ODOT contract 15626 bid tabulation
Jackson and josephine county curb ramps, phase 3. Let by Oregon DOT on December 11, 2025, Region 3. 6 bids received.
- Owner
- Oregon DOT
- Letting
- 11 DEC 2025
- Pay items
- 129
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 | Rank 5 | Rank 6 |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Connection to existing structures (0490-0104000E) | EACH | 23 | $500.00 | $1,500.00 | $1,500.00 | $1,000.00 | $1,750.00 | $1,860.00 |
| 2 | Traffic signal modification, 6TH ST at savage ST (0990-0102000A) | EACH | 1 | $52,500 | $44,000 | $58,000 | $52,000 | $50,000 | $48,000 |
| 3 | Traffic signal modification, siskiyou BLVD at walker ave (0990-0102000A) | EACH | 1 | $45,000 | $40,000 | $52,000 | $44,000 | $41,000 | $42,000 |
| 4 | Traffic signal modification, 7TH ST at H ST (0990-0102000A) | EACH | 1 | $60,000 | $49,000 | $55,000 | $57,000 | $52,000 | $53,000 |
| 5 | Minor adjustment of manholes (0490-0120000E) | EACH | 12 | $1,500.00 | $1,200.00 | $1,500.00 | $350.00 | $2,000.00 | $1,800.00 |
| 6 | Traffic signal modification, pacific hwy at lowry LN (0990-0102000A) | EACH | 1 | $110,000 | $91,000 | $55,000 | $107,000 | $100,000 | $95,000 |
| 7 | Traffic signal modification, main ST at pioneer ST (0990-0102000A) | EACH | 1 | $30,000 | $24,000 | $31,000 | $28,000 | $27,000 | $28,000 |
| 8 | Level 3, 1/2 inch ACP mixture (0744-0302000M) | TON | 3,480 | $200.00 | $220.00 | $220.00 | $320.00 | $250.00 | $260.00 |
| 9 | Cold plane pavement removal, 4 inches deep (0620-0123000J) | SY | 4,830 | $6.75 | $34.00 | $27.00 | $33.00 | $30.00 | $8.00 |
| 10 | Concrete inlets, type CG-2 (0470-0307000E) | EACH | 8 | $6,000.00 | $6,700.00 | $3,500.00 | $4,640.00 | $3,700.00 | $3,800.00 |
| 11 | Stripe removal (0225-0154000F) | LF | 1,559.20 | $0.88 | $0.88 | $2.00 | $1.00 | $0.88 | $3.00 |
| 12 | Rock mulch (1040-0196000M) | TON | 2.30 | $600.00 | $800.00 | $300.00 | $900.00 | $800.00 | $820.00 |
| 13 | Lawn seeding (1030-0138000J) | SY | 73 | $35.00 | $30.00 | $75.00 | $34.00 | $30.00 | $34.00 |
| 14 | Traffic signal modification, 6TH ST at J ST (0990-0102000A) | EACH | 1 | $5,500.00 | $8,500.00 | $6,000.00 | $5,400.00 | $7,000.00 | $9,000.00 |
| 15 | Traffic signal modification, 6TH ST at G ST (0990-0102000A) | EACH | 1 | $45,000 | $22,000 | $20,000 | $25,000 | $25,000 | $26,000 |
| 16 | Portable changeable message signs (0222-0164000E) | EACH | 5 | $6,000.00 | $13,000 | $4,000.00 | $2,600.00 | $3,500.00 | $40,000 |
| 17 | Clearing and grubbing (0320-0100000A) | ACRE | 0.17 | $294,118 | $235,294 | $58,824 | $58,824 | $294,118 | $3,264,706 |
| 18 | Traffic signal modification, 7TH ST at M ST (0990-0102000A) | EACH | 1 | $6,500.00 | $8,500.00 | $4,000.00 | $5,400.00 | $7,000.00 | $9,000.00 |
| 19 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $100,000 | $40,000 | $120,000 | $95,000 | $350,000 | $215,000 |
| 20 | Aggregate base (0640-0100000M) | TON | 6,750 | $25.00 | $68.00 | $91.00 | $85.00 | $27.00 | $69.00 |
| 21 | Traffic signal modification, pacific hwy at sage RD (0990-0102000A) | EACH | 1 | $40,000 | $34,000 | $45,000 | $39,000 | $36,000 | $38,000 |
| 22 | Traffic signal modification, 7TH ST at J ST (0990-0102000A) | EACH | 1 | $60,000 | $51,000 | $72,000 | $59,000 | $55,000 | $55,000 |
| 23 | Traffic signal modifcation, 6TH ST at E ST (0990-0102000A) | EACH | 1 | $32,500 | $27,000 | $22,000 | $31,000 | $28,000 | $31,000 |
| 24 | Traffic signal modification, 7TH ST at savage ST (0990-0102000A) | EACH | 1 | $72,500 | $60,000 | $59,000 | $71,000 | $65,000 | $64,000 |
| 25 | Traffic signal modification, 7TH ST at evelyn ave (0990-0102000A) | EACH | 1 | $115,000 | $96,000 | $92,000 | $114,000 | $100,000 | $100,000 |
| 26 | Sign support footings (0920-0100000A) | CY | 2.43 | $4,320.99 | $8,230.45 | $8,230.45 | $7,818.93 | $3,703.70 | $13,992 |
| 27 | Traffic signal modification, 6TH ST at I ST (0990-0102000A) | EACH | 1 | $60,000 | $51,000 | $45,000 | $59,000 | $52,000 | $55,000 |
| 28 | Concrete walks (0759-0128000J) | SF | 77,707 | $8.50 | $12.00 | $13.00 | $11.90 | $15.00 | $16.00 |
| 29 | Pavement legend, type B-HS: arrows (0867-0103100E) | EACH | 85 | $425.00 | $425.00 | $450.00 | $448.00 | $425.00 | $600.00 |
| 30 | Grouted durable rock (1999-9Z90000J) | SF | 83 | $125.00 | $50.00 | $275.00 | $76.00 | $55.00 | $52.00 |
| 31 | Concrete curbs, curb and gutter, modified (0759-0105000F) | LF | 10,308 | $37.50 | $48.00 | $60.00 | $56.00 | $54.50 | $51.00 |
| 32 | Segregate and stockpile contaminated soil (0294-0600000A) | LS | 1 | $5,000.00 | $10,000 | $12,000 | $15,000 | $95,000 | $86,000 |
| 33 | Traffic signal modification, main ST at 2ND ST (0990-0102000A) | EACH | 1 | $85,000 | $70,000 | $89,000 | $83,000 | $75,000 | $74,000 |
| 34 | Traffic signal modification, OR238 at harbeck RD (0990-0102000A) | EACH | 1 | $60,000 | $50,000 | $58,000 | $58,000 | $55,000 | $54,000 |
| 35 | Traffic signal modification, US199 at M ST (0990-0102000A) | EACH | 1 | $75,000 | $62,000 | $40,000 | $74,000 | $68,000 | $67,000 |
| 36 | Remove and reinstall unit masonry landscape walls (1999-9Z90000A) | LS | 1 | $6,500.00 | $5,000.00 | $5,000.00 | $14,000 | $4,600.00 | $46,000 |
| 37 | Traffic signal modification, US199 at F ST (0990-0102000A) | EACH | 1 | $95,000 | $77,000 | $100,000 | $90,000 | $80,000 | $81,000 |
| 38 | Truncated domes on new surfaces, curb ramp (0765-0100000J) | SF | 4,070 | $45.00 | $40.00 | $50.00 | $32.00 | $42.00 | $50.00 |
| 39 | Temporary plastic drums (0224-0145000E) | EACH | 500 | $20.00 | $50.00 | $45.00 | $55.00 | $50.00 | $76.00 |
| 40 | Pedestrian channelizing devices (0228-0141600F) | LF | 3,500 | $20.00 | $7.00 | $30.00 | $20.00 | $20.00 | $39.00 |
| 41 | Lead compliance plan (0294-0500000A) | LS | 1 | $500.00 | $2,000.00 | $500.00 | $2,900.00 | $2,500.00 | $5,000.00 |
| 42 | Concrete driveways (0759-0126000J) | SF | 991 | $13.00 | $14.00 | $30.00 | $12.10 | $14.00 | $28.00 |
| 43 | Concrete inlets, type field (0470-0304000E) | EACH | 1 | $5,800.00 | $2,000.00 | $3,500.00 | $3,300.00 | $2,325.00 | $2,700.00 |
| 44 | Traffic signal modification, 6TH ST at A ST (0990-0102000A) | EACH | 1 | $35,000 | $15,000 | $17,000 | $15,000 | $14,300 | $17,000 |
| 45 | Unit pavers (0760-0100000J) | SF | 60 | $80.00 | $60.00 | $55.00 | $17.00 | $24.00 | $28.00 |
| 46 | Concrete manholes, shallow with inlet (0470-0105000E) | EACH | 7 | $9,500.00 | $6,700.00 | $5,000.00 | $15,000 | $8,000.00 | $8,300.00 |
| 47 | Removal of surfacings for curb ramp construction (0310-0106101J) | SY | 16,684 | $50.00 | $44.00 | $38.00 | $68.00 | $59.00 | $39.00 |
| 48 | Inlet protection, type 4 (0280-0114040E) | EACH | 3 | $175.00 | $110.00 | $100.00 | $80.00 | $65.00 | $110.00 |
| 49 | Inlet protection, type 3 (0280-0114030E) | EACH | 56 | $175.00 | $110.00 | $75.00 | $120.00 | $80.00 | $75.00 |
| 50 | Temporary signs (0222-0102000J) | SF | 6,402 | $8.50 | $10.00 | $12.00 | $10.00 | $14.00 | $38.00 |
| 51 | Traffic signal modification, 7TH ST at morgan LN (0990-0102000A) | EACH | 1 | $35,000 | $30,000 | $45,000 | $34,000 | $35,000 | $34,000 |
| 52 | Flagger station lighting (0223-0168100T) | HR | 264 | $30.00 | $70.00 | $70.00 | $24.00 | $7.00 | $14.00 |
| 53 | Flaggers (0223-0168000T) | HR | 3,168 | $80.00 | $78.00 | $86.00 | $82.00 | $80.00 | $85.00 |
| 54 | Traffic control supervisor (0223-0169000E) | EACH | 296 | $1,200.00 | $620.00 | $1,100.00 | $400.00 | $1,200.00 | $786.00 |
| 55 | Concrete inlets, type G-1 (0470-0313000E) | EACH | 9 | $6,000.00 | $5,500.00 | $4,200.00 | $2,800.00 | $3,700.00 | $3,100.00 |
| 56 | Concrete inlets, type G-2 (0470-0315000E) | EACH | 47 | $6,000.00 | $6,700.00 | $4,200.00 | $3,570.00 | $3,900.00 | $3,900.00 |
| 57 | Perforated steel square tube slip base sign supports (0930-0114000A) | LB | 110 | $27.27 | $18.18 | $20.00 | $12.27 | $10.00 | $272.73 |
| 58 | Pollution control plan (0290-0100000A) | LS | 1 | $500.00 | $2,000.00 | $800.00 | $1,200.00 | $1,000.00 | $1,800.00 |
| 59 | Adjusting boxes (0490-0100000E) | EACH | 221 | $400.00 | $250.00 | $420.00 | $250.00 | $200.00 | $260.00 |
| 60 | Perforated steel square tube anchor sign supports (0930-0117000A) | LB | 1,030 | $8.74 | $11.65 | $14.56 | $12.62 | $8.01 | $29.13 |
| 61 | Concrete storm sewer manholes (0470-0101000E) | EACH | 20 | $8,000.00 | $8,000.00 | $7,000.00 | $11,200 | $6,100.00 | $7,800.00 |
| 62 | Traffic signal modification, 6TH ST at L ST (0990-0102000A) | EACH | 1 | $40,000 | $34,000 | $36,000 | $39,000 | $36,000 | $38,000 |
| 63 | Temporary pavement legends (0225-0153100E) | EACH | 11 | $150.00 | $150.00 | $150.00 | $160.00 | $150.00 | $350.00 |
| 64 | Traffic signal modification, 6TH ST at M ST (0990-0102000A) | EACH | 1 | $30,000 | $26,000 | $25,000 | $30,000 | $28,000 | $30,000 |
| 65 | Traffic signal modification, 7TH ST at D ST (0990-0102000A) | EACH | 1 | $70,000 | $58,000 | $30,000 | $68,000 | $60,000 | $62,000 |
| 66 | Legend removal (0225-0155100J) | SF | 1,496 | $6.65 | $6.65 | $7.00 | $7.00 | $6.65 | $8.00 |
| 67 | Traffic signal modification, pacific hwy at bear creek (0990-0102000A) | EACH | 1 | $80,000 | $66,000 | $95,000 | $78,000 | $70,000 | $70,000 |
| 68 | Extra for manholes over existing sewers (0490-0123000E) | EACH | 15 | $3,500.00 | $3,300.00 | $1,500.00 | $1,800.00 | $3,200.00 | $3,600.00 |
| 69 | Concrete washout facility (0280-0112500E) | EACH | 48 | $100.00 | $1,200.00 | $500.00 | $760.00 | $200.00 | $800.00 |
| 70 | Traffic signal modification, 6TH ST at F ST (0990-0102000A) | EACH | 1 | $72,500 | $60,000 | $54,000 | $71,000 | $61,000 | $64,000 |
| 71 | Traffic signal modification, 7TH ST at E ST (0990-0102000A) | EACH | 1 | $35,000 | $32,265 | $20,000 | $35,000 | $32,000 | $34,000 |
| 72 | Traffic signal modification, US199 at agness ave (0990-0102000A) | EACH | 1 | $100,000 | $82,000 | $110,000 | $97,000 | $86,000 | $87,000 |
| 73 | Mainline video inspection (0415-0100000F) | LF | 1,072 | $6.00 | $13.00 | $18.00 | $8.00 | $17.00 | $21.00 |
| 74 | Drainage curbs (0480-0100000F) | LF | 26 | $50.00 | $110.00 | $95.00 | $190.00 | $122.00 | $70.00 |
| 75 | Adjusting inlets (0490-0105000E) | EACH | 69 | $1,000.00 | $1,500.00 | $700.00 | $600.00 | $3,300.00 | $1,760.00 |
| 76 | Traffic signal modifcation, 6TH ST at park ST (0990-0102000A) | EACH | 1 | $55,000 | $22,000 | $32,000 | $25,000 | $23,000 | $26,000 |
| 77 | Traffic signal modification, 6TH ST at H ST (0990-0102000A) | EACH | 1 | $50,000 | $26,000 | $21,000 | $30,000 | $27,000 | $31,000 |
| 78 | Traffic signal modification, 7TH ST at A ST (0990-0102000A) | EACH | 1 | $105,000 | $87,000 | $95,000 | $103,000 | $93,000 | $91,000 |
| 79 | Metal handrail, 2 rails (1069-0100000F) | LF | 64 | $225.00 | $370.00 | $350.00 | $300.00 | $270.00 | $130.00 |
| 80 | Topsoil (1040-0101000K) | CY | 6 | $275.00 | $203.00 | $250.00 | $220.00 | $200.00 | $210.00 |
| 81 | Retaining wall, prefabricated modular gravity (0596-B002000A) | SF | 74 | $87.84 | $202.70 | $87.84 | $202.70 | $135.14 | $148.65 |
| 82 | Traffic signal modifcation, OR238 at W harbeck RD (0990-0102000A) | EACH | 1 | $65,000 | $41,000 | $60,000 | $48,000 | $42,000 | $45,000 |
| 83 | Thermoplastic, sprayed, surface, non-profiled (0865-0119600F) | LF | 593.60 | $4.50 | $4.50 | $6.00 | $4.75 | $4.50 | $6.00 |
| 84 | Traffic signal modifcation, OR238 at new hope RD (0990-0102000A) | EACH | 1 | $85,000 | $49,000 | $60,000 | $58,000 | $50,000 | $54,000 |
| 85 | Traffic signal modification, front ST at beall LN (0990-0102000A) | EACH | 1 | $12,000 | $10,000 | $14,000 | $10,000 | $12,000 | $14,000 |
| 86 | Contaminated soil disposal (0294-0200010M) | TON | 122.83 | $135.00 | $125.00 | $190.00 | $120.00 | $115.00 | $164.00 |
| 87 | 12 inch storm sewer pipe, 5 FT depth (0445-035012AF) | LF | 877 | $260.00 | $315.00 | $285.00 | $185.00 | $205.00 | $247.00 |
| 88 | Temporary curb ramp, parallel (0228-0167670E) | EACH | 20 | $800.00 | $400.00 | $1,575.00 | $600.00 | $2,500.00 | $5,200.00 |
| 89 | Traffic signal modification, 7TH ST at L ST (0990-0102000A) | EACH | 1 | $37,500 | $33,500 | $45,000 | $35,000 | $35,000 | $35,000 |
| 90 | Traffic signal modification, 7TH ST at F ST (0990-0102000A) | EACH | 1 | $50,000 | $42,000 | $35,000 | $49,000 | $50,000 | $46,000 |
| 91 | Traffic signal modifcation, 6TH ST at evelyn ave (0990-0102000A) | EACH | 1 | $115,000 | $72,000 | $90,000 | $85,000 | $73,000 | $76,000 |
| 92 | Concrete curbs, retaining curb (0759-0102000F) | LF | 82 | $100.00 | $85.00 | $120.00 | $76.00 | $98.00 | $70.00 |
| 93 | 8 inch storm sewer pipe, 5 FT depth (0445-035008AF) | LF | 195 | $280.00 | $215.00 | $250.00 | $175.00 | $180.00 | $200.00 |
| 94 | Soil sample collection and analytical testing (0294-0700000E) | EACH | 3 | $3,500.00 | $2,999.00 | $2,800.00 | $1,500.00 | $2,500.00 | $600.00 |
| 95 | Inlet protection, type 11 (0280-0114110E) | EACH | 83 | $175.00 | $110.00 | $100.00 | $105.00 | $130.00 | $100.00 |
| 96 | Signs, standard sheeting, sheet aluminum (0940-0202000J) | SF | 67 | $60.00 | $35.00 | $60.00 | $40.00 | $70.00 | $38.00 |
| 97 | Pavement legend, type B-HS: bicycle lane stencil (0867-0131000E) | EACH | 15 | $425.00 | $425.00 | $450.00 | $448.00 | $425.00 | $600.00 |
| 98 | Temporary walks (0228-0167680J) | SF | 12,000 | $2.25 | $18.00 | $7.00 | $10.00 | $10.00 | $10.00 |
| 99 | Weed control geotextile (1040-0208000J) | SF | 2,767 | $1.25 | $1.00 | $1.00 | $1.00 | $1.00 | $1.60 |
| 100 | Sequential arrow signs (0222-0162000E) | EACH | 11 | $600.00 | $6,000.00 | $1,700.00 | $600.00 | $4,600.00 | $6,000.00 |
| 101 | Bar removal (0225-0156000J) | SF | 14,584 | $3.75 | $3.75 | $4.50 | $4.00 | $3.75 | $5.75 |
| 102 | Concrete islands (0759-0122000J) | SF | 2,410 | $15.00 | $25.00 | $38.00 | $14.20 | $28.25 | $28.00 |
| 103 | Health and safety plan (0294-0100000A) | LS | 1 | $1,000.00 | $2,000.00 | $800.00 | $1,700.00 | $1,250.00 | $4,000.00 |
| 104 | Sediment barrier, type 8 (0280-0115080F) | LF | 2 | $400.00 | $100.00 | $150.00 | $120.00 | $45.00 | $12.00 |
| 105 | Inlet protection, type 10 (0280-0114100E) | EACH | 16 | $175.00 | $110.00 | $100.00 | $85.00 | $86.00 | $200.00 |
| 106 | Traffic signal modification, 6TH ST at D ST (0990-0102000A) | EACH | 1 | $65,000 | $36,000 | $32,000 | $42,000 | $38,000 | $41,000 |
| 107 | Traffic signal modification, 7TH ST at G ST (0990-0102000A) | EACH | 1 | $35,000 | $30,000 | $33,000 | $31,000 | $30,000 | $31,000 |
| 108 | Temporary barricades, type II (0224-0104000E) | EACH | 100 | $45.00 | $65.00 | $120.00 | $55.00 | $60.00 | $80.00 |
| 109 | Traffic signal modification, 7TH ST at hillcrest DR (0990-0102000A) | EACH | 1 | $65,000 | $55,000 | $85,000 | $64,000 | $60,000 | $59,000 |
| 110 | Traffic signal modification, rogue river hwy at US199 (0990-0102000A) | EACH | 1 | $95,000 | $77,000 | $56,000 | $91,000 | $82,000 | $81,000 |
| 111 | Bark mulch (1040-0190000K) | CY | 25 | $200.00 | $151.00 | $250.00 | $170.00 | $150.00 | $152.00 |
| 112 | Asphalt slope paving (0749-0116000J) | SF | 1,373 | $12.00 | $20.00 | $42.00 | $11.00 | $10.00 | $11.00 |
| 113 | Concrete curbs, standard curb (0759-0110000F) | LF | 3,153 | $32.00 | $34.00 | $44.00 | $35.00 | $40.00 | $46.00 |
| 114 | Green bicycle lane, preformed thermoplastic film (0868-0100000J) | SF | 33 | $25.00 | $25.00 | $50.00 | $26.40 | $25.00 | $26.00 |
| 115 | Temporary barricades, type III (0224-0105000E) | EACH | 70 | $105.00 | $175.00 | $130.00 | $90.00 | $165.00 | $180.00 |
| 116 | Asphalt pavement sawcutting, 11 inches deep (0310-0119100F) | LF | 14,954 | $8.00 | $4.20 | $5.00 | $5.00 | $8.00 | $8.18 |
| 117 | Crosswalk closure supports (0902-0101000E) | EACH | 11 | $1,850.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,250.00 | $600.00 |
| 118 | Trench resurfacing (0495-0100000J) | SY | 177 | $205.00 | $200.00 | $130.00 | $80.00 | $140.00 | $86.00 |
| 119 | Traffic signal modification, US199 at fred meyer (0990-0102000A) | EACH | 1 | $70,000 | $57,000 | $72,000 | $67,000 | $62,000 | $61,000 |
| 120 | Traffic signal modification, 6TH ST at hillcrest DR (0990-0102000A) | EACH | 1 | $102,500 | $86,000 | $95,000 | $100,000 | $86,000 | $90,000 |
| 121 | Pavement bar, type B-HS (0867-0145100J) | SF | 15,698.80 | $12.00 | $13.45 | $15.00 | $15.00 | $13.45 | $14.90 |
| 122 | Curb marking, thermoplastic (0869-0100000F) | LF | 826 | $20.00 | $14.00 | $20.00 | $14.80 | $14.00 | $16.00 |
| 123 | Remove and reinstall existing signs (0905-0101000A) | LS | 1 | $7,500.00 | $4,000.00 | $1,500.00 | $2,300.00 | $4,125.00 | $55,000 |
| 124 | Traffic signal modification, US199 at parkdale DR (0990-0102000A) | EACH | 1 | $50,000 | $37,000 | $80,000 | $43,000 | $40,000 | $41,000 |
| 125 | Traffic signal modification, US199 at terry LN (0990-0102000A) | EACH | 1 | $105,000 | $87,000 | $120,000 | $103,000 | $90,000 | $91,000 |
| 126 | Remove existing signs (0905-0100000A) | LS | 1 | $7,500.00 | $4,000.00 | $1,500.00 | $1,100.00 | $1,000.00 | $45,000 |
| 127 | Wood sign posts (0910-0100000K) | FBM | 64 | $15.00 | $25.00 | $30.00 | $28.00 | $18.00 | $16.00 |
| 128 | Remove and reinstall mailbox supports (1070-0103000E) | EACH | 1 | $750.00 | $500.00 | $1,200.00 | $2,000.00 | $600.00 | $900.00 |
| 129 | Traffic signal modification, US199 at beacon DR (0990-0102000A) | EACH | 1 | $115,000 | $96,000 | $95,000 | $114,000 | $100,000 | $101,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of December 11, 2025. Compiled by Mirage Metrics.