ODOT contract 15670 bid tabulation
I-84: bridges over north spruce street (la grande). Let by Oregon DOT on June 11, 2026, Region 5. 6 bids received.
- Owner
- Oregon DOT
- Letting
- 11 JUN 2026
- Pay items
- 121
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 | Rank 5 | Rank 6 |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Precompressed foam silicone joint seal (0585-0215000A) | LF | 84 | $119.05 | $130.95 | $95.24 | $63.21 | $113.56 | $178.57 |
| 2 | Drainage geotextile, type 2 (0350-0101000J) | SY | 1,400 | $4.00 | $2.15 | $6.00 | $1.30 | $2.00 | $2.00 |
| 3 | Asphaltic plug joint seals (0585-0200100A) | LF | 118.30 | $194.42 | $194.42 | $338.12 | $284.02 | $179.46 | $253.59 |
| 4 | Cold plane pavement removal, 2 inches deep (0620-0120000J) | SY | 9,300 | $5.00 | $3.50 | $4.00 | $2.50 | $3.75 | $4.00 |
| 5 | Level 3, 1/2 inch lime treated ACP (0745-0322000M) | TON | 6,000 | $160.00 | $142.00 | $132.00 | $160.00 | $137.00 | $132.00 |
| 6 | Precompressed foam silicone joint seal (0585-0215000A) | LF | 84 | $119.05 | $119.05 | $95.24 | $63.21 | $113.56 | $178.57 |
| 7 | Type "F" concrete rail, 42 inch, modified (0587-0126000A) | LF | 306 | $375.82 | $457.52 | $114.38 | $392.16 | $445.77 | $326.80 |
| 8 | Removal of surfacings (0310-0103000J) | SY | 160 | $20.00 | $28.00 | $20.00 | $10.44 | $20.00 | $40.00 |
| 9 | Temporary barricades, type II (0224-0104000E) | EACH | 6 | $200.00 | $85.00 | $40.00 | $12.55 | $100.00 | $75.00 |
| 10 | Constructing elastomeric concrete nosing (0584-0104000J) | SF | 103.80 | $106.00 | $107.00 | $100.00 | $120.00 | $106.16 | $110.00 |
| 11 | Bridge removal work (0501-0100000A) | SF | 2,847.30 | $10.54 | $17.56 | $35.12 | $49.17 | $25.82 | $87.80 |
| 12 | Structure excavation (0510-0101000A) | CY | 214.50 | $69.93 | $93.24 | $209.79 | $54.08 | $93.12 | $46.62 |
| 13 | 22 inch subgrade stabilization (0331-0112000J) | SY | 50 | $70.00 | $110.00 | $60.00 | $85.00 | $60.00 | $60.00 |
| 14 | Replace surface mounted tubular markers (0224-0143000E) | EACH | 40 | $100.00 | $125.00 | $80.00 | $150.00 | $165.00 | $115.00 |
| 15 | Temporary plastic drums (0224-0145000E) | EACH | 500 | $10.00 | $25.00 | $55.00 | $30.00 | $40.00 | $55.00 |
| 16 | Concrete sawcutting, 6 to 14 inches deep (0310-0119220F) | LF | 340 | $17.00 | $12.00 | $7.00 | $14.00 | $7.75 | $11.00 |
| 17 | Temporary impact attenuator, truck mounted (0226-0138000E) | EACH | 2 | $15,000 | $30,000 | $5,000.00 | $25,400 | $20,000 | $15,000 |
| 18 | Temporary bridge connections (0226-0119000E) | EACH | 1 | $1,000.00 | $2,000.00 | $2,000.00 | $550.00 | $400.00 | $2,000.00 |
| 19 | Permanent seeding (1030-0108000R) | ACRE | 1 | $3,613.00 | $4,500.00 | $5,000.00 | $3,950.00 | $5,400.00 | $5,400.00 |
| 20 | Stripe removal (0225-0154000F) | LF | 92,250 | $0.25 | $0.34 | $0.34 | $0.35 | $0.44 | $0.34 |
| 21 | Concrete repair (0542-0102001J) | SF | 16.70 | $500.00 | $900.00 | $220.00 | $250.00 | $500.00 | $375.00 |
| 22 | 16 inch ductile iron pipe, 5 FT depth (0445-060016AF) | LF | 130 | $105.00 | $190.00 | $130.00 | $200.00 | $130.00 | $130.00 |
| 23 | Crack sealing (0746-0100000F) | LF | 410 | $5.00 | $4.68 | $65.00 | $21.20 | $10.00 | $5.00 |
| 24 | Class 2 preparation (0504-0100000J) | SY | 100.70 | $0.01 | $260.00 | $500.00 | $430.00 | $500.00 | $350.00 |
| 25 | Delineators, type 1 (0840-0100000E) | EACH | 8 | $100.00 | $85.00 | $100.00 | $220.00 | $85.00 | $85.00 |
| 26 | Temporary work access and containment (0253-0106000A) | LS | 1 | $35,000 | $25,000 | $95,000 | $500.00 | $9,500.00 | $125,000 |
| 27 | Reinforced concrete bridge approach slabs (0545-0100100J) | SY | 254.60 | $625.00 | $665.00 | $800.00 | $550.00 | $663.12 | $700.00 |
| 28 | Erosion and sediment control manager (0280-0110000A) | LS | 1 | $0.01 | $3,800.00 | $50,000 | $20,000 | $4,500.00 | $15,000 |
| 29 | Permanent surface mounted tubular markers (0856-0101000E) | EACH | 21 | $225.00 | $225.00 | $150.00 | $250.00 | $225.00 | $200.00 |
| 30 | Guardrail transition (0810-0126000E) | EACH | 10 | $4,000.00 | $3,000.00 | $3,000.00 | $3,280.00 | $4,975.00 | $3,000.00 |
| 31 | PG 64-28 asphalt in level 3, 1/2 inch lime treated ACP (0745-0622000M) | TON | 360 | $0.01 | $1.00 | $1.00 | $1.10 | $0.01 | $1.00 |
| 32 | Reconditioning existing roadway (0610-0103000A) | LS | 1 | $4,000.00 | $30,000 | $8,000.00 | $2,300.00 | $5,500.00 | $30,000 |
| 33 | Gap pattern rumble strips (0857-0101500L) | MI | 3 | $3,650.00 | $3,650.00 | $4,000.00 | $3,990.00 | $3,650.00 | $3,650.00 |
| 34 | Bridge identification markers (0842-0401000E) | EACH | 4 | $250.00 | $250.00 | $250.00 | $200.00 | $140.00 | $250.00 |
| 35 | 16 inch culvert pipe, 5 FT depth (0445-010015AF) | LF | 530 | $95.00 | $110.00 | $70.00 | $120.00 | $70.00 | $70.00 |
| 36 | Ditch excavation (0330-0101000K) | CY | 140 | $47.00 | $51.00 | $30.00 | $56.00 | $30.00 | $30.00 |
| 37 | Inlet protection, type 3 (0280-0114030E) | EACH | 9 | $150.00 | $180.00 | $80.00 | $110.00 | $100.00 | $150.00 |
| 38 | Granular structure backfill (0510-0108000A) | CY | 66.90 | $119.58 | $298.95 | $672.65 | $83.41 | $209.54 | $149.48 |
| 39 | Selective hydrodemolition (0505-0101000J) | SY | 714 | $160.00 | $87.00 | $80.00 | $130.00 | $163.60 | $145.00 |
| 40 | Concrete deck micro-milling, 1 1/2 inch depth (0505-0100000J) | SY | 714 | $30.00 | $25.00 | $40.00 | $25.00 | $38.39 | $22.00 |
| 41 | Granular structure backfill (0510-0108000A) | CY | 66.90 | $119.58 | $298.95 | $672.65 | $70.70 | $298.95 | $149.48 |
| 42 | Impact attenuator, type barrels (0830-0115000E) | EACH | 3 | $1,500.00 | $5,500.00 | $1,200.00 | $9,740.00 | $4,000.00 | $1,000.00 |
| 43 | Continuously reinforced concrete pavement 12 inches thick (0755-0108000J) | SY | 560 | $530.00 | $420.00 | $30.00 | $675.00 | $634.00 | $700.00 |
| 44 | Selective hydrodemolition (0505-0101000J) | SY | 714 | $160.00 | $87.00 | $80.00 | $130.00 | $163.60 | $145.00 |
| 45 | Bridge approach sleeper slabs (0545-0100200F) | LF | 87 | $450.00 | $450.00 | $275.00 | $530.00 | $20.00 | $450.00 |
| 46 | Guardrail terminals, non-flared (0810-0129000E) | EACH | 10 | $4,000.00 | $3,500.00 | $3,500.00 | $3,390.00 | $3,475.00 | $3,500.00 |
| 47 | Temporary barricades, type III (0224-0105000E) | EACH | 9 | $250.00 | $200.00 | $200.00 | $86.00 | $180.00 | $200.00 |
| 48 | Repair temporary impact attenuator, narrow site system (0226-0141300E) | EACH | 1 | $0.01 | $1.00 | $1,000.00 | $3,280.00 | $3,000.00 | $3,000.00 |
| 49 | Constructing elastomeric concrete nosing (0584-0104000J) | SF | 103.80 | $106.00 | $107.00 | $100.00 | $120.00 | $106.16 | $110.00 |
| 50 | Paved culvert end slopes (0460-0100000J) | SF | 330 | $50.00 | $60.00 | $40.00 | $41.85 | $45.00 | $50.00 |
| 51 | Loose riprap, class 100 (0390-0108000K) | CY | 110 | $185.00 | $140.00 | $140.00 | $250.00 | $175.00 | $200.00 |
| 52 | Moving temporary impact attenuators, narrow site system (0226-0137000E) | EACH | 2 | $2,000.00 | $1,000.00 | $1,500.00 | $1,910.00 | $1,750.00 | $1,750.00 |
| 53 | Sequential arrow signs (0222-0162000E) | EACH | 2 | $5,000.00 | $8,000.00 | $3,000.00 | $3,000.00 | $3,000.00 | $5,000.00 |
| 54 | Aggregate base (0641-0102000M) | TON | 5,700 | $20.00 | $30.00 | $35.00 | $31.39 | $32.50 | $30.00 |
| 55 | Pedestrian channelizing devices (0228-0141600F) | LF | 30 | $60.00 | $20.00 | $60.00 | $22.25 | $40.00 | $30.00 |
| 56 | Bridge removal work (0501-0100000A) | SF | 15 | $666.67 | $1,666.67 | $1,000.00 | $200.00 | $2,567.40 | $1,333.33 |
| 57 | Cold plane pavement removal, 1 - 2 inches deep (0620-0111000J) | SY | 1,500 | $5.00 | $5.00 | $4.00 | $2.50 | $3.78 | $4.00 |
| 58 | Elastomeric concrete nosing material (0584-0103000C) | CF | 17.30 | $160.00 | $161.00 | $375.00 | $408.00 | $160.88 | $170.00 |
| 59 | Elastomeric concrete nosing material (0584-0103000C) | CF | 17.30 | $160.00 | $161.00 | $375.00 | $408.00 | $160.88 | $170.00 |
| 60 | Stone embankment (0330-0126000K) | CY | 5,500 | $20.00 | $41.00 | $40.00 | $50.00 | $47.00 | $38.00 |
| 61 | Bridge identification markers (0842-0401000E) | EACH | 2 | $250.00 | $250.00 | $250.00 | $200.00 | $140.00 | $250.00 |
| 62 | Structural concrete overlay material (0559-0300000K) | CY | 44.60 | $1,050.00 | $900.00 | $900.00 | $1,200.00 | $945.00 | $1,010.00 |
| 63 | Bridge identification markers (0842-0401000E) | EACH | 4 | $250.00 | $250.00 | $250.00 | $200.00 | $140.00 | $250.00 |
| 64 | Temporary guardrail transition (0226-0117000E) | EACH | 1 | $4,000.00 | $3,000.00 | $3,000.00 | $3,280.00 | $4,000.00 | $3,000.00 |
| 65 | Patch shallow rebar (1999-9Z90000E) | EACH | 4 | $1,000.00 | $150.00 | $60.00 | $610.00 | $1,100.00 | $200.00 |
| 66 | Construct structural concrete overlay (0559-0302000J) | SY | 714 | $70.00 | $74.00 | $80.00 | $75.00 | $76.88 | $70.00 |
| 67 | Type "F" concrete rail, 42 inch (0587-0126100A) | LF | 103 | $368.93 | $388.35 | $1,165.05 | $601.94 | $425.71 | $339.81 |
| 68 | General excavation (0330-0105000K) | CY | 2,000 | $36.00 | $28.00 | $20.00 | $34.00 | $25.00 | $17.50 |
| 69 | Remove asbestos material, friable (0295-0300000J) | SF | 10 | $100.00 | $640.00 | $800.00 | $55.00 | $1,645.00 | $3,000.00 |
| 70 | Temporary signs (0222-0102000J) | SF | 1,100 | $18.00 | $17.00 | $17.00 | $11.25 | $35.00 | $17.00 |
| 71 | Clearing and grubbing (0320-0100000A) | ACRE | 6.20 | $4,838.71 | $7,258.06 | $1,612.90 | $8,064.52 | $1,451.61 | $5,645.16 |
| 72 | Surface texturing (0540-0401000J) | SY | 889.50 | $8.00 | $5.70 | $5.62 | $7.50 | $5.75 | $8.00 |
| 73 | Concrete deck micro-milling, 1 1/2 inch depth (0505-0100000J) | SY | 714 | $30.00 | $25.00 | $40.00 | $25.00 | $38.39 | $22.00 |
| 74 | Concrete sawcutting, less than 6 inches deep (0310-0119210F) | LF | 120 | $12.00 | $11.00 | $4.50 | $7.00 | $5.25 | $5.00 |
| 75 | Plural component, sprayed, grooved (0866-0114000F) | LF | 62,000 | $0.98 | $0.98 | $1.00 | $1.00 | $1.08 | $0.98 |
| 76 | Repair temporary impact attenuator, truck mounted (0226-0141400E) | EACH | 1 | $0.01 | $1.00 | $1.00 | $270.00 | $1,000.00 | $2,200.00 |
| 77 | Emulsified asphalt in fog coat (0705-0101000M) | TON | 4.40 | $1,000.00 | $1,000.00 | $1,000.00 | $1,090.00 | $1,000.00 | $1,000.00 |
| 78 | Patch shallow rebar (1999-9Z90000E) | EACH | 4 | $1,000.00 | $150.00 | $60.00 | $610.00 | $1,100.00 | $200.00 |
| 79 | Bridge removal work (0501-0100000A) | SF | 15 | $666.67 | $1,666.67 | $1,000.00 | $222.67 | $1,666.67 | $1,333.33 |
| 80 | Portable changeable message signs (0222-0164000E) | EACH | 3 | $8,000.00 | $8,000.00 | $6,000.00 | $7,000.00 | $15,500 | $15,000 |
| 81 | Temporary delineators (0224-0147000E) | EACH | 100 | $80.00 | $75.00 | $100.00 | $65.00 | $85.00 | $85.00 |
| 82 | Temporary impact attenuator, narrow site system (0226-0134000E) | EACH | 2 | $8,000.00 | $2,000.00 | $8,000.00 | $4,100.00 | $3,750.00 | $3,750.00 |
| 83 | Surface texturing (0540-0401000J) | SY | 889.50 | $8.00 | $5.70 | $5.62 | $7.50 | $5.75 | $8.00 |
| 84 | Locate concrete repair (0542-0100000A) | LS | 1 | $2,000.00 | $1,500.00 | $3,000.00 | $1,550.00 | $4,500.00 | $2,500.00 |
| 85 | Sediment barrier, type 3 (0280-0115030F) | LF | 440 | $6.50 | $3.75 | $5.00 | $8.74 | $5.00 | $8.00 |
| 86 | Locate concrete repair (0542-0100000A) | LS | 1 | $2,000.00 | $1,500.00 | $3,000.00 | $1,550.00 | $1,200.00 | $2,500.00 |
| 87 | Reinforced concrete bridge approach slabs (0545-0100100J) | SY | 254.60 | $625.00 | $665.00 | $800.00 | $550.00 | $663.12 | $700.00 |
| 88 | Bridge protective splash board (1999-9Z90000F) | LF | 70 | $220.00 | $200.00 | $250.00 | $170.00 | $203.50 | $250.00 |
| 89 | Asphaltic plug joint seals (0585-0200100A) | LF | 118.30 | $194.42 | $194.42 | $338.12 | $284.02 | $179.46 | $253.59 |
| 90 | Continuously reinforced concrete pavement repair (0758-0100000J) | SY | 320 | $530.00 | $475.00 | $500.00 | $800.00 | $754.50 | $750.00 |
| 91 | Radar speed trailer (0222-0167500E) | EACH | 2 | $6,000.00 | $7,500.00 | $3,000.00 | $5,500.00 | $8,500.00 | $12,500 |
| 92 | Construct structural concrete overlay (0559-0302000J) | SY | 714 | $70.00 | $74.00 | $80.00 | $75.00 | $76.88 | $70.00 |
| 93 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $121,000 | $15,000 | $40,000 | $4,010.00 | $103,500 | $50,000 |
| 94 | Preparation of shoulders (0334-0100000A) | MI | 0.01 | $50,000 | $1,000,000 | $300,000 | $30,000 | $450,000 | $1,500,000 |
| 95 | Mainline video inspection (0415-0100000F) | LF | 660 | $8.00 | $6.00 | $10.00 | $14.70 | $5.00 | $10.00 |
| 96 | Type "F" concrete rail, 42 inch, modified (0587-0126000A) | LF | 306 | $375.82 | $457.52 | $114.38 | $392.16 | $445.77 | $326.80 |
| 97 | Asphalt pavement sawcutting, less than 6 inches deep (0310-0119110F) | LF | 410 | $3.00 | $6.00 | $2.10 | $2.30 | $3.25 | $3.00 |
| 98 | Concrete repair (0542-0102001J) | SF | 16.70 | $500.00 | $900.00 | $220.00 | $250.00 | $300.00 | $375.00 |
| 99 | Bridge protective splash board (1999-9Z90000F) | LF | 70 | $220.00 | $250.00 | $250.00 | $170.00 | $203.50 | $250.00 |
| 100 | Surface mounted tubular markers (0224-0142000E) | EACH | 400 | $100.00 | $105.00 | $80.00 | $120.00 | $115.00 | $115.00 |
| 101 | Temporary striping (0225-0153000F) | LF | 58,000 | $0.20 | $0.26 | $0.26 | $0.30 | $0.36 | $0.26 |
| 102 | Temporary barrier (0226-0126100F) | LF | 600 | $50.00 | $19.00 | $35.00 | $21.85 | $30.00 | $20.00 |
| 103 | Pollution control plan (0290-0100000A) | LS | 1 | $0.01 | $500.00 | $2,500.00 | $1,380.00 | $2,500.00 | $1,500.00 |
| 104 | Asphalt pavement sawcutting, 6 to 14 inches deep (0310-0119120F) | LF | 3,100 | $5.50 | $8.16 | $3.50 | $5.35 | $4.05 | $4.00 |
| 105 | Cold plane pavement removal, 5 inches deep (0620-0124000J) | SY | 240 | $15.00 | $10.00 | $10.00 | $12.00 | $7.00 | $8.00 |
| 106 | Removing and rebuilding fence (1050-0240000F) | LF | 96 | $100.00 | $35.00 | $85.00 | $100.00 | $90.00 | $100.00 |
| 107 | Midwest guardrail system, type 3 (0810-0146100F) | LF | 140 | $65.00 | $65.00 | $65.00 | $63.00 | $75.00 | $65.00 |
| 108 | Concrete pavement sawcut texturing (1999-9Z90000I) | SY | 560 | $15.00 | $5.75 | $5.62 | $8.00 | $5.75 | $8.00 |
| 109 | Terminal expansion joint sleeper slab (0755-0400000F) | LF | 96 | $575.00 | $450.00 | $450.00 | $585.00 | $731.50 | $750.00 |
| 110 | Bridge identification markers (0842-0401000E) | EACH | 2 | $250.00 | $250.00 | $250.00 | $200.00 | $140.00 | $250.00 |
| 111 | Type "F" concrete rail, 42 inch (0587-0126100A) | LF | 103 | $368.93 | $388.35 | $1,165.05 | $601.94 | $425.71 | $339.81 |
| 112 | Structural concrete overlay material (0559-0300000K) | CY | 44.60 | $1,050.00 | $900.00 | $900.00 | $1,200.00 | $945.00 | $1,010.00 |
| 113 | Temporary work access and containment (0253-0106000A) | LS | 1 | $35,000 | $30,000 | $95,000 | $6,860.00 | $9,500.00 | $125,000 |
| 114 | Remove and reinstall existing signs (0905-0101000A) | LS | 1 | $3,000.00 | $1,250.00 | $1,500.00 | $2,730.00 | $500.00 | $1,250.00 |
| 115 | Guardrail height conversion, type 2A (0810-0147000E) | EACH | 5 | $1,500.00 | $500.00 | $500.00 | $2,730.00 | $1,250.00 | $500.00 |
| 116 | Midwest guardrail system, type 2A (0810-0146100F) | LF | 1,700 | $32.00 | $25.00 | $25.00 | $32.25 | $40.00 | $25.00 |
| 117 | Terminal expansion joint (0755-0400000F) | LF | 96 | $325.00 | $150.00 | $500.00 | $110.00 | $98.33 | $200.00 |
| 118 | Flaggers (0223-0168000T) | HR | 160 | $90.00 | $96.00 | $90.00 | $95.00 | $95.00 | $75.00 |
| 119 | Bridge removal work (0501-0100000A) | SF | 2,847.30 | $10.54 | $17.56 | $35.12 | $49.17 | $25.82 | $87.80 |
| 120 | Structure excavation (0510-0101000A) | CY | 214.50 | $69.93 | $93.24 | $209.79 | $58.28 | $139.86 | $46.62 |
| 121 | Bridge approach sleeper slabs (0545-0100200F) | LF | 87 | $450.00 | $450.00 | $275.00 | $420.00 | $185.00 | $450.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of June 11, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.