ODOT contract 15676 bid tabulation
Or214 curb ramps (mt. angel). Let by Oregon DOT on July 30, 2026, Region 2. 6 bids received.
- Owner
- Oregon DOT
- Letting
- 30 JUL 2026
- Pay items
- 64
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 | Rank 5 | Rank 6 |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Removal of surfacings for curb ramp construction (0310-0106101J) | SY | 3,050 | $40.00 | $45.00 | $52.50 | $9.00 | $65.00 | $115.00 |
| 2 | Lawn seeding (1030-0138000J) | SY | 150 | $20.00 | $10.00 | $17.00 | $18.00 | $17.00 | $45.00 |
| 3 | Minor adjustment of manholes (0490-0120000E) | EACH | 7 | $1,200.00 | $1,500.00 | $1,130.00 | $1,400.00 | $2,450.00 | $3,000.00 |
| 4 | Signs, standard sheeting, sheet aluminum (0940-0202000J) | SF | 4 | $40.00 | $40.00 | $30.00 | $75.00 | $35.00 | $35.00 |
| 5 | Pavement bar, type B-HS (0867-0145100J) | SF | 677 | $18.00 | $12.00 | $15.35 | $25.00 | $18.00 | $16.50 |
| 6 | Temporary signs (0222-0102000J) | SF | 1,000 | $20.00 | $18.00 | $9.00 | $30.00 | $27.00 | $30.00 |
| 7 | Concrete inlets, type CG-3 (0470-0309000E) | EACH | 2 | $3,000.00 | $4,800.00 | $4,600.00 | $6,000.00 | $6,000.00 | $5,500.00 |
| 8 | Perforated steel square tube slip base sign supports (0930-0114000A) | LB | 1,046 | $7.65 | $3.59 | $6.84 | $9.08 | $7.46 | $8.13 |
| 9 | Lighting poles and arms (0970-0200000A) | EACH | 7 | $5,142.86 | $4,748.71 | $5,571.43 | $5,142.86 | $5,571.43 | $5,714.29 |
| 10 | Detectable guide strips, blue (0765-0300000J) | SF | 48 | $64.00 | $100.00 | $121.00 | $120.00 | $110.00 | $100.00 |
| 11 | Adjusting boxes (0490-0100000E) | EACH | 13 | $400.00 | $75.00 | $340.00 | $1,400.00 | $350.00 | $600.00 |
| 12 | Concrete manholes, with inlet, large (0470-0118000E) | EACH | 2 | $10,000 | $9,500.00 | $5,070.00 | $13,500 | $12,000 | $5,000.00 |
| 13 | Temporary type orange plastic mesh delineation fence (0270-0100000F) | LF | 50 | $8.00 | $5.00 | $20.00 | $12.00 | $15.00 | $50.00 |
| 14 | Level 3, 1/2 inch ACP mixture (0744-0302000M) | TON | 126 | $300.00 | $275.00 | $375.00 | $285.00 | $300.00 | $275.00 |
| 15 | Asphalt pavement sawcutting, 6 to 14 inches deep (0310-0119120F) | LF | 2,530 | $6.00 | $8.00 | $12.00 | $6.00 | $9.00 | $7.50 |
| 16 | Historical marker installation (0759-0158000E) | EACH | 3 | $300.00 | $150.00 | $230.00 | $500.00 | $200.00 | $175.00 |
| 17 | Concrete walks (0759-0128000J) | SF | 15,175 | $14.00 | $11.00 | $12.75 | $14.50 | $9.00 | $12.50 |
| 18 | Concrete inlets, type CG-2 (0470-0307000E) | EACH | 1 | $3,000.00 | $4,400.00 | $4,200.00 | $5,000.00 | $6,000.00 | $8,000.00 |
| 19 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $40,000 | $40,500 | $10,690 | $64,000 | $18,500 | $25,000 |
| 20 | Concrete curbs, standard curb (0759-0110000F) | LF | 579 | $40.00 | $22.00 | $33.00 | $45.00 | $44.00 | $45.00 |
| 21 | Switching, conduit, and wiring (0970-0105000A) | LF | 400 | $112.50 | $105.48 | $90.50 | $132.50 | $125.00 | $125.00 |
| 22 | Soil sample collection and analytical testing (0294-0700000E) | EACH | 5 | $2,200.00 | $1,200.00 | $2,420.00 | $1,500.00 | $20,000 | $3,000.00 |
| 23 | 12 inch storm sewer pipe, 5 FT depth (0445-035012AF) | LF | 4 | $200.00 | $175.00 | $380.00 | $250.00 | $125.00 | $194.59 |
| 24 | Concrete inlets, type G-2 (0470-0315000E) | EACH | 4 | $3,000.00 | $4,200.00 | $4,000.00 | $4,500.00 | $7,500.00 | $4,500.00 |
| 25 | Truncated domes on new surfaces, curb ramp (0765-0100000J) | SF | 713 | $50.00 | $40.00 | $35.00 | $38.00 | $48.00 | $50.00 |
| 26 | Trench resurfacing (0495-0100000J) | SY | 36 | $60.00 | $250.00 | $250.00 | $195.00 | $190.00 | $200.00 |
| 27 | Temporary barricades, type II (0224-0104000E) | EACH | 20 | $120.00 | $48.00 | $75.00 | $65.00 | $72.00 | $100.00 |
| 28 | Subgrade geotextile (0350-0105000J) | SY | 1,480 | $2.00 | $2.00 | $4.00 | $4.50 | $3.00 | $1.00 |
| 29 | Single mailbox supports (1070-0100000E) | EACH | 1 | $600.00 | $1,200.00 | $600.00 | $600.00 | $600.00 | $600.00 |
| 30 | Concrete driveways (0759-0126000J) | SF | 275 | $14.00 | $13.00 | $20.00 | $22.00 | $13.00 | $17.50 |
| 31 | Remove and reinstall existing signs (0905-0101000A) | LS | 1 | $3,000.00 | $6,400.00 | $3,000.00 | $8,500.00 | $3,300.00 | $3,500.00 |
| 32 | Extra for asphalt slope paving (0749-0108000J) | SF | 240 | $8.00 | $10.00 | $9.00 | $22.00 | $30.00 | $55.00 |
| 33 | Aggregate base (0640-0100000M) | TON | 1,345 | $64.00 | $75.00 | $70.00 | $55.00 | $96.00 | $35.00 |
| 34 | Wood sign posts (0910-0100000K) | FBM | 396 | $25.00 | $30.00 | $23.00 | $25.00 | $25.50 | $25.00 |
| 35 | Crosswalk closure supports (0902-0101000E) | EACH | 7 | $1,300.00 | $1,500.00 | $1,600.00 | $1,700.00 | $1,750.00 | $2,000.00 |
| 36 | Concrete sawcutting, less than 6 inches deep (0310-0119210F) | LF | 510 | $6.00 | $4.00 | $14.00 | $6.00 | $8.00 | $8.00 |
| 37 | Adjusting inlets (0490-0105000E) | EACH | 6 | $1,200.00 | $500.00 | $570.00 | $1,400.00 | $2,300.00 | $600.00 |
| 38 | Contaminated soil disposal (0294-0200010M) | TON | 100 | $140.00 | $180.00 | $51.00 | $250.00 | $600.00 | $125.00 |
| 39 | Flaggers (0223-0168000T) | HR | 300 | $75.00 | $87.00 | $115.00 | $90.00 | $78.00 | $94.00 |
| 40 | Pollution control plan (0290-0100000A) | LS | 1 | $1,000.00 | $2,500.00 | $630.00 | $3,500.00 | $4,500.00 | $1,000.00 |
| 41 | Sign support footings (0920-0100000A) | CY | 1.80 | $4,444.44 | $2,083.33 | $4,513.89 | $5,000.00 | $4,833.33 | $5,555.56 |
| 42 | Sequential arrow signs (0222-0162000E) | EACH | 2 | $6,000.00 | $3,500.00 | $2,820.00 | $2,500.00 | $2,500.00 | $3,000.00 |
| 43 | Bar removal (0225-0156000J) | SF | 1,051 | $10.00 | $2.00 | $4.25 | $17.00 | $9.00 | $8.50 |
| 44 | Temporary plastic drums (0224-0145000E) | EACH | 50 | $50.00 | $75.00 | $38.00 | $20.00 | $25.00 | $50.00 |
| 45 | 12 inch ductile iron pipe, 5 FT depth (0445-060012AF) | LF | 104 | $260.00 | $185.00 | $350.00 | $400.00 | $225.00 | $127.23 |
| 46 | Pedestrian channelizing devices (0228-0141600F) | LF | 200 | $20.00 | $20.00 | $19.00 | $25.00 | $30.00 | $30.00 |
| 47 | Thermoplastic, extruded, surface, non-profiled (0865-0116610F) | LF | 454 | $7.00 | $10.00 | $2.00 | $12.50 | $7.25 | $6.50 |
| 48 | Concrete stairs (0759-0150000K) | CY | 0.20 | $3,000.00 | $4,000.00 | $14,010 | $3,500.00 | $3,000.00 | $2,200.00 |
| 49 | Stripe removal (0225-0154000F) | LF | 292 | $5.00 | $2.00 | $1.55 | $10.00 | $5.00 | $4.50 |
| 50 | Health and safety plan (0294-0100000A) | LS | 1 | $1,000.00 | $5,000.00 | $630.00 | $3,500.00 | $10,000 | $10,000 |
| 51 | 8 inch ductile iron pipe, 5 FT depth (0445-060008AF) | LF | 7 | $200.00 | $145.00 | $405.00 | $250.00 | $150.00 | $222.39 |
| 52 | Inlet protection, type 7 (0280-0114070E) | EACH | 32 | $100.00 | $50.00 | $160.00 | $100.00 | $125.00 | $100.00 |
| 53 | Mainline video inspection (0415-0100000F) | LF | 115 | $12.00 | $4.50 | $8.00 | $45.00 | $15.00 | $20.00 |
| 54 | Concrete storm sewer manholes (0470-0101000E) | EACH | 1 | $6,000.00 | $8,500.00 | $4,860.00 | $11,500 | $9,500.00 | $7,000.00 |
| 55 | Pole foundations (0970-0100000A) | EACH | 7 | $2,142.86 | $1,964.29 | $1,542.86 | $4,000.00 | $2,228.57 | $2,142.86 |
| 56 | Painted concrete (0296-0100000M) | TON | 1 | $100.00 | $500.00 | $240.00 | $2,250.00 | $12,000 | $5,000.00 |
| 57 | Commercial asphalt concrete pavement (0740-0100000M) | TON | 275 | $300.00 | $275.00 | $375.00 | $285.00 | $275.00 | $275.00 |
| 58 | Topsoil (1040-0101000K) | CY | 20 | $100.00 | $75.00 | $85.00 | $200.00 | $170.00 | $250.00 |
| 59 | Flashing beacon installation, OR214-church ST. (0990-0106000A) | EACH | 1 | $31,000 | $28,394 | $25,500 | $35,000 | $35,000 | $33,000 |
| 60 | Temporary curb ramp, parallel (0228-0167670E) | EACH | 2 | $1,400.00 | $900.00 | $440.00 | $450.00 | $2,500.00 | $3,000.00 |
| 61 | Bark mulch (1040-0190000K) | CY | 20 | $100.00 | $45.00 | $85.00 | $300.00 | $160.00 | $170.00 |
| 62 | Concrete curbs, curb and gutter (0759-0103000F) | LF | 1,190 | $62.00 | $28.00 | $67.00 | $55.00 | $46.00 | $70.00 |
| 63 | Luminaires, lamps, and ballasts (0970-0104000A) | EACH | 7 | $857.14 | $480.00 | $642.86 | $765.71 | $571.43 | $571.43 |
| 64 | Pavement legend, type B-HS: bicycle lane stencil (0867-0131000E) | EACH | 1 | $450.00 | $700.00 | $400.00 | $600.00 | $500.00 | $400.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of July 30, 2026. Compiled by Mirage Metrics.