ODOT contract 15637 bid tabulation
Or8 at armco ave, main st and a&b row. Let by Oregon DOT on February 12, 2026, Region 1. 6 bids received.
- Owner
- Oregon DOT
- Letting
- 12 FEB 2026
- Pay items
- 114
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 | Rank 5 | Rank 6 |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Seeding mobilization (1030-0102000E) | EACH | 1 | $535.00 | $521.00 | $500.00 | $592.50 | $600.00 | $1,000.00 |
| 2 | Switching, conduit, and wiring (0970-0105000A) | LF | 420 | $76.19 | $85.71 | $71.43 | $84.11 | $83.33 | $71.43 |
| 3 | Construction entrance, type 1 (0280-0110010E) | EACH | 1 | $5,500.00 | $4,400.00 | $2,200.00 | $5,000.00 | $5,000.00 | $2,500.00 |
| 4 | Segregate and stockpile contaminated soil (0294-0600000A) | LS | 1 | $8,000.00 | $13,700 | $33,000 | $9,000.00 | $4,500.00 | $20,000 |
| 5 | Concrete manholes, shallow (0470-0105000E) | EACH | 2 | $9,300.00 | $6,400.00 | $4,200.00 | $8,400.00 | $9,500.00 | $6,500.00 |
| 6 | Subgrade geotextile (0350-0105000J) | SY | 963 | $1.50 | $6.75 | $2.00 | $3.00 | $1.25 | $1.00 |
| 7 | Bollards (0815-0100000E) | EACH | 1 | $1,725.00 | $770.00 | $1,000.00 | $3,400.00 | $2,500.00 | $1,200.00 |
| 8 | Contaminated soil disposal (0294-0200010M) | TON | 367 | $107.00 | $115.00 | $132.00 | $65.50 | $110.00 | $130.00 |
| 9 | Perforated steel square tube anchor sign supports (0930-0117000A) | LB | 279.80 | $8.06 | $16.44 | $12.51 | $10.45 | $14.30 | $14.30 |
| 10 | Straw bale (0280-0119000E) | EACH | 5 | $65.00 | $1.00 | $75.00 | $67.00 | $50.00 | $50.00 |
| 11 | Extra for asphalt slope paving (0749-0108000J) | SF | 190 | $17.00 | $198.00 | $20.00 | $14.25 | $17.00 | $30.00 |
| 12 | Wood sign posts (0910-0100000K) | FBM | 6.70 | $19.00 | $82.00 | $60.00 | $50.00 | $20.00 | $50.00 |
| 13 | Signs, standard sheeting, sheet aluminum (0940-0202000J) | SF | 46 | $32.00 | $20.00 | $44.00 | $35.00 | $35.00 | $30.00 |
| 14 | Multiple mailbox supports (1070-0101000E) | EACH | 2 | $1,350.00 | $626.00 | $2,000.00 | $900.00 | $1,300.00 | $1,200.00 |
| 15 | Bark mulch (1040-0190000K) | CY | 40 | $59.00 | $57.00 | $100.00 | $65.00 | $57.00 | $65.00 |
| 16 | Conifer trees, 2 FT height (1040-0110000E) | EACH | 11 | $32.25 | $31.00 | $80.00 | $36.00 | $32.00 | $33.00 |
| 17 | Concrete curbs, standard curb (0759-0110000F) | LF | 985 | $52.00 | $49.00 | $42.00 | $45.25 | $42.00 | $35.00 |
| 18 | Minor adjustment of manholes (0490-0120000E) | EACH | 5 | $3,500.00 | $1,600.00 | $1,500.00 | $1,500.00 | $1,700.00 | $1,000.00 |
| 19 | 12 inch storm sewer pipe, 5 FT depth (0445-035012AF) | LF | 21 | $350.00 | $188.00 | $250.00 | $155.00 | $425.00 | $170.00 |
| 20 | Temporary curb ramp, parallel (0228-0167670E) | EACH | 5 | $700.00 | $3,400.00 | $1,200.00 | $1,300.00 | $1,600.00 | $2,000.00 |
| 21 | Check dam, type 3 (0280-0106030E) | EACH | 17 | $125.00 | $78.00 | $75.00 | $125.00 | $72.00 | $100.00 |
| 22 | 18 inch subgrade stabilization (0331-0109000J) | SY | 35 | $112.00 | $143.00 | $95.00 | $60.00 | $75.00 | $50.00 |
| 23 | BI-directional yellow type iar markers (0855-0103100E) | EACH | 18 | $9.00 | $8.75 | $30.00 | $10.00 | $10.00 | $12.00 |
| 24 | Curb marking, paint (0869-0200000F) | LF | 35 | $8.50 | $8.25 | $20.00 | $9.50 | $10.00 | $12.00 |
| 25 | Sign support footings (0920-0100000A) | CY | 0.57 | $3,385.96 | $9,473.68 | $8,771.93 | $7,324.56 | $21,053 | $8,771.93 |
| 26 | Portable changeable message signs (0222-0164000E) | EACH | 4 | $6,500.00 | $4,200.00 | $1,600.00 | $2,340.75 | $12,500 | $5,000.00 |
| 27 | Moving existing hydrants (1160-0102000E) | EACH | 1 | $3,950.00 | $4,400.00 | $2,500.00 | $5,435.00 | $3,500.00 | $6,245.00 |
| 28 | Concrete washout facility (0280-0112500E) | EACH | 1 | $1,100.00 | $901.00 | $500.00 | $1,720.00 | $1,500.00 | $500.00 |
| 29 | Clearing and grubbing (0320-0100000A) | ACRE | 0.95 | $9,263.16 | $4,526.32 | $1,578.95 | $14,968 | $21,053 | $57,895 |
| 30 | Sediment barrier, type 3 (0280-0115030E) | EACH | 4 | $225.00 | $107.00 | $80.00 | $10.00 | $150.00 | $100.00 |
| 31 | Major adjustment of manholes (0490-0121000E) | EACH | 3 | $5,500.00 | $1,800.00 | $3,200.00 | $3,050.00 | $3,200.00 | $3,000.00 |
| 32 | Mono-directional white type iar markers (0855-0101100E) | EACH | 8 | $9.00 | $8.75 | $40.00 | $10.00 | $10.00 | $12.00 |
| 33 | Removal of electrical systems (0950-0101000A) | LS | 1 | $2,950.00 | $9,400.00 | $3,500.00 | $3,258.75 | $10,000 | $10,000 |
| 34 | Telecommunications, installation (0987-0110000A) | LS | 1 | $4,500.00 | $9,400.00 | $28,000 | $5,000.00 | $5,000.00 | $18,000 |
| 35 | 6 inch gate valve (1150-0100000E) | EACH | 1 | $1,850.00 | $1,850.00 | $3,800.00 | $1,855.00 | $1,700.00 | $3,000.00 |
| 36 | Sediment fence (0280-0113000F) | LF | 843 | $3.25 | $2.25 | $3.00 | $3.60 | $4.00 | $5.00 |
| 37 | Soil and groundwater sample collection and analytical testing (0294-0700000E) | EACH | 2 | $2,950.00 | $10,400 | $4,500.00 | $2,900.00 | $2,500.00 | $500.00 |
| 38 | General excavation (0330-0105000K) | CY | 930 | $100.00 | $11.00 | $85.00 | $75.00 | $100.00 | $80.00 |
| 39 | Concrete inlets, type G-2 (0470-0315000E) | EACH | 2 | $3,000.00 | $4,800.00 | $4,500.00 | $2,475.00 | $3,750.00 | $3,300.00 |
| 40 | Extra for inlets over existing sewers (0490-0123000E) | EACH | 4 | $350.00 | $937.00 | $23,000 | $1,700.00 | $1,800.00 | $6,000.00 |
| 41 | Truncated domes on new surfaces, curb ramp (0765-0100000J) | SF | 147 | $42.50 | $3.25 | $50.00 | $59.25 | $30.00 | $35.00 |
| 42 | Weed control (1030-0101000R) | ACRE | 1 | $6,500.00 | $6,300.00 | $800.00 | $7,110.00 | $6,200.00 | $6,500.00 |
| 43 | Soil testing (1040-0100000E) | EACH | 1 | $215.00 | $208.00 | $3,000.00 | $237.00 | $225.00 | $400.00 |
| 44 | Stripe removal (0225-0154000F) | LF | 2,125 | $1.30 | $1.25 | $2.00 | $1.42 | $1.50 | $1.00 |
| 45 | Contaminated groundwater removal (0294-0400000P) | GAL | 2,300 | $3.50 | $10.00 | $2.00 | $1.60 | $2.00 | $5.00 |
| 46 | Cold plane pavement removal, 2 inches deep (0620-0120000J) | SY | 1,089 | $13.50 | $21.00 | $37.00 | $19.00 | $19.00 | $20.00 |
| 47 | Concrete walks (0759-0128000J) | SF | 5,281 | $10.00 | $15.00 | $12.00 | $19.00 | $13.50 | $14.00 |
| 48 | 36 inch diameter signal support drilled shaft (0963-0101000F) | LF | 57 | $778.50 | $678.00 | $760.00 | $860.00 | $750.00 | $700.00 |
| 49 | Permanent seeding (1030-0108000R) | ACRE | 0.70 | $9,700.00 | $9,400.00 | $35,000 | $10,665 | $10,500 | $10,000 |
| 50 | Temporary signs (0222-0102000J) | SF | 720 | $25.00 | $24.00 | $15.00 | $17.50 | $26.00 | $20.00 |
| 51 | Flaggers (0223-0168000T) | HR | 144 | $88.00 | $41.00 | $90.00 | $79.00 | $82.00 | $85.00 |
| 52 | Temporary striping (0225-0153000F) | LF | 1,200 | $1.00 | $0.95 | $2.50 | $1.10 | $1.75 | $1.00 |
| 53 | Sloped end sections, 24 inch (0445-0700240E) | EACH | 1 | $381.00 | $385.00 | $2,500.00 | $1,250.00 | $2,000.00 | $1,000.00 |
| 54 | Adjusting boxes (0490-0100000E) | EACH | 8 | $450.00 | $385.00 | $850.00 | $500.00 | $125.00 | $200.00 |
| 55 | Soil conditioner (1040-0107000K) | CY | 22 | $32.25 | $31.00 | $77.00 | $36.00 | $32.00 | $33.00 |
| 56 | Deciduous trees, 2 FT height (1040-0130000E) | EACH | 55 | $21.50 | $21.00 | $40.00 | $24.00 | $22.00 | $23.00 |
| 57 | 6 inch ductile iron pipe with class B backfill (1140-0400000F) | LF | 20 | $275.00 | $322.00 | $310.00 | $365.00 | $325.00 | $240.00 |
| 58 | Contaminated groundwater mobilization (0294-0300000A) | LS | 1 | $1,350.00 | $5,200.00 | $2,500.00 | $1,500.00 | $5,000.00 | $4,000.00 |
| 59 | Inlet protection, type 10 (0280-0114100E) | EACH | 10 | $76.00 | $78.00 | $80.00 | $100.00 | $125.00 | $200.00 |
| 60 | Compost erosion blanket (0280-0105100J) | SY | 2,021 | $3.25 | $4.75 | $4.00 | $3.60 | $3.25 | $3.00 |
| 61 | Aggregate base (0640-0100000M) | TON | 1,085 | $51.00 | $46.00 | $80.00 | $50.00 | $80.00 | $75.00 |
| 62 | Mainline video with laser profile inspection (0415-0401000F) | LF | 469 | $13.00 | $5.25 | $15.00 | $9.50 | $20.00 | $7.00 |
| 63 | Concrete islands (0759-0122000J) | SF | 647 | $28.00 | $27.00 | $19.00 | $18.00 | $18.00 | $22.00 |
| 64 | Telecommunications, splicing and testing (0987-0120000A) | LS | 1 | $11,250 | $4,200.00 | $73,000 | $12,500 | $12,500 | $6,000.00 |
| 65 | Interconnect system (0990-0105000A) | LS | 1 | $28,500 | $30,200 | $4,400.00 | $31,350 | $30,000 | $12,000 |
| 66 | Sequential arrow signs (0222-0162000E) | EACH | 2 | $4,000.00 | $3,100.00 | $900.00 | $1,600.00 | $1,200.00 | $2,000.00 |
| 67 | Pedestrian channelizing devices (0228-0141600F) | LF | 500 | $26.00 | $21.00 | $24.00 | $32.00 | $36.00 | $30.00 |
| 68 | Plastic sheeting (0280-0101000J) | SY | 30 | $3.50 | $8.50 | $20.00 | $5.50 | $11.00 | $20.00 |
| 69 | Connection to existing structures (0490-0104000E) | EACH | 3 | $1,900.00 | $1,325.00 | $3,000.00 | $1,200.00 | $2,750.00 | $3,000.00 |
| 70 | Permanent surface mounted tubular markers (0856-0101000E) | EACH | 6 | $200.00 | $193.00 | $250.00 | $220.00 | $225.00 | $250.00 |
| 71 | Remove existing signs (0905-0100000A) | LS | 1 | $490.00 | $542.00 | $500.00 | $275.00 | $1,250.00 | $1,200.00 |
| 72 | Signs, wide angle sheeting, sheet aluminum (0940-0205100J) | SF | 38.50 | $38.00 | $24.00 | $50.00 | $42.00 | $38.00 | $60.00 |
| 73 | 16 foot X 72 inch chain link double gates (1050-0200000E) | EACH | 1 | $3,800.00 | $3,700.00 | $4,000.00 | $4,170.00 | $4,000.00 | $4,000.00 |
| 74 | Sediment barrier, type 8 (0280-0115080F) | LF | 520 | $7.50 | $7.25 | $9.00 | $8.30 | $7.50 | $10.00 |
| 75 | Health and safety plan (0294-0100000A) | LS | 1 | $630.00 | $1.00 | $500.00 | $3,555.00 | $2,000.00 | $1,000.00 |
| 76 | Traffic signal modification, SW baseline ST at SW main ST (0990-0102000A) | EACH | 1 | $290,000 | $344,000 | $4,400.00 | $320,000 | $325,000 | $336,500 |
| 77 | Extra for manholes over existing sewers (0490-0123000E) | EACH | 2 | $725.00 | $3,900.00 | $2,000.00 | $3,800.00 | $2,900.00 | $6,500.00 |
| 78 | Level 4, 1/2 inch ACP (0745-0402000M) | TON | 216 | $195.00 | $180.00 | $265.00 | $213.00 | $200.00 | $210.00 |
| 79 | Flashing beacon installation, OR8 at A&B row (0990-0106000A) | EACH | 1 | $75,850 | $80,800 | $12,000 | $83,700 | $80,000 | $90,000 |
| 80 | Topsoil (1040-0101000K) | CY | 43 | $50.00 | $48.00 | $85.00 | $55.00 | $50.00 | $60.00 |
| 81 | Inlet protection, type 3 (0280-0114030E) | EACH | 21 | $100.00 | $82.00 | $80.00 | $100.00 | $125.00 | $80.00 |
| 82 | Pollution control plan (0290-0100000A) | LS | 1 | $630.00 | $1,575.00 | $500.00 | $300.00 | $1,500.00 | $1,000.00 |
| 83 | Level 3, 1/2 inch ACP (0745-0302000M) | TON | 201 | $235.00 | $193.00 | $255.00 | $261.00 | $240.00 | $235.00 |
| 84 | Pavement legend, type B-HS: bicycle lane stencil (0867-0131000E) | EACH | 1 | $375.00 | $365.00 | $400.00 | $415.00 | $425.00 | $400.00 |
| 85 | Lighting poles and arms (0970-0200000A) | EACH | 3 | $3,450.00 | $1,866.67 | $3,333.33 | $3,811.75 | $4,000.00 | $2,033.33 |
| 86 | Shrubs, #1 container (1040-0153000E) | EACH | 332 | $5.50 | $5.25 | $16.00 | $6.00 | $6.00 | $5.00 |
| 87 | Pole foundations (0970-0100000A) | EACH | 3 | $1,133.33 | $1,200.00 | $1,166.67 | $1,244.25 | $1,333.33 | $1,333.33 |
| 88 | Concrete driveways (0759-0126000J) | SF | 2,914 | $14.00 | $21.00 | $16.00 | $21.50 | $19.00 | $17.00 |
| 89 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $25,000 | $19,200 | $10,000 | $27,450 | $50,000 | $70,000 |
| 90 | Ductile iron pipe tees, 6 inch (1140-0610000E) | EACH | 1 | $1,200.00 | $1,325.00 | $3,000.00 | $1,230.00 | $2,500.00 | $1,800.00 |
| 91 | Luminaires, lamps, and ballasts (0970-0104000A) | EACH | 3 | $661.67 | $625.00 | $833.33 | $730.75 | $833.33 | $766.67 |
| 92 | Storage pond, D01795 (1011-0100000A) | LS | 1 | $167,000 | $129,100 | $200,000 | $205,700 | $275,000 | $206,000 |
| 93 | 24 inch storm sewer pipe, 5 FT depth (0445-035024AF) | LF | 32 | $355.00 | $214.00 | $360.00 | $190.00 | $475.00 | $170.00 |
| 94 | Concrete inlets, type curb inlet manhole (0470-0313000E) | EACH | 3 | $8,900.00 | $4,800.00 | $6,400.00 | $11,900 | $8,000.00 | $4,500.00 |
| 95 | Temporary pavement bars (0225-0153200J) | SF | 320 | $5.00 | $5.00 | $4.00 | $5.65 | $7.00 | $5.00 |
| 96 | Flagger station lighting (0223-0168100E) | EACH | 4 | $1,000.00 | $2,600.00 | $550.00 | $1,185.00 | $5,000.00 | $2,200.00 |
| 97 | Inlet protection, type 4 (0280-0114040E) | EACH | 2 | $160.00 | $488.00 | $85.00 | $100.00 | $125.00 | $200.00 |
| 98 | PG 64-22 asphalt in level 3, 1/2 inch ACP (0745-0620000M) | TON | 12 | $1.00 | $1.00 | $20.00 | $2.00 | $1.00 | $50.00 |
| 99 | PG 70-22ER ashalt in level 4, 1/2 inch ACP (0745-0644100M) | TON | 13 | $1.00 | $1.00 | $20.00 | $2.00 | $1.00 | $50.00 |
| 100 | Remove and reinstall existing signs (0905-0101000A) | LS | 1 | $1,900.00 | $4,600.00 | $500.00 | $900.00 | $2,500.00 | $2,000.00 |
| 101 | Telecommunications, material (0987-0100000A) | LS | 1 | $4,350.00 | $9,400.00 | $270,000 | $4,800.00 | $4,000.00 | $6,000.00 |
| 102 | Wetland plants, plugs (1040-0183000E) | EACH | 23,418 | $0.45 | $0.40 | $1.50 | $0.40 | $0.45 | $0.50 |
| 103 | CL-6R chain link fence with vinyl clad fabric (1050-0135000F) | LF | 535 | $70.00 | $68.00 | $68.00 | $77.00 | $70.00 | $75.00 |
| 104 | Temporary plastic drums (0224-0145000E) | EACH | 155 | $64.00 | $42.00 | $35.00 | $50.00 | $70.00 | $70.00 |
| 105 | Temporary barricades, type III (0224-0105000E) | EACH | 13 | $230.00 | $156.00 | $155.00 | $200.00 | $275.00 | $150.00 |
| 106 | Asphalt pavement sawcutting, 12 inches deep (0310-0119100F) | LF | 1,860 | $4.50 | $1.50 | $5.00 | $3.60 | $6.00 | $12.00 |
| 107 | Facility field markers, type S2 (0842-0103001E) | EACH | 1 | $175.00 | $193.00 | $400.00 | $900.00 | $175.00 | $200.00 |
| 108 | Thermoplastic, extruded, surface, profiled (0865-0116600F) | LF | 5,775 | $2.30 | $2.25 | $2.50 | $2.55 | $2.60 | $3.00 |
| 109 | Pavement bar, type B-HS (0867-0145100J) | SF | 820 | $14.75 | $14.00 | $15.00 | $16.30 | $15.00 | $22.00 |
| 110 | Concrete inlets, type CG-2 (0470-0307000E) | EACH | 3 | $3,000.00 | $4,800.00 | $3,400.00 | $2,550.00 | $3,500.00 | $3,300.00 |
| 111 | Temporary barricades, type II (0224-0104000E) | EACH | 4 | $100.00 | $52.00 | $150.00 | $65.00 | $110.00 | $50.00 |
| 112 | Temporary traffic signal, SW baseline ST at SW main ST (0227-0158000A) | LS | 1 | $6,000.00 | $10,400 | $5,000.00 | $5,628.75 | $10,000 | $25,000 |
| 113 | Concrete curbs, curb and gutter (0759-0103000F) | LF | 371 | $65.00 | $64.00 | $72.00 | $61.00 | $70.00 | $70.00 |
| 114 | Extra for asphalt approaches (0749-0100000E) | EACH | 8 | $1,450.00 | $1,200.00 | $1,500.00 | $1,200.00 | $1,500.00 | $2,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of February 12, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.