ODOT contract 15628 bid tabulation
Or202: nehalem river bridge. Let by Oregon DOT on December 11, 2025, Region 2. 9 bids received.
- Owner
- Oregon DOT
- Letting
- 11 DEC 2025
- Pay items
- 68
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 | ||
| 7 | ||
| 8 | ||
| 9 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 | Rank 5 | Rank 6 |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Midwest guardrail system, type 2A (0810-0146100F) | LF | 300 | $33.50 | $33.50 | $33.50 | $33.50 | $33.50 | $34.00 |
| 2 | Temporary impact attenuator, narrow site system (0226-0134000E) | EACH | 2 | $4,500.00 | $4,500.00 | $6,000.00 | $4,250.00 | $3,500.00 | $4,800.00 |
| 3 | Guardrail end pieces, type B (0810-0122000E) | EACH | 1 | $300.00 | $215.00 | $215.00 | $214.00 | $214.40 | $235.00 |
| 4 | Aggregate base (0641-0102000M) | TON | 1,200 | $46.00 | $55.00 | $65.00 | $50.00 | $85.00 | $58.00 |
| 5 | Drainage curbs (0480-0100000F) | LF | 104 | $42.00 | $40.00 | $60.00 | $50.00 | $40.38 | $42.00 |
| 6 | Filling abandoned structures (0490-0117000E) | EACH | 3 | $1,000.00 | $500.00 | $100.00 | $400.00 | $500.00 | $295.00 |
| 7 | Stripe removal (0225-0154000F) | LF | 750 | $2.50 | $2.50 | $2.50 | $2.50 | $2.50 | $2.60 |
| 8 | Sediment barrier, type 3 (0280-0115030F) | LF | 373 | $5.50 | $3.00 | $9.00 | $5.00 | $5.50 | $4.00 |
| 9 | Loose riprap, class 50 (0390-0105000K) | CY | 94 | $170.00 | $83.00 | $115.00 | $200.00 | $180.00 | $180.00 |
| 10 | Temporary barrier (0226-0126100F) | LF | 114 | $30.00 | $30.00 | $30.00 | $30.00 | $20.00 | $32.00 |
| 11 | Bulk asbestos sampling, analytical testing, and reporting (0295-0500000A) | LS | 1 | $2,000.00 | $5,000.00 | $1,500.00 | $10,000 | $5,000.00 | $3,950.00 |
| 12 | Subgrade geotextile (0350-0105000J) | SY | 1,180 | $2.30 | $2.00 | $1.00 | $1.25 | $2.50 | $2.25 |
| 13 | Pavement bar, type B-HS (0867-0145100J) | SF | 50 | $25.00 | $25.00 | $25.00 | $25.00 | $18.00 | $25.75 |
| 14 | Delineators, type 4 alternate 2 (0840-0104200E) | EACH | 8 | $45.00 | $65.00 | $45.00 | $46.00 | $45.00 | $115.00 |
| 15 | Asphalt pavement sawcutting, 6 inches deep (0310-0119100F) | LF | 360 | $2.50 | $8.00 | $10.00 | $6.50 | $6.00 | $7.95 |
| 16 | Compost erosion blanket (0280-0105100J) | SY | 80 | $25.00 | $20.00 | $30.00 | $3.75 | $40.00 | $28.00 |
| 17 | Contaminated soil disposal (0294-0200010M) | TON | 462 | $111.00 | $80.00 | $125.00 | $107.00 | $130.00 | $108.50 |
| 18 | Temporary plastic drums (0224-0145000E) | EACH | 24 | $45.00 | $40.00 | $50.00 | $45.00 | $45.00 | $75.00 |
| 19 | Reflective barrier panels (0226-0141100E) | EACH | 82 | $31.50 | $31.50 | $23.00 | $31.50 | $28.00 | $33.00 |
| 20 | Perforated steel square tube anchor sign supports (0930-0117000A) | LB | 235 | $5.11 | $7.45 | $6.38 | $5.11 | $5.11 | $8.30 |
| 21 | HI-build paint, extruded or sprayed, surface (0866-0125000F) | LF | 2,240 | $1.75 | $1.75 | $1.75 | $1.75 | $0.91 | $1.80 |
| 22 | Stone embankment (0330-0126000K) | CY | 90 | $145.00 | $90.00 | $80.00 | $100.00 | $142.00 | $108.00 |
| 23 | Portable traffic signal, MP 38.59 (0227-0158100A) | LS | 1 | $70,000 | $42,800 | $49,500 | $75,000 | $40,000 | $68,255 |
| 24 | Lead compliance plan (0294-0500000A) | LS | 1 | $2,000.00 | $5,000.00 | $100.00 | $1,500.00 | $5,000.00 | $1,450.00 |
| 25 | Portable changeable message signs (0222-0164000E) | EACH | 2 | $10,000 | $6,000.00 | $8,000.00 | $17,500 | $15,000 | $9,500.00 |
| 26 | Inlet protection, type 3 (0280-0114030E) | EACH | 4 | $150.00 | $45.00 | $85.00 | $55.00 | $115.00 | $195.00 |
| 27 | General structural concrete, class 3300 (0540-0301000A) | CY | 4 | $10,000 | $1,500.00 | $8,125.00 | $12,500 | $4,500.00 | $12,341 |
| 28 | Temporary barricades, type III (0224-0105000E) | EACH | 6 | $150.00 | $200.00 | $150.00 | $150.00 | $150.00 | $305.00 |
| 29 | Guardrail anchors, type 1 modified (0810-0120000E) | EACH | 1 | $1,100.00 | $1,100.00 | $1,100.00 | $1,100.00 | $1,100.00 | $1,200.00 |
| 30 | Sign support footings (0920-0100000A) | CY | 0.40 | $2,500.00 | $4,000.00 | $3,000.00 | $2,502.50 | $2,500.00 | $6,625.00 |
| 31 | Temporary striping (0225-0153000F) | LF | 750 | $1.50 | $1.50 | $1.50 | $1.50 | $1.50 | $1.60 |
| 32 | Midwest guardrail system, type 4 (0810-0146100F) | LF | 31.30 | $87.00 | $87.00 | $87.00 | $90.00 | $87.00 | $88.00 |
| 33 | Bridge removal work (0501-0100000A) | SF | 11,825 | $25.37 | $30.02 | $26.64 | $27.48 | $46.51 | $30.02 |
| 34 | Minimum deflection bridge temporary barrier (0226-0147000F) | LF | 780 | $70.00 | $70.00 | $67.50 | $67.75 | $25.00 | $68.50 |
| 35 | Repair temporary impact attenuator, narrow site system (0226-0141300E) | EACH | 5 | $2,000.00 | $1.00 | $1.00 | $2,000.00 | $100.00 | $1,500.00 |
| 36 | Clearing and grubbing (0320-0100000A) | ACRE | 0.15 | $66,667 | $200,000 | $66,667 | $100,000 | $166,667 | $84,580 |
| 37 | Vertical concrete parapet, 42 inch (0587-0115000A) | LF | 622.40 | $257.07 | $176.74 | $241.00 | $257.07 | $241.00 | $277.96 |
| 38 | Midwest guardrail system, type 3 (0810-0146100F) | LF | 37.50 | $67.00 | $67.00 | $67.00 | $68.00 | $67.00 | $68.00 |
| 39 | Temporary flexible pavement markers (0225-0149000E) | EACH | 100 | $4.00 | $2.00 | $2.00 | $3.00 | $5.00 | $4.25 |
| 40 | Pollution control plan (0290-0100000A) | LS | 1 | $2,000.00 | $120.00 | $100.00 | $3,000.00 | $2,500.00 | $2,250.00 |
| 41 | Flaggers (0223-0168000T) | HR | 500 | $75.00 | $85.00 | $75.00 | $75.00 | $75.00 | $75.00 |
| 42 | Removal of inlets (0310-0104000E) | EACH | 3 | $300.00 | $300.00 | $1,500.00 | $800.00 | $3,500.00 | $1,400.00 |
| 43 | Remove and reinstall existing signs (0905-0101000A) | LS | 1 | $850.00 | $500.00 | $850.00 | $851.00 | $850.00 | $1,855.00 |
| 44 | Signs, standard sheeting, sheet aluminum (0940-0202000J) | SF | 30 | $30.00 | $40.00 | $30.00 | $31.00 | $30.00 | $44.50 |
| 45 | Level 2, 1/2 inch ACP mixture (0744-0202000M) | TON | 560 | $200.00 | $195.00 | $185.00 | $184.00 | $184.00 | $188.00 |
| 46 | Bridge identification markers (0842-0401000E) | EACH | 2 | $200.00 | $350.00 | $200.00 | $201.00 | $200.00 | $420.00 |
| 47 | Flagger station lighting (0223-0168100E) | EACH | 3 | $700.00 | $100.00 | $500.00 | $1,850.00 | $1,500.00 | $1,800.00 |
| 48 | Remove existing signs (0905-0100000A) | LS | 1 | $300.00 | $500.00 | $300.00 | $301.00 | $300.00 | $1,200.00 |
| 49 | Guardrail transition (0810-0126000E) | EACH | 4 | $3,350.00 | $3,350.00 | $3,400.00 | $3,350.00 | $3,350.00 | $3,450.00 |
| 50 | Deck concrete, class HPC (IC) 4500 (0540-0203100A) | CY | 309 | $1,779.94 | $2,265.37 | $2,210.36 | $1,844.66 | $1,860.84 | $2,446.60 |
| 51 | Check dam, type 3 (0280-0106030E) | EACH | 2 | $200.00 | $250.00 | $200.00 | $60.00 | $90.00 | $175.00 |
| 52 | Cold plane pavement removal, 3 inches deep (0620-0122000J) | SY | 374 | $23.00 | $70.00 | $30.00 | $48.00 | $19.25 | $33.00 |
| 53 | General excavation (0330-0105000K) | CY | 920 | $45.00 | $68.00 | $38.00 | $60.00 | $17.00 | $49.00 |
| 54 | Temporary signs (0222-0102000J) | SF | 335 | $25.00 | $34.00 | $25.00 | $25.00 | $25.00 | $32.00 |
| 55 | Riprap geotextile, type 2 (0350-0104000J) | SY | 205 | $4.50 | $3.50 | $3.00 | $4.00 | $3.00 | $7.50 |
| 56 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $5,000.00 | $35,000 | $3,000.00 | $18,050 | $40,000 | $2,600.00 |
| 57 | Temporary pavement bars (0225-0153200J) | SF | 64 | $16.00 | $16.00 | $16.00 | $16.00 | $16.00 | $16.50 |
| 58 | Surface texturing (0540-0401000J) | SY | 1,222 | $7.50 | $6.50 | $7.00 | $7.00 | $6.25 | $9.50 |
| 59 | Reinforcement, ASTM A1035 CM grade 100 (0530-0104000A) | LB | 1 | $330,000 | $326,634 | $315,000 | $350,000 | $400,000 | $338,255 |
| 60 | Guardrail terminals, non-flared (0810-0129000E) | EACH | 3 | $3,200.00 | $3,200.00 | $3,200.00 | $3,200.00 | $3,200.00 | $3,300.00 |
| 61 | Temporary work access and containment (0253-0106000A) | LS | 1 | $260,000 | $180,000 | $220,000 | $200,000 | $275,000 | $225,000 |
| 62 | Bar removal (0225-0156000J) | SF | 64 | $18.00 | $18.00 | $20.00 | $18.00 | $18.00 | $18.50 |
| 63 | Extra for asphalt approaches (0749-0100000E) | EACH | 4 | $1,300.00 | $1,300.00 | $1,500.00 | $1,300.00 | $2,800.00 | $1,350.00 |
| 64 | Reinforcement, grade 60 (0530-0104000A) | LB | 4,261 | $7.04 | $1.78 | $4.11 | $2.35 | $2.35 | $10.56 |
| 65 | 24 inch subgrade stabilization (0331-0112000J) | SY | 1,256 | $69.00 | $6.25 | $40.00 | $95.00 | $63.00 | $95.00 |
| 66 | Work containment plan (0290-0102000A) | LS | 1 | $2,000.00 | $5,000.00 | $15,000 | $3,000.00 | $2,500.00 | $23,650 |
| 67 | Straw bale (0280-0119000E) | EACH | 6 | $81.00 | $30.00 | $250.00 | $15.00 | $45.00 | $70.00 |
| 68 | Moving temporary impact attenuators, narrow site system (0226-0137000E) | EACH | 2 | $1,500.00 | $1,000.00 | $1,000.00 | $1,000.00 | $500.00 | $1,200.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of December 11, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.