ODOT contract 15671 bid tabulation
Us30by curb ramps, phase 2. Let by Oregon DOT on June 11, 2026, Region 1. 6 bids received.
- Owner
- Oregon DOT
- Letting
- 11 JUN 2026
- Pay items
- 111
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 | Rank 5 | Rank 6 |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Bark mulch (1040-0190000K) | CY | 70 | $298.00 | $60.00 | $65.00 | $200.00 | $60.00 | $75.00 |
| 2 | Weed control geotextile (1040-0208000J) | SF | 3,500 | $1.00 | $0.75 | $0.80 | $1.00 | $0.75 | $1.00 |
| 3 | 3 inch drain pipe (0430-0100030F) | LF | 16 | $200.00 | $280.00 | $59.00 | $60.00 | $65.00 | $123.00 |
| 4 | Mainline video inspection (0415-0100000F) | LF | 70 | $60.00 | $20.00 | $21.50 | $30.00 | $48.00 | $43.00 |
| 5 | Inlet protection, type 3 (0280-0114030E) | EACH | 134 | $58.00 | $100.00 | $75.00 | $50.00 | $125.00 | $38.00 |
| 6 | Concrete curbs, curb and gutter, modified (0759-0105000F) | LF | 650 | $111.00 | $62.00 | $98.00 | $80.00 | $78.00 | $60.50 |
| 7 | Traffic signal modification, northeast portland hwy. at 123AD conn., US30BY (MP 11.01)(portland) (0990-0102000A) | EACH | 1 | $18,000 | $16,000 | $16,000 | $20,000 | $20,000 | $22,500 |
| 8 | Traffic signal modification, northeast portland hwy. at N.E. 60TH ave., US30BY (MP 9.20) (portland) (0990-0102000A) | EACH | 1 | $40,000 | $36,600 | $36,300 | $40,000 | $36,000 | $55,000 |
| 9 | Traffic signal modification, northeast portland hwy. at N. buchanan ave., US30BY (MP 1.99)(portland) (0990-0102000A) | EACH | 1 | $30,000 | $36,000 | $32,000 | $35,000 | $35,000 | $37,500 |
| 10 | Sequential arrow signs (0222-0162000E) | EACH | 10 | $1,200.00 | $6,000.00 | $4,800.00 | $200.00 | $1,000.00 | $1,800.00 |
| 11 | Aggregate base (0640-0100000M) | TON | 4,200 | $50.00 | $105.00 | $44.25 | $45.00 | $32.00 | $32.50 |
| 12 | Concrete curbs, standard curb (0759-0110000F) | LF | 1,500 | $66.00 | $25.00 | $52.00 | $40.00 | $72.00 | $53.00 |
| 13 | Thermoplastic, extruded, surface, profiled (0865-0116600F) | LF | 2,850 | $6.00 | $5.25 | $5.50 | $5.25 | $7.00 | $6.25 |
| 14 | Triangular base breakaway sign supports (0930-0112000A) | LB | 272 | $11.03 | $14.71 | $15.81 | $18.38 | $22.06 | $16.54 |
| 15 | Traffic signal modification, northeast portland hwy. at N.E. 121ST PL., US30BY (MP 12.41)(portland) (0990-0102000A) | EACH | 1 | $13,000 | $13,000 | $8,400.00 | $11,000 | $12,000 | $18,000 |
| 16 | Removing and rebuilding fence (1050-0240000F) | LF | 15 | $250.00 | $130.00 | $110.00 | $150.00 | $125.00 | $275.00 |
| 17 | Temporary barricades, type II (0224-0104000E) | EACH | 65 | $50.00 | $60.00 | $55.00 | $200.00 | $75.00 | $40.00 |
| 18 | Health and safety plan (0294-0100000A) | LS | 1 | $1,000.00 | $2,000.00 | $320.00 | $1,000.00 | $2,500.00 | $1,500.00 |
| 19 | Level 3, 1/2 inch ACP mixture (0744-0302000M) | TON | 1,450 | $240.00 | $222.00 | $300.00 | $325.00 | $282.00 | $358.50 |
| 20 | Extra for pavement repair (0749-0109000J) | SF | 19,100 | $2.00 | $10.00 | $4.20 | $1.25 | $3.50 | $6.25 |
| 21 | Mono-directional white type iar markers (0855-0101100E) | EACH | 4 | $40.00 | $15.00 | $16.00 | $20.00 | $15.00 | $18.00 |
| 22 | Traffic signal modification, northeast portland hwy. at N.E. 11TH ave., US30BY (MP 6.56)(portland) (0990-0102000A) | EACH | 1 | $20,000 | $22,000 | $20,000 | $25,000 | $21,000 | $30,000 |
| 23 | Traffic signal modification, northeast portland hwy. at N.E. 138TH ave., US30BY (MP 13.25)(portland) (0990-0102000A) | EACH | 1 | $35,000 | $45,000 | $41,450 | $50,000 | $46,000 | $50,000 |
| 24 | Traffic signal modification, northeast portland hwy. at N.E. 162ND ave., US30BY (MP 14.52)(portland) (0990-0102000A) | EACH | 1 | $9,000.00 | $15,000 | $9,225.00 | $12,000 | $10,000 | $13,200 |
| 25 | Flaggers (0223-0168000T) | HR | 5,800 | $55.00 | $73.00 | $81.00 | $0.01 | $84.00 | $100.00 |
| 26 | Concrete inlets, type G-2 (0470-0315000E) | EACH | 10 | $3,600.00 | $3,300.00 | $3,750.00 | $6,000.00 | $4,150.00 | $5,295.00 |
| 27 | Cold plane pavement removal, 4 inches deep (0620-0123000J) | SY | 850 | $48.00 | $12.00 | $74.25 | $50.00 | $92.00 | $35.00 |
| 28 | Remove and reinstall existing signs (0905-0101000A) | LS | 1 | $6,000.00 | $5,500.00 | $6,000.00 | $8,000.00 | $7,000.00 | $13,190 |
| 29 | Traffic signal modification, northeast portland hwy. at N. ida ave., US30BY (MP 2.26)(portland) (0990-0102000A) | EACH | 1 | $59,000 | $50,000 | $50,000 | $60,000 | $50,000 | $74,200 |
| 30 | Traffic control supervisor (0223-0169000E) | EACH | 345 | $444.00 | $620.00 | $300.00 | $50.00 | $400.00 | $800.00 |
| 31 | Adjusting boxes (0490-0100000E) | EACH | 36 | $400.00 | $280.00 | $230.00 | $200.00 | $200.00 | $216.00 |
| 32 | Adjusting inlets (0490-0105000E) | EACH | 81 | $400.00 | $1,400.00 | $800.00 | $800.00 | $1,750.00 | $2,450.00 |
| 33 | Green bicycle lane, preformed thermoplastic film (0868-0100000J) | SF | 141 | $30.00 | $19.00 | $19.75 | $20.00 | $19.00 | $22.00 |
| 34 | Traffic signal modification, northeast portland hwy. at N.E. 60TH ave., US30BY (MP 9.20)(portland) (0990-0102000A) | EACH | 1 | $1.00 | $1.00 | $1.00 | $0.01 | $1.00 | $500.00 |
| 35 | Traffic signal modification, northeast portland hwy. at N. ivanhoe ST., US30BY (MP 1.32) (portland) (0990-0102000A) | EACH | 1 | $25,000 | $54,000 | $56,425 | $65,000 | $55,000 | $33,500 |
| 36 | Traffic signal modification, northeast portland hwy. at N. oswego ave., US30BY (MP 1.71)(portland) (0990-0102000A) | EACH | 1 | $23,000 | $30,000 | $24,000 | $30,000 | $25,000 | $3,200.00 |
| 37 | Remove and reinstall litter receptacles (1095-0104000E) | EACH | 1 | $1,000.00 | $800.00 | $550.00 | $1,500.00 | $1,500.00 | $1,775.00 |
| 38 | Traffic signal modification, northeast portland hwy. at N.E. 72ND ave., US30BY (MP 9.87)(portland) (0990-0102000A) | EACH | 1 | $15,000 | $20,000 | $16,550 | $20,000 | $20,000 | $22,000 |
| 39 | Temporary plastic drums (0224-0145000E) | EACH | 760 | $22.00 | $55.00 | $50.00 | $10.00 | $65.00 | $45.00 |
| 40 | Flagger station lighting (0223-0168100E) | EACH | 5 | $2,500.00 | $2,000.00 | $7,100.00 | $500.00 | $2,800.00 | $1,200.00 |
| 41 | Traffic signal modification, northeast portland hwy. at N.E. 89TH ave., US30BY (MP 10.72)(portland) (0990-0102000A) | EACH | 1 | $28,000 | $40,000 | $34,200 | $40,000 | $35,000 | $40,000 |
| 42 | Perforated steel square tube slip base sign supports (0930-0114000A) | LB | 1,080 | $11.11 | $18.15 | $19.58 | $21.30 | $18.52 | $13.43 |
| 43 | Pavement legend, type B-HS: bicycle lane stencil (0867-0131000E) | EACH | 20 | $450.00 | $450.00 | $450.00 | $500.00 | $425.00 | $510.00 |
| 44 | Drainage curbs (0480-0100000F) | LF | 16 | $70.00 | $60.00 | $49.00 | $125.00 | $75.00 | $49.00 |
| 45 | Concrete manholes, shallow (0470-0105000E) | EACH | 1 | $5,500.00 | $8,000.00 | $11,125 | $10,000 | $8,000.00 | $7,591.00 |
| 46 | Legend removal (0225-0155100J) | SF | 509 | $10.00 | $8.50 | $9.00 | $5.00 | $8.50 | $10.00 |
| 47 | Temporary barricades, type III (0224-0105000E) | EACH | 70 | $40.00 | $225.00 | $145.00 | $25.00 | $325.00 | $165.00 |
| 48 | Temporary walks (0228-0167680J) | SF | 720 | $200.00 | $19.00 | $12.50 | $13.00 | $9.00 | $18.50 |
| 49 | Clearing and grubbing (0320-0100000A) | ACRE | 0.50 | $110,000 | $139,912 | $116,000 | $30,000 | $40,000 | $7,214.00 |
| 50 | Extra for asphalt slope paving (0749-0108000J) | SF | 1,100 | $6.00 | $6.00 | $13.50 | $10.00 | $21.00 | $13.50 |
| 51 | BI-directional yellow type iar markers (0855-0103100E) | EACH | 10 | $25.00 | $15.00 | $16.00 | $20.00 | $15.00 | $18.00 |
| 52 | Traffic signal modification, northeast portland hwy. at N.E. 158TH ave., US30BY (MP 14.30)(portland) (0990-0102000A) | EACH | 1 | $10,000 | $7,000.00 | $6,600.00 | $10,000 | $8,000.00 | $14,300 |
| 53 | Traffic signal modification, northeast portland hwy. at N.E. martin luther king JR. BLVD., US30BY (6.15)(portland) (0990-0102000A) | EACH | 1 | $60,000 | $50,000 | $54,000 | $60,000 | $58,000 | $80,000 |
| 54 | Traffic signal modification, northeast portland hwy. at N.E. 82ND ave., US30BY (MP 10.37)(portland) (0990-0102000A) | EACH | 1 | $17,000 | $20,000 | $14,350 | $20,000 | $15,000 | $26,000 |
| 55 | Traffic signal modification, northeast portland hwy. at N.E. 112TH ave., US30BY (MP 11.95)(portland) (0990-0102000A) | EACH | 1 | $35,000 | $36,000 | $32,000 | $35,000 | $36,000 | $52,000 |
| 56 | Traffic signal modification, northeast portland hwy. at 123AF conn., US30BY (MP 12.51)(portland) (0990-0102000A) | EACH | 1 | $13,000 | $16,000 | $12,450 | $15,000 | $18,000 | $17,500 |
| 57 | Pavement legend, type B-HS: arrows (0867-0103100E) | EACH | 8 | $450.00 | $220.00 | $450.00 | $500.00 | $425.00 | $510.00 |
| 58 | Concrete islands (0759-0122000J) | SF | 390 | $49.00 | $13.00 | $25.00 | $15.00 | $25.00 | $88.00 |
| 59 | Concrete curbs, curb and gutter (0759-0103000F) | LF | 6,700 | $69.00 | $36.00 | $65.00 | $50.00 | $75.00 | $63.25 |
| 60 | Inlet protection, type 10 (0280-0114100E) | EACH | 6 | $100.00 | $125.00 | $65.00 | $50.00 | $125.00 | $57.00 |
| 61 | Stripe removal (0225-0154000F) | LF | 1,112 | $2.00 | $1.55 | $1.75 | $1.50 | $3.25 | $2.00 |
| 62 | Pavement legend, type B-HS: pbot bike loop legend (0867-0174000E) | EACH | 5 | $300.00 | $300.00 | $325.00 | $400.00 | $300.00 | $360.00 |
| 63 | Traffic signal modification, northeast portland hwy. at N. hodge ave., US30BY (MP 3.16)(portland) (0990-0102000A) | EACH | 1 | $18,000 | $17,000 | $17,200 | $20,000 | $22,000 | $22,200 |
| 64 | Asphalt pavement sawcutting, 6 to 14 inches deep (0310-0119120F) | LF | 10,300 | $4.00 | $3.50 | $3.75 | $3.00 | $9.50 | $9.50 |
| 65 | Removal of surfacings for curb ramp construction (0310-0106101J) | SY | 13,000 | $36.00 | $38.00 | $27.50 | $5.00 | $30.00 | $17.00 |
| 66 | Repair temporary impact attenuator, truck mounted (0226-0141400E) | EACH | 3 | $1.00 | $100.00 | $1,500.00 | $0.01 | $3,000.00 | $3,600.00 |
| 67 | Temporary signs (0222-0102000J) | SF | 3,500 | $7.00 | $16.50 | $16.50 | $17.00 | $16.50 | $6.00 |
| 68 | Temporary curb ramp, parallel (0228-0167670E) | EACH | 101 | $700.00 | $450.00 | $615.00 | $200.00 | $1,800.00 | $262.00 |
| 69 | Contaminated soil disposal (0294-0200010M) | TON | 500 | $80.00 | $100.00 | $160.00 | $25.00 | $142.00 | $132.00 |
| 70 | Concrete curbs, low profile mountable curb (0759-0106000F) | LF | 50 | $62.00 | $32.00 | $45.00 | $45.00 | $95.00 | $52.75 |
| 71 | Pipe breakaway sign supports (0930-0113000A) | LB | 1,150 | $5.22 | $16.30 | $17.61 | $19.13 | $17.39 | $7.13 |
| 72 | Traffic signal modification, northeast portland hwy. at N. richmond ave., US30BY (MP 1.52)(portland) (0990-0102000A) | EACH | 1 | $30,000 | $50,000 | $36,700 | $40,000 | $35,000 | $43,000 |
| 73 | Inlet protection, type 11 (0280-0114110E) | EACH | 11 | $90.00 | $85.00 | $140.00 | $50.00 | $125.00 | $65.00 |
| 74 | Remove existing signs (0905-0100000A) | LS | 1 | $5,000.00 | $300.00 | $325.00 | $1,000.00 | $2,000.00 | $9,353.00 |
| 75 | 12 inch ductile iron pipe, 5 FT depth (0445-060012AF) | LF | 10 | $400.00 | $280.00 | $330.00 | $700.00 | $375.00 | $357.00 |
| 76 | Traffic signal modification, northeast portland hwy. at N. wall ave., US30BY (MP 2.72)(portland) (0990-0102000A) | EACH | 1 | $45,000 | $45,000 | $43,500 | $50,000 | $45,000 | $59,000 |
| 77 | Traffic signal modification, northeast portland hwy. at N.E. 105TH ave., US30BY (MP 11.60)(portland) (0990-0102000A) | EACH | 1 | $17,000 | $20,000 | $16,000 | $20,000 | $20,000 | $26,000 |
| 78 | Temporary striping (0225-0153000F) | LF | 45 | $15.00 | $25.00 | $27.00 | $25.00 | $35.00 | $30.00 |
| 79 | Temporary impact attenuator, truck mounted (0226-0138000E) | EACH | 3 | $5,000.00 | $20,000 | $45,000 | $3,000.00 | $23,000 | $42,000 |
| 80 | Concrete sawcutting, less than 6 inches deep (0310-0119210F) | LF | 3,600 | $3.00 | $4.50 | $2.75 | $4.00 | $9.50 | $7.00 |
| 81 | Cold plane pavement removal, 2 inches deep (0620-0120000J) | SY | 200 | $44.00 | $54.00 | $74.25 | $50.00 | $256.00 | $74.00 |
| 82 | Traffic signal modification, northeast portland hwy. at N.E. 131ST PL., US30BY (MP 12.89)(portland) (0990-0102000A) | EACH | 1 | $2,300.00 | $5,000.00 | $1,400.00 | $3,000.00 | $3,000.00 | $4,000.00 |
| 83 | Plain concrete pavement repair (0754-0100000J) | SY | 50 | $333.00 | $380.00 | $170.00 | $300.00 | $375.00 | $300.00 |
| 84 | Topsoil (1040-0101000K) | CY | 200 | $298.00 | $48.00 | $52.00 | $140.00 | $50.00 | $60.00 |
| 85 | Railroad flagger services (0223-0170000E) | EACH | 45 | $1,000.00 | $1,500.00 | $1,650.00 | $200.00 | $2,000.00 | $2,300.00 |
| 86 | Bar removal (0225-0156000J) | SF | 7,121 | $10.00 | $8.25 | $9.00 | $5.00 | $10.50 | $10.00 |
| 87 | Segregate and stockpile contaminated soil (0294-0600000A) | LS | 1 | $20,000 | $15,000 | $6,300.00 | $1,000.00 | $10,000 | $16,000 |
| 88 | Permanent surface mounted tubular markers (0856-0101000E) | EACH | 1 | $350.00 | $250.00 | $270.00 | $400.00 | $350.00 | $300.00 |
| 89 | Traffic signal modification, northeast portland hwy. at N. portsmouth ave., US30BY (MP 3.03)(portland) (0990-0102000A) | EACH | 1 | $60,000 | $60,000 | $53,550 | $60,000 | $50,000 | $80,750 |
| 90 | Pavement bar, type B-HS (0867-0145100J) | SF | 7,717 | $18.00 | $17.00 | $18.20 | $17.00 | $20.00 | $20.25 |
| 91 | Concrete inlets, type CG-3 (0470-0309000E) | EACH | 1 | $3,000.00 | $4,500.00 | $4,170.00 | $6,000.00 | $4,750.00 | $5,963.00 |
| 92 | Traffic signal modification, northeast portland hwy. at N.E. 102ND ave., US30BY (MP 11.45)(portland) (0990-0102000A) | EACH | 1 | $18,000 | $30,000 | $25,350 | $30,000 | $30,000 | $28,000 |
| 93 | Concrete walks (0759-0128000J) | SF | 58,000 | $14.00 | $9.00 | $15.75 | $15.00 | $20.00 | $19.00 |
| 94 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $40,000 | $23,000 | $28,700 | $920,000 | $65,000 | $285,000 |
| 95 | Concrete driveways (0759-0126000J) | SF | 900 | $16.00 | $18.00 | $23.00 | $25.00 | $24.00 | $36.00 |
| 96 | Sign support footings (0920-0100000A) | CY | 4.69 | $3,198.29 | $3,731.34 | $4,051.17 | $4,477.61 | $3,731.34 | $6,961.62 |
| 97 | 12 inch storm sewer pipe, 5 FT depth (0445-035012AF) | LF | 70 | $270.00 | $170.00 | $200.00 | $350.00 | $325.00 | $219.00 |
| 98 | Crosswalk closure supports (0902-0101000E) | EACH | 16 | $1,800.00 | $1,200.00 | $1,300.00 | $2,000.00 | $1,300.00 | $1,920.00 |
| 99 | Soil sample collection and analytical testing (0294-0700000E) | EACH | 13 | $2,000.00 | $3,200.00 | $1,775.00 | $200.00 | $1,750.00 | $1,200.00 |
| 100 | Pedestrian channelizing devices (0228-0141600F) | LF | 3,350 | $15.00 | $30.00 | $25.50 | $10.00 | $42.00 | $17.25 |
| 101 | Temporary pavement bars (0225-0153200J) | SF | 2,260 | $6.00 | $2.75 | $3.00 | $2.00 | $2.75 | $3.25 |
| 102 | Sediment barrier, type 3 (0280-0115030E) | EACH | 5 | $80.00 | $5.25 | $200.00 | $150.00 | $14.00 | $190.00 |
| 103 | Pollution control plan (0290-0100000A) | LS | 1 | $1,000.00 | $2,000.00 | $320.00 | $1,000.00 | $1,500.00 | $130.00 |
| 104 | Minor adjustment of manholes (0490-0120000E) | EACH | 14 | $800.00 | $1,200.00 | $2,900.00 | $2,000.00 | $2,000.00 | $398.00 |
| 105 | Perforated steel square tube anchor sign supports (0930-0117000A) | LB | 610 | $13.11 | $5.90 | $6.39 | $8.20 | $8.20 | $18.85 |
| 106 | Signs, standard sheeting, extruded aluminum (0940-0201000J) | SF | 15 | $88.00 | $35.00 | $38.00 | $50.00 | $40.00 | $72.00 |
| 107 | Traffic signal modification, northeast portland hwy. at N.E. columbia pkwy., US30BY (MP 10.65)(portland) (0990-0102000A) | EACH | 1 | $40,000 | $36,000 | $37,650 | $40,000 | $42,000 | $60,000 |
| 108 | Permanent seeding (1030-0108000R) | ACRE | 0.50 | $35,000 | $10,000 | $11,000 | $24,000 | $10,000 | $6,000.00 |
| 109 | Traffic signal modification, northeast portland hwy. at N.E. sandy BLVD., US30BY (MP 11.25)(portland) (0990-0102000A) | EACH | 1 | $24,000 | $30,598 | $27,500 | $30,000 | $32,000 | $36,000 |
| 110 | Truncated domes on new surfaces, curb ramp (0765-0100000J) | SF | 3,400 | $42.00 | $29.00 | $42.00 | $30.00 | $30.00 | $50.25 |
| 111 | Traffic signal modification, northeast portland hwy. at N.E. cully BLVD., US30BY (MP 9.64)(portland) (0990-0102000A) | EACH | 1 | $8,000.00 | $8,000.00 | $7,050.00 | $10,000 | $10,000 | $11,500 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of June 11, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.