ODOT contract 15674 bid tabulation
Nb highland dr to barnett rd. Let by Oregon DOT on June 25, 2026, Region 3. 6 bids received.
- Owner
- Oregon DOT
- Letting
- 25 JUN 2026
- Pay items
- 124
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 | Rank 5 | Rank 6 |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Wetland plants, plugs (1040-0183000E) | EACH | 800 | $3.00 | $0.50 | $0.50 | $0.50 | $10.00 | $0.50 |
| 2 | CL-6 chain link fence (1050-0135000F) | LF | 341 | $20.00 | $60.00 | $19.62 | $20.00 | $26.00 | $60.00 |
| 3 | Subgrade geotextile (0350-0105000J) | SY | 1,805 | $1.65 | $3.00 | $1.20 | $2.20 | $2.50 | $1.20 |
| 4 | 18 inch subgrade stabilization (0331-0109000J) | SY | 1,444 | $18.50 | $46.00 | $52.00 | $28.00 | $28.00 | $52.00 |
| 5 | Compost erosion blanket (0280-0105100J) | SY | 1,000 | $5.00 | $5.00 | $5.00 | $5.00 | $20.00 | $5.00 |
| 6 | Wood sign posts (0910-0100000K) | FBM | 316 | $16.00 | $25.00 | $14.25 | $14.25 | $26.00 | $25.00 |
| 7 | Water quality swale, D00455 (1012-0100000A) | LS | 1 | $30,000 | $20,000 | $26,000 | $35,950 | $27,000 | $24,150 |
| 8 | Pole foundations (0970-0100000A) | EACH | 3 | $3,333.33 | $1,666.67 | $2,833.33 | $2,833.33 | $2,833.33 | $1,816.67 |
| 9 | Concrete storm sewer manholes (0470-0101000E) | EACH | 1 | $8,500.00 | $10,000 | $5,550.00 | $9,000.00 | $9,000.00 | $5,550.00 |
| 10 | Bridge removal work (0501-0100000A) | SF | 1,476 | $57.59 | $50.81 | $67.07 | $57.59 | $57.59 | $41.67 |
| 11 | Sediment fence (0280-0113000F) | LF | 300 | $3.00 | $3.00 | $3.00 | $3.00 | $5.00 | $4.50 |
| 12 | Sidewalk mounted combination bridge rail (0587-0112000A) | LF | 164.20 | $730.82 | $365.41 | $406.21 | $487.21 | $621.19 | $1,218.03 |
| 13 | Concrete curbs, standard curb (0759-0110000F) | LF | 250 | $35.00 | $35.00 | $33.00 | $39.00 | $34.00 | $28.00 |
| 14 | Irrigation system (1120-0100000A) | LS | 1 | $25,000 | $30,000 | $28,000 | $28,000 | $32,000 | $28,000 |
| 15 | General structural concrete, class 4000 (0540-0302000A) | CY | 104 | $1,105.77 | $961.54 | $1,370.19 | $1,442.31 | $1,442.31 | $1,442.31 |
| 16 | Poured joint seal (0585-0206100A) | LF | 215 | $46.51 | $66.42 | $39.77 | $39.67 | $41.86 | $39.67 |
| 17 | Sign support footings (0920-0100000A) | CY | 1.20 | $2,916.67 | $2,500.00 | $2,375.00 | $2,375.00 | $8,166.67 | $2,208.33 |
| 18 | Switching, conduit, and wiring (0970-0105000A) | LF | 800 | $81.25 | $125.00 | $68.75 | $68.75 | $68.75 | $118.75 |
| 19 | Temporary striping (0225-0153000F) | LF | 3,021 | $1.65 | $1.65 | $1.65 | $1.65 | $3.00 | $1.65 |
| 20 | Furnish HP 12 X 74 steel piles (0520-0109000F) | LF | 81 | $120.00 | $106.00 | $182.00 | $127.00 | $127.00 | $100.00 |
| 21 | Temporary barricades, type III (0224-0105000E) | EACH | 5 | $175.00 | $200.00 | $185.00 | $185.00 | $185.00 | $200.00 |
| 22 | 54 inch diameter sign support drilled shaft foundation (0921-0401000F) | LF | 24 | $1,800.00 | $2,500.00 | $1,800.00 | $1,800.00 | $1,800.00 | $2,300.00 |
| 23 | Remove and reinstall existing signs (0905-0101000A) | LS | 1 | $800.00 | $300.00 | $700.00 | $700.00 | $5,200.00 | $300.00 |
| 24 | Concrete islands (0759-0122000J) | SF | 1,468 | $17.50 | $25.00 | $18.00 | $27.00 | $36.00 | $22.07 |
| 25 | Bar removal (0225-0156000J) | SF | 414 | $10.00 | $9.75 | $9.75 | $9.75 | $12.00 | $9.75 |
| 26 | Temporary impact attenuator, narrow site system (0226-0134000E) | EACH | 1 | $6,000.00 | $3,450.00 | $3,450.00 | $5,000.00 | $3,450.00 | $3,450.00 |
| 27 | Straw bale (0280-0119000E) | EACH | 4 | $50.00 | $90.00 | $50.00 | $50.00 | $45.00 | $100.00 |
| 28 | Asphalt pavement sawcutting, 6 to 14 inches deep (0310-0119120F) | LF | 965 | $6.00 | $3.50 | $3.50 | $3.50 | $4.50 | $7.00 |
| 29 | Concrete manholes, large precast (0470-0106000E) | EACH | 1 | $10,000 | $12,000 | $6,200.00 | $12,000 | $12,000 | $6,200.00 |
| 30 | Furnish HP 14 X 102 steel piles (0520-0113000F) | LF | 81 | $140.00 | $146.00 | $250.00 | $174.00 | $174.00 | $120.00 |
| 31 | PVC conduit system, 2 inch diameter (0583-0201000F) | LF | 170 | $14.00 | $70.00 | $12.00 | $12.00 | $13.00 | $60.00 |
| 32 | Bark mulch (1040-0190000K) | CY | 47 | $60.00 | $55.00 | $55.00 | $55.00 | $100.00 | $55.00 |
| 33 | Concrete curbs, curb and gutter (0759-0103000F) | LF | 852 | $40.00 | $40.00 | $37.00 | $43.00 | $42.00 | $36.17 |
| 34 | Bridge approach slab cold plane pavement removal, 2 inches deep (0503-0103100J) | SY | 92 | $30.00 | $60.00 | $30.00 | $52.00 | $52.00 | $30.00 |
| 35 | 14 inch HDPE pipe, 5 FT depth (0445-035015AF) | LF | 34 | $245.00 | $220.00 | $1.00 | $110.00 | $86.00 | $1.00 |
| 36 | Sediment barrier, type 9 (0280-0115090F) | LF | 450 | $6.00 | $9.00 | $7.50 | $5.50 | $11.00 | $5.50 |
| 37 | Flagger station lighting (0223-0168100E) | EACH | 4 | $800.00 | $5,500.00 | $1,600.00 | $2,500.00 | $8,760.00 | $2,500.00 |
| 38 | Portable changeable message signs (0222-0164000E) | EACH | 1 | $6,000.00 | $9,500.00 | $8,000.00 | $15,000 | $10,000 | $9,000.00 |
| 39 | Temporary signs (0222-0102000J) | SF | 280 | $35.00 | $30.00 | $30.00 | $30.00 | $30.00 | $280.00 |
| 40 | Temporary pavement bars (0225-0153200J) | SF | 70 | $6.50 | $6.50 | $6.50 | $6.50 | $14.00 | $6.50 |
| 41 | Detectable guide strips, blue (0765-0300000J) | SF | 105 | $136.00 | $65.00 | $136.00 | $136.00 | $136.00 | $136.00 |
| 42 | Signs, standard sheeting, plywood (0940-0203000J) | SF | 30 | $30.00 | $40.00 | $24.00 | $23.25 | $45.00 | $40.00 |
| 43 | Permanent seeding (1030-0108000R) | ACRE | 0.80 | $10,500 | $9,000.00 | $9,000.00 | $9,000.00 | $4,500.00 | $9,000.00 |
| 44 | Concrete sawcutting, less than 6 inches deep (0310-0119210F) | LF | 50 | $12.00 | $8.00 | $8.00 | $22.00 | $6.00 | $15.00 |
| 45 | Temporary work access and containment (0253-0106000A) | LS | 1 | $15,000 | $40,000 | $2,000.00 | $50,000 | $50,000 | $4,500.00 |
| 46 | Structure excavation (0510-0101000A) | CY | 193 | $77.72 | $51.81 | $102.85 | $119.17 | $119.17 | $259.07 |
| 47 | Green bicycle lane, preformed thermoplastic film (0868-0100000J) | SF | 257 | $19.00 | $18.75 | $19.00 | $18.75 | $38.00 | $18.75 |
| 48 | Signs, standard sheeting, extruded aluminum (0940-0201000J) | SF | 66 | $40.00 | $50.00 | $31.50 | $31.50 | $52.00 | $50.00 |
| 49 | Mono-directional white type iar markers (0855-0101100E) | EACH | 5 | $25.00 | $25.00 | $25.00 | $25.00 | $65.00 | $25.00 |
| 50 | Elastomeric concrete nosing material (0584-0103000C) | CF | 24 | $110.00 | $130.00 | $125.00 | $108.00 | $470.00 | $454.00 |
| 51 | Work containment plan (0290-0102000A) | LS | 1 | $500.00 | $5,000.00 | $500.00 | $26,500 | $20,000 | $2,500.00 |
| 52 | Reinforced pile tips (0520-0330000E) | EACH | 8 | $500.00 | $200.00 | $490.00 | $230.00 | $260.00 | $350.00 |
| 53 | Weed control geotextile (1040-0208000J) | SF | 1,942 | $0.50 | $0.50 | $0.50 | $0.50 | $0.60 | $0.50 |
| 54 | Temporary plastic drums (0224-0145000E) | EACH | 6 | $65.00 | $20.00 | $120.00 | $30.00 | $70.00 | $20.00 |
| 55 | Inlet protection, type 3 (0280-0114030E) | EACH | 11 | $200.00 | $120.00 | $22.00 | $75.00 | $110.00 | $250.00 |
| 56 | Matting, type C (0280-0105030J) | SY | 1,100 | $3.00 | $3.00 | $3.00 | $3.00 | $8.00 | $3.00 |
| 57 | Temporary barrier (0226-0126100F) | LF | 915 | $18.00 | $18.00 | $18.00 | $18.00 | $26.20 | $18.00 |
| 58 | Mainline video inspection (0415-0100000F) | LF | 116 | $20.00 | $15.00 | $20.00 | $28.00 | $27.00 | $20.00 |
| 59 | Shoring, cribbing, and cofferdams (0510-0100000A) | SY | 37 | $540.54 | $1,486.49 | $1,486.49 | $1,081.08 | $1,081.08 | $2,027.03 |
| 60 | Signs, wide angle sheeting, extruded aluminum (0940-0204100J) | SF | 138.80 | $40.00 | $60.00 | $39.00 | $39.00 | $65.00 | $59.98 |
| 61 | Temporary pavement legends (0225-0153100E) | EACH | 2 | $150.00 | $150.00 | $150.00 | $150.00 | $400.00 | $150.00 |
| 62 | Bridge identification markers (0842-0401000E) | EACH | 1 | $225.00 | $125.00 | $225.00 | $225.00 | $130.00 | $125.00 |
| 63 | Level 4, 1/2 inch ACP (0745-0402000M) | TON | 1,350 | $155.00 | $165.00 | $148.00 | $150.00 | $140.00 | $147.00 |
| 64 | Water quality seeding (1030-0118000R) | ACRE | 0.02 | $60,000 | $50,000 | $50,000 | $50,000 | $55,000 | $50,000 |
| 65 | Secondary sign mounts (0930-0110000A) | LB | 52.20 | $28.74 | $38.31 | $23.77 | $23.95 | $55.56 | $28.93 |
| 66 | Pavement legend, type B-HS: bicycle lane stencil (0867-0131000E) | EACH | 3 | $400.00 | $375.00 | $375.00 | $375.00 | $450.00 | $375.00 |
| 67 | Facility field markers, type S2 (0842-0103001E) | EACH | 2 | $150.00 | $125.00 | $150.00 | $150.00 | $140.00 | $125.00 |
| 68 | Wetland topsoil (1040-0106000K) | CY | 103 | $65.00 | $83.27 | $60.00 | $60.00 | $130.00 | $60.00 |
| 69 | Refurbishing and reinstalling existing illumination systems (0970-0106000A) | LS | 1 | $5,000.00 | $5,000.00 | $3,500.00 | $3,500.00 | $6,500.00 | $3,200.00 |
| 70 | Aggregate base (0641-0102000M) | TON | 2,311 | $37.50 | $43.00 | $45.00 | $32.00 | $32.00 | $45.00 |
| 71 | Cold plane pavement removal, 2 inches deep (0620-0120000J) | SY | 2,412 | $6.00 | $10.50 | $5.00 | $5.00 | $8.00 | $5.00 |
| 72 | Control joint (0585-0300000A) | LF | 25 | $200.00 | $200.00 | $172.80 | $174.00 | $240.00 | $209.40 |
| 73 | General excavation (0330-0105000K) | CY | 1,982 | $34.00 | $38.00 | $83.00 | $34.00 | $32.00 | $83.00 |
| 74 | Architectural treatment (0543-0100000J) | SY | 61 | $250.00 | $320.00 | $85.00 | $400.00 | $400.00 | $255.00 |
| 75 | Clearing and grubbing (0320-0100000A) | ACRE | 0.50 | $100,000 | $60,000 | $150,000 | $170,000 | $298,000 | $200,000 |
| 76 | Pedestrian channelizing devices (0228-0141600F) | LF | 51 | $30.00 | $30.00 | $17.50 | $17.50 | $45.00 | $30.00 |
| 77 | Repair temporary impact attenuator, truck mounted (0226-0141400E) | EACH | 2 | $1.00 | $500.00 | $2,000.00 | $2,000.00 | $600.00 | $2,500.00 |
| 78 | Flaggers (0223-0168000T) | HR | 260 | $70.00 | $70.00 | $87.00 | $78.00 | $81.00 | $90.00 |
| 79 | Minimum deflection bridge temporary barrier (0226-0147000F) | LF | 237.50 | $70.00 | $75.00 | $70.00 | $70.00 | $76.00 | $70.00 |
| 80 | Reinforcement, grade 60 (0530-0104000A) | LB | 8,686 | $2.30 | $3.45 | $1.73 | $2.88 | $2.99 | $2.88 |
| 81 | Furnish pile driving equipment (0520-0100000A) | LS | 1 | $25,000 | $25,000 | $75,000 | $32,500 | $34,000 | $50,000 |
| 82 | Concrete walks (0759-0128000J) | SF | 8,193 | $9.00 | $11.00 | $9.00 | $13.50 | $16.00 | $10.24 |
| 83 | Signs, standard sheeting, sheet aluminum (0940-0202000J) | SF | 43.10 | $30.00 | $30.00 | $26.00 | $30.00 | $40.00 | $29.93 |
| 84 | Shrubs, #2 container (1040-0154000E) | EACH | 80 | $12.50 | $12.00 | $12.00 | $12.00 | $80.00 | $12.00 |
| 85 | Repair temporary impact attenuator, narrow site system (0226-0141300E) | EACH | 2 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $300.00 | $1,000.00 |
| 86 | Extra for manholes over existing sewers (0490-0123000E) | EACH | 2 | $5,000.00 | $3,500.00 | $2,200.00 | $6,000.00 | $6,000.00 | $2,200.00 |
| 87 | Signs, wide angle sheeting, sheet aluminum (0940-0205100J) | SF | 15 | $37.54 | $35.00 | $32.00 | $32.00 | $40.00 | $35.00 |
| 88 | Vertical sign mounts on existing structures (0930-0109000A) | LB | 200 | $75.00 | $75.00 | $57.05 | $57.50 | $70.00 | $58.75 |
| 89 | Pavement bar, type B-HS (0867-0145100J) | SF | 1,204 | $18.00 | $17.75 | $17.75 | $17.75 | $20.00 | $17.75 |
| 90 | Bearing devices, 24 inch wide, 6 inch long, 1 inch thick (0582-0020000E) | EACH | 4 | $750.00 | $1,000.00 | $300.00 | $1,000.00 | $1,000.00 | $500.00 |
| 91 | Deck concrete, class HPC(IC)4500 (0540-0203100A) | CY | 55 | $2,636.36 | $2,818.18 | $3,181.82 | $2,909.09 | $2,963.64 | $3,636.36 |
| 92 | Granular structure backfill (0510-0108000A) | CY | 203 | $172.41 | $98.52 | $150.25 | $78.82 | $78.82 | $197.04 |
| 93 | Pollution control plan (0290-0100000A) | LS | 1 | $500.00 | $5,000.00 | $500.00 | $2,000.00 | $1,200.00 | $250.00 |
| 94 | Sequential arrow signs (0222-0162000E) | EACH | 4 | $400.00 | $2,000.00 | $2,000.00 | $7,500.00 | $2,300.00 | $3,600.00 |
| 95 | Structural concrete overlay material (0559-0300000K) | CY | 7 | $1,650.00 | $1,200.00 | $1,500.00 | $1,300.00 | $1,400.00 | $1,630.00 |
| 96 | Traffic signal modification, barnett RD at highland (0990-0102000A) | EACH | 1 | $265,000 | $220,000 | $255,000 | $255,000 | $260,000 | $215,000 |
| 97 | 6 foot X 48 inch chain link single gates (1050-0189000E) | EACH | 1 | $1,200.00 | $1,500.00 | $895.00 | $895.00 | $1,600.00 | $1,020.00 |
| 98 | Drive HP 14 X 102 steel piles (0520-0212000E) | EACH | 4 | $3,000.00 | $2,000.00 | $2,300.00 | $1,625.00 | $1,625.00 | $1,400.00 |
| 99 | Structural overlay removal (0504-0105000J) | SY | 111 | $60.00 | $55.00 | $430.00 | $52.00 | $52.00 | $229.41 |
| 100 | 12 inch ductile iron pipe, 5 FT depth (0445-060012AF) | LF | 116 | $265.00 | $170.00 | $150.00 | $223.00 | $180.00 | $150.00 |
| 101 | Legend removal (0225-0155100J) | SF | 278 | $10.00 | $9.75 | $9.75 | $9.75 | $12.00 | $9.75 |
| 102 | Temporary impact attenuator, truck mounted (0226-0138000E) | EACH | 1 | $15,000 | $10,000 | $7,000.00 | $6,000.00 | $36,000 | $5,000.00 |
| 103 | Triangular base breakaway sign supports (0930-0112000A) | LB | 481.20 | $10.39 | $10.39 | $8.39 | $8.39 | $18.50 | $9.14 |
| 104 | Surface texturing (0540-0401000J) | SY | 99 | $80.00 | $30.00 | $31.00 | $33.00 | $34.00 | $41.00 |
| 105 | Pavement legend, type B-HS: arrows (0867-0103100E) | EACH | 16 | $400.00 | $375.00 | $375.00 | $375.00 | $450.00 | $375.00 |
| 106 | Temporary barricades, type II (0224-0104000E) | EACH | 9 | $75.00 | $75.00 | $65.00 | $65.00 | $160.00 | $75.00 |
| 107 | Construction entrance, type 1 (0280-0110010E) | EACH | 2 | $2,200.00 | $2,500.00 | $4,700.00 | $2,500.00 | $3,800.00 | $4,700.00 |
| 108 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $12,000 | $15,000 | $11,600 | $85,000 | $38,000 | $50,000 |
| 109 | Drive HP 12 X 74 steel piles (0520-0208000E) | EACH | 4 | $3,000.00 | $2,000.00 | $1,890.00 | $1,625.00 | $1,625.00 | $1,400.00 |
| 110 | Deciduous trees, 2 inch caliper (1040-0130000E) | EACH | 5 | $165.00 | $160.00 | $160.00 | $160.00 | $875.00 | $160.00 |
| 111 | Remove existing signs (0905-0100000A) | LS | 1 | $800.00 | $500.00 | $800.00 | $800.00 | $6,000.00 | $500.00 |
| 112 | Thermoplastic, sprayed, surface, non-profiled (0865-0119600F) | LF | 5,760 | $2.50 | $2.25 | $2.25 | $2.25 | $4.00 | $2.25 |
| 113 | Permanent surface mounted tubular markers (0856-0101000E) | EACH | 3 | $225.00 | $225.00 | $225.00 | $225.00 | $160.00 | $225.00 |
| 114 | BT 60 precast prestressed girders (0550-0108200F) | LF | 206 | $1,000.00 | $720.00 | $970.00 | $715.00 | $725.00 | $1,000.00 |
| 115 | Reinforced concrete bridge approach slabs (0545-0100100J) | SY | 100 | $715.00 | $680.00 | $693.00 | $640.00 | $690.00 | $869.00 |
| 116 | Stripe removal (0225-0154000F) | LF | 4,979 | $1.15 | $1.15 | $1.15 | $1.15 | $2.00 | $1.15 |
| 117 | Interconnect system (0990-0105000A) | LS | 1 | $25,000 | $25,000 | $20,000 | $20,000 | $22,000 | $21,100 |
| 118 | Coated reinforcement, grade 60 (0530-0104100A) | LB | 12,070 | $2.90 | $4.14 | $3.15 | $3.31 | $3.31 | $4.14 |
| 119 | 42 inch diameter signal support drilled shaft (0963-0102000F) | LF | 16 | $1,800.00 | $900.00 | $1,700.00 | $1,700.00 | $1,800.00 | $906.25 |
| 120 | Constructing elastomeric concrete nosing (0584-0104000J) | SF | 143 | $65.00 | $70.00 | $74.00 | $64.00 | $80.00 | $76.35 |
| 121 | Truncated domes on new surfaces, curb ramp (0765-0100000J) | SF | 109 | $86.00 | $45.00 | $86.00 | $86.00 | $24.00 | $44.00 |
| 122 | Perforated steel square tube anchor sign supports (0930-0117000A) | LB | 92.80 | $6.47 | $10.78 | $5.60 | $5.60 | $43.10 | $9.70 |
| 123 | Construct structural concrete overlay (0559-0302000J) | SY | 111 | $65.00 | $100.00 | $155.00 | $160.00 | $168.00 | $170.00 |
| 124 | Concrete inlets, type G-2 (0470-0315000E) | EACH | 5 | $5,500.00 | $4,500.00 | $4,100.00 | $3,400.00 | $3,400.00 | $2,780.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of June 25, 2026. Compiled by Mirage Metrics.