $3,763.00 | $8,000.00 | $7,000.00 | $7,500.00 | $8,100.00 | $2,500.00 |
| 50 | Extra for pavement repair (0749-0109000J) | SF | 18,500 | $3.00 | $4.00 | $10.00 | $7.85 | $8.75 | $6.00 |
| 51 | Asphalt pavement sawcutting, 10 inches deep (0310-0119100F) | LF | 10,600 | $5.00 | $9.50 | $4.00 | $3.25 | $1.75 | $5.00 |
| 52 | Temporary barricades, type II (0224-0104000E) | EACH | 50 | $49.00 | $65.00 | $65.00 | $55.00 | $34.00 | $150.00 |
| 53 | Traffic signal modification, OR99W @ SW 13TH ave. (MP 4.45) (portland) (0990-0102000A) | EACH | 1 | $4,508.00 | $4,500.00 | $2,500.00 | $2,690.00 | $2,910.00 | $2,930.00 |
| 54 | Wood sign posts (0910-0100000K) | FBM | 253 | $17.50 | $17.50 | $17.00 | $18.25 | $20.00 | $19.00 |
| 55 | Level 3, 1/2 inch ACP mixture (0744-0302000M) | TON | 1,400 | $240.00 | $235.00 | $200.00 | $205.00 | $222.00 | $300.00 |
| 56 | Contaminated soil disposal (0294-0200010M) | TON | 546 | $125.00 | $132.00 | $115.00 | $105.00 | $125.00 | $75.00 |
| 57 | Temporary barricades, type III (0224-0105000E) | EACH | 45 | $145.00 | $210.00 | $175.00 | $85.00 | $105.00 | $150.00 |
| 58 | Inlet protection, type 10 (0280-0114100E) | EACH | 3 | $49.00 | $125.00 | $300.00 | $90.00 | $100.00 | $120.00 |
| 59 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $9,150.00 | $60,000 | $20,000 | $45,000 | $5,300.00 | $22,960 |
| 60 | Minor adjustment of manholes (0490-0120000E) | EACH | 6 | $850.00 | $1,900.00 | $1,500.00 | $2,900.00 | $1,500.00 | $1,200.00 |
| 61 | Traffic signal modification, 001SZ conn. M.P. 1C299.59 (SW curry ST.) (MP 0.37) (portland) (0990-0102000A) | EACH | 1 | $3,800.00 | $3,500.00 | $3,000.00 | $2,000.00 | $2,000.00 | $3,000.00 |
| 62 | Topsoil (1040-0101000K) | CY | 170 | $53.00 | $48.00 | $65.00 | $48.50 | $192.00 | $220.00 |
| 63 | Flagger station lighting (0223-0168100E) | EACH | 4 | $4,940.00 | $3,000.00 | $4,500.00 | $1,150.00 | $170.00 | $3,500.00 |
| 64 | Concrete washout facility (0280-0112500E) | EACH | 20 | $705.00 | $750.00 | $2,500.00 | $1,000.00 | $690.00 | $250.00 |
| 65 | Catch basins, type CG-30 (0470-0332000E) | EACH | 1 | $4,498.00 | $4,800.00 | $4,150.00 | $3,250.00 | $3,000.00 | $5,500.00 |
| 66 | Temporary walks (0228-0167680J) | SF | 500 | $75.00 | $9.00 | $25.00 | $15.00 | $12.00 | $13.00 |
| 67 | Sign support footings (0920-0100000A) | CY | 5.40 | $7,555.56 | $3,518.52 | $3,333.33 | $3,425.93 | $3,703.70 | $3,703.70 |
| 68 | Temporary pavement bars (0225-0153200J) | SF | 48 | $14.00 | $2.50 | $12.00 | $13.00 | $13.50 | $15.00 |
| 69 | Connection to existing structures (0490-0104000E) | EACH | 1 | $754.00 | $2,500.00 | $1,500.00 | $1,500.00 | $1,580.00 | $2,800.00 |
| 70 | Concrete manholes, shallow (0470-0105000E) | EACH | 1 | $9,167.00 | $8,500.00 | $8,500.00 | $8,500.00 | $5,750.00 | $6,500.00 |
| 71 | Clearing and grubbing (0320-0100000A) | ACRE | 0.10 | $58,000 | $200,000 | $350,000 | $145,000 | $100,000 | $50,000 |
| 72 | Traffic signal modification, hidden springs RD. (MP 8.90) (west linn) (0990-0102000A) | EACH | 1 | $2,700.00 | $2,500.00 | $4,500.00 | $1,050.00 | $1,135.00 | $2,550.00 |
| 73 | Traffic signal modification, entrance barbur boulevard park and ride (MP 5.95) (portland) (0990-0102000A) | EACH | 1 | $7,000.00 | $7,000.00 | $6,000.00 | $5,050.00 | $5,475.00 | $4,000.00 |
| 74 | Crosswalk closure supports (0902-0101000E) | EACH | 9 | $1,425.00 | $1,250.00 | $1,500.00 | $1,290.00 | $1,390.00 | $1,500.00 |
| 75 | Weed control geotextile (1040-0208000J) | SF | 1,500 | $2.35 | $0.32 | $1.50 | $0.33 | $2.25 | $3.00 |
| 76 | 12 inch storm sewer pipe, 5 FT depth (0445-035012AF) | LF | 50 | $250.00 | $300.00 | $165.00 | $325.00 | $155.00 | $275.00 |
| 77 | Flaggers (0223-0168000T) | HR | 2,500 | $82.00 | $78.00 | $74.00 | $79.50 | $86.00 | $70.00 |
| 78 | Traffic signal modification, SW fischer RD. (MP 11.92) (washington CO.) (0990-0102000A) | EACH | 1 | $7,200.00 | $7,500.00 | $6,500.00 | $5,200.00 | $5,700.00 | $4,300.00 |
| 79 | Traffic signal modification, SW cipole RD. (MP 13.32) (tualatin) (0990-0102000A) | EACH | 1 | $15,500 | $16,000 | $9,000.00 | $12,895 | $13,000 | $9,500.00 |
| 80 | Concrete walks (0759-0128000J) | SF | 58,000 | $20.50 | $22.50 | $13.75 | $17.80 | $18.00 | $16.00 |
| 81 | Segregate and stockpile contaminated soil (0294-0600000A) | LS | 1 | $6,140.00 | $20,000 | $20,000 | $13,000 | $4,650.00 | $50,000 |
| 82 | Bar removal (0225-0156000J) | SF | 450 | $14.00 | $3.25 | $12.00 | $13.00 | $13.50 | $18.00 |
| 83 | Removal of surfacings for curb ramp construction (0310-0106101J) | SY | 9,700 | $4.50 | $27.00 | $40.00 | $38.50 | $17.25 | $39.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of October 30, 2025. Compiled by Mirage Metrics.