ODOT contract 15664 bid tabulation
Or47 curb ramps (banks). Let by Oregon DOT on May 7, 2026, Region 2. 9 bids received.
- Owner
- Oregon DOT
- Letting
- 07 MAY 2026
- Pay items
- 57
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 | ||
| 7 | ||
| 8 | ||
| 9 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 | Rank 5 | Rank 6 |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Asphalt pavement sawcutting, less than 6 inches deep (0310-0119110F) | LF | 570 | $4.00 | $4.00 | $2.00 | $2.25 | $1.50 | $2.50 |
| 2 | Sign support footings (0920-0100000A) | CY | 1 | $2,000.00 | $2,500.00 | $3,300.00 | $2,275.00 | $2,784.00 | $2,300.00 |
| 3 | Pavement legend, type B-HS: arrows (0867-0103100E) | EACH | 7 | $500.00 | $600.00 | $450.00 | $500.00 | $540.00 | $525.00 |
| 4 | Pollution control plan (0290-0100000A) | LS | 1 | $800.00 | $2,500.00 | $1,200.00 | $465.00 | $500.00 | $5,000.00 |
| 5 | Temporary curb ramp, parallel (0228-0167670E) | EACH | 18 | $500.00 | $800.00 | $800.00 | $1,800.00 | $600.00 | $1,100.00 |
| 6 | Temporary traffic signal, main ST/oak way (0227-0158000A) | LS | 1 | $3,000.00 | $3,500.00 | $5,000.00 | $7,525.00 | $3,000.00 | $16,000 |
| 7 | Flaggers (0223-0168000T) | HR | 1,280 | $71.00 | $78.00 | $74.00 | $90.25 | $79.55 | $80.00 |
| 8 | Level 3, 1/2 inch ACP mixture (0744-0302000M) | TON | 271 | $160.00 | $230.00 | $160.00 | $181.25 | $188.00 | $190.00 |
| 9 | Clearing and grubbing (0320-0100000A) | ACRE | 1 | $2,500.00 | $2,500.00 | $5,300.00 | $9,050.00 | $7,800.00 | $12,000 |
| 10 | Bicycle channelizing devices (0228-0141950F) | LF | 460 | $15.00 | $10.00 | $30.00 | $100.00 | $35.00 | $100.00 |
| 11 | Lead compliance plan (0294-0500000A) | LS | 1 | $500.00 | $3,500.00 | $1,500.00 | $460.00 | $4,200.00 | $4,800.00 |
| 12 | Segregate and stockpile contaminated soil (0294-0600000A) | LS | 1 | $3,000.00 | $25,000 | $12,000 | $21,350 | $12,300 | $4,000.00 |
| 13 | Temporary barricades, type III (0224-0105000E) | EACH | 2 | $150.00 | $150.00 | $175.00 | $260.00 | $210.00 | $250.00 |
| 14 | Adjusting boxes (0490-0100000E) | EACH | 5 | $900.00 | $150.00 | $500.00 | $180.50 | $200.00 | $450.00 |
| 15 | General excavation (0330-0105000K) | CY | 606 | $45.00 | $50.00 | $68.00 | $70.00 | $53.00 | $45.00 |
| 16 | Concrete inlets, type G-2 (0470-0315000E) | EACH | 1 | $3,800.00 | $4,500.00 | $5,000.00 | $4,500.00 | $3,300.00 | $4,650.00 |
| 17 | Pavement bar, type B-HS (0867-0145100J) | SF | 850 | $18.00 | $22.00 | $16.50 | $19.00 | $19.80 | $19.00 |
| 18 | 10 inch storm sewer pipe, 10 FT depth (0445-035010BF) | LF | 14 | $425.00 | $225.00 | $190.00 | $275.00 | $200.00 | $170.00 |
| 19 | Concrete inlets, type CG-3 (0470-0309000E) | EACH | 3 | $3,800.00 | $4,800.00 | $4,500.00 | $4,500.00 | $5,000.00 | $5,500.00 |
| 20 | Minor adjustment of manholes (0490-0120000E) | EACH | 2 | $1,400.00 | $1,000.00 | $1,500.00 | $2,400.00 | $2,500.00 | $1,700.00 |
| 21 | Concrete walks (0759-0128000J) | SF | 6,476 | $19.00 | $15.00 | $10.00 | $20.00 | $15.50 | $19.00 |
| 22 | Pedestrian channelizing devices (0228-0141600F) | LF | 500 | $15.00 | $10.00 | $22.00 | $21.00 | $35.00 | $34.00 |
| 23 | Traffic signal modification, OR47/oak way (0990-0102000A) | EACH | 1 | $70,000 | $58,500 | $76,100 | $98,450 | $91,320 | $90,000 |
| 24 | Temporary barricades, type II (0224-0104000E) | EACH | 20 | $95.00 | $50.00 | $65.00 | $135.00 | $78.00 | $85.00 |
| 25 | Lawn seeding (1030-0138000J) | SY | 100 | $18.00 | $5.00 | $30.00 | $3.50 | $36.00 | $35.00 |
| 26 | Crosswalk closure supports (0902-0101000E) | EACH | 1 | $1,500.00 | $1,200.00 | $2,000.00 | $1,125.00 | $2,640.00 | $1,500.00 |
| 27 | Perforated steel square tube anchor sign supports (0930-0117000A) | LB | 185 | $10.81 | $13.51 | $14.59 | $23.24 | $15.96 | $20.54 |
| 28 | Topsoil (1040-0101000K) | CY | 5 | $250.00 | $100.00 | $425.00 | $81.00 | $510.00 | $500.00 |
| 29 | Curb marking, paint (0869-0200000F) | LF | 130 | $12.00 | $10.00 | $5.00 | $5.50 | $6.00 | $5.50 |
| 30 | Soil sample collection and analytical testing (0294-0700000E) | EACH | 20 | $700.00 | $500.00 | $3,034.00 | $2,315.00 | $1,200.00 | $350.00 |
| 31 | Contaminated soil disposal (0294-0200010M) | TON | 859 | $88.00 | $100.00 | $93.00 | $160.00 | $138.00 | $110.00 |
| 32 | Concrete curbs, curb and gutter (0759-0103000F) | LF | 852 | $70.00 | $45.00 | $55.00 | $50.75 | $57.75 | $72.00 |
| 33 | Plain concrete pavement, undoweled, 7 inches thick (0756-0102000J) | SY | 26 | $200.00 | $200.00 | $160.00 | $240.00 | $296.00 | $210.00 |
| 34 | Cold plane pavement removal, 4 inches deep (0620-0123000J) | SY | 658 | $32.00 | $70.00 | $27.00 | $31.50 | $33.00 | $33.00 |
| 35 | Irrigation system (1120-0100000A) | LS | 1 | $1.00 | $3,200.00 | $3,500.00 | $3,500.00 | $4,200.00 | $4,000.00 |
| 36 | Temporary plastic drums (0224-0145000E) | EACH | 13 | $65.00 | $75.00 | $20.00 | $115.00 | $10.00 | $70.00 |
| 37 | Asphalt pavement sawcutting, 6 to 14 inches deep (0310-0119120F) | LF | 1,028 | $7.00 | $8.00 | $5.00 | $3.00 | $4.25 | $4.50 |
| 38 | Reconnecting existing water services, 1 inch (1170-0105000E) | EACH | 1 | $4,000.00 | $1,500.00 | $1,500.00 | $500.00 | $6,000.00 | $1,400.00 |
| 39 | Concrete storm sewer manholes (0470-0101000E) | EACH | 2 | $7,000.00 | $7,500.00 | $8,000.00 | $6,750.00 | $9,800.00 | $8,500.00 |
| 40 | Temporary curb ramp, perpendicular (0228-0167670E) | EACH | 2 | $700.00 | $500.00 | $300.00 | $1,350.00 | $600.00 | $590.00 |
| 41 | Adjusting inlets (0490-0105000E) | EACH | 4 | $1,800.00 | $500.00 | $1,500.00 | $2,050.00 | $1,975.00 | $3,000.00 |
| 42 | Concrete sawcutting, less than 6 inches deep (0310-0119210F) | LF | 244 | $10.00 | $4.00 | $6.00 | $3.00 | $3.25 | $4.00 |
| 43 | Remove and reinstall existing signs (0905-0101000A) | LS | 1 | $1,500.00 | $3,500.00 | $1,100.00 | $1,575.00 | $3,840.00 | $650.00 |
| 44 | Inlet protection, type 7 (0280-0114070E) | EACH | 25 | $88.00 | $50.00 | $100.00 | $110.00 | $100.00 | $275.00 |
| 45 | Concrete sawcutting, 6 to 14 inches deep (0310-0119220F) | LF | 86 | $12.00 | $10.00 | $10.00 | $3.50 | $17.00 | $8.00 |
| 46 | Remove and reinstall mailbox supports (1070-0103000E) | EACH | 5 | $1,600.00 | $500.00 | $800.00 | $375.00 | $600.00 | $600.00 |
| 47 | Concrete curbs, standard curb (0759-0110000F) | LF | 333 | $48.00 | $30.00 | $42.00 | $45.50 | $35.00 | $62.00 |
| 48 | Temporary signs (0222-0102000J) | SF | 650 | $13.00 | $10.00 | $25.00 | $27.75 | $22.25 | $17.00 |
| 49 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $4,000.00 | $8,500.00 | $5,000.00 | $8,650.00 | $14,000 | $6,000.00 |
| 50 | Aggregate base (0640-0100000M) | TON | 336 | $65.00 | $60.00 | $71.25 | $73.50 | $50.00 | $72.00 |
| 51 | Removal of surfacings for curb ramp construction (0310-0106101J) | SY | 1,004 | $10.00 | $56.00 | $18.00 | $20.00 | $26.00 | $12.00 |
| 52 | Truncated domes on new surfaces, curb ramp (0765-0100000J) | SF | 329 | $45.00 | $40.00 | $30.00 | $37.75 | $42.00 | $34.00 |
| 53 | Bark mulch (1040-0190000K) | CY | 5 | $250.00 | $100.00 | $425.00 | $92.50 | $510.00 | $500.00 |
| 54 | Thermoplastic, extruded, surface, profiled (0865-0116600F) | LF | 150 | $18.00 | $10.00 | $15.00 | $17.50 | $18.00 | $17.00 |
| 55 | Remove existing signs (0905-0100000A) | LS | 1 | $515.00 | $1,500.00 | $700.00 | $2,875.00 | $12.00 | $425.00 |
| 56 | Pavement legend, type B-HS: bicycle lane stencil (0867-0131000E) | EACH | 2 | $500.00 | $450.00 | $415.00 | $450.00 | $480.00 | $470.00 |
| 57 | Concrete inlets, type CG-2 (0470-0307000E) | EACH | 2 | $3,500.00 | $4,500.00 | $4,850.00 | $4,500.00 | $5,000.00 | $4,700.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of May 7, 2026. Compiled by Mirage Metrics.