ODOT contract 15677 bid tabulation
Us20: harney st/moore dr (newport). Let by Oregon DOT on July 23, 2026, Region 2. 5 bids received.
- Owner
- Oregon DOT
- Letting
- 23 JUL 2026
- Pay items
- 101
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 | ||
| 5 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 | Rank 5 |
|---|---|---|---|---|---|---|---|---|
| 1 | Sequential arrow signs (0222-0162000E) | EACH | 1 | $1,100.00 | $1,800.00 | $3,500.00 | $3,000.00 | $4,100.00 |
| 2 | Removal of inlets (0310-0104000E) | EACH | 1 | $900.00 | $500.00 | $1,350.00 | $1,300.00 | $550.00 |
| 3 | Asphalt pavement sawcutting, 6 to 14 inches deep (0310-0119120F) | LF | 2,110 | $7.50 | $8.00 | $3.00 | $8.00 | $7.50 |
| 4 | Temporary pavement legends (0225-0153100E) | EACH | 16 | $95.00 | $100.00 | $92.00 | $85.00 | $90.00 |
| 5 | Sloped end sections, 18 inch (0445-0700180E) | EACH | 1 | $690.00 | $1,500.00 | $2,300.00 | $1,300.00 | $400.00 |
| 6 | Removal of pipes (0310-0100000F) | LF | 265 | $55.00 | $11.00 | $44.00 | $40.00 | $38.00 |
| 7 | 12 inch storm sewer pipe, 5 FT depth (0445-035012AF) | LF | 505 | $105.00 | $155.00 | $165.00 | $265.00 | $168.00 |
| 8 | Concrete curbs, low profile mountable curb (0759-0106000F) | LF | 175 | $42.00 | $55.00 | $65.00 | $57.00 | $60.00 |
| 9 | Subgrade geotextile (0350-0105000J) | SY | 200 | $3.00 | $5.00 | $5.00 | $5.00 | $1.50 |
| 10 | Inlet protection, type 4 (0280-0114040E) | EACH | 7 | $75.00 | $50.00 | $66.00 | $100.00 | $190.00 |
| 11 | Temporary signs (0222-0102000J) | SF | 880 | $27.00 | $30.00 | $8.00 | $25.00 | $25.50 |
| 12 | Extra for hand dug guardrail post holes (0810-0145000E) | EACH | 50 | $280.00 | $330.00 | $270.00 | $250.00 | $265.00 |
| 13 | Sign support footings (0920-0100000A) | CY | 1.44 | $4,375.00 | $7,986.11 | $3,125.00 | $4,861.11 | $4,131.94 |
| 14 | 42 inch diameter signal support drilled shaft (0963-0102000F) | LF | 105 | $950.00 | $1,050.00 | $925.00 | $850.00 | $900.00 |
| 15 | Pavement legend, type B-HS: bicycle lane stencil (0867-0131000E) | EACH | 6 | $450.00 | $500.00 | $450.00 | $400.00 | $425.00 |
| 16 | Delineators, type 1U (0840-0101000E) | EACH | 12 | $75.00 | $200.00 | $135.00 | $65.00 | $70.00 |
| 17 | Stone embankment (0330-0126000K) | CY | 2,230 | $60.00 | $83.00 | $98.00 | $65.00 | $58.00 |
| 18 | Straw bale (0280-0119000E) | EACH | 8 | $9.00 | $100.00 | $25.00 | $100.00 | $67.00 |
| 19 | Water quality biofiltration swale dfi D00492 (1012-0100000A) | LS | 1 | $20,000 | $15,000 | $7,000.00 | $20,000 | $12,500 |
| 20 | Perforated steel square tube anchor sign supports (0930-0117000A) | LB | 557 | $7.36 | $7.18 | $28.01 | $7.18 | $6.87 |
| 21 | Pavement legend, type B-HS: "xing" (0867-0153100E) | EACH | 1 | $675.00 | $700.00 | $650.00 | $600.00 | $650.00 |
| 22 | Concrete walks (0759-0128000J) | SF | 5,200 | $11.00 | $11.00 | $23.00 | $14.00 | $11.50 |
| 23 | Mainline video inspection (0415-0100000F) | LF | 1,100 | $3.50 | $15.00 | $9.00 | $6.00 | $9.50 |
| 24 | Temporary walks (0228-0167680J) | SF | 250 | $11.00 | $10.00 | $14.00 | $15.00 | $12.00 |
| 25 | Check dam, type 6 (0280-0106060E) | EACH | 21 | $140.00 | $137.00 | $425.00 | $150.00 | $5.50 |
| 26 | Removal of guardrail (0310-0113000A) | LF | 1,075 | $9.30 | $10.74 | $4.37 | $4.65 | $4.33 |
| 27 | Loose riprap, class 50 (0390-0105000K) | CY | 41 | $65.00 | $145.00 | $315.00 | $80.00 | $125.00 |
| 28 | Midwest guardrail system, type 2A (0810-0146100F) | LF | 775 | $36.00 | $43.15 | $34.00 | $32.00 | $34.00 |
| 29 | Stripe removal (0225-0154000F) | LF | 14,138 | $0.60 | $0.40 | $0.60 | $0.58 | $0.50 |
| 30 | Pavement legend, type B-HS: shared lane marking (0867-0174000E) | EACH | 1 | $450.00 | $500.00 | $450.00 | $400.00 | $425.00 |
| 31 | Matting, type C (0280-0105030J) | SY | 100 | $8.00 | $9.00 | $9.00 | $4.00 | $8.50 |
| 32 | Pavement bar, type B-HS (0867-0145100J) | SF | 663 | $17.00 | $16.50 | $16.00 | $14.00 | $16.00 |
| 33 | Temporary traffic signal, US20 @ SE moore DR (0227-0158000A) | LS | 1 | $185,000 | $188,543 | $178,000 | $180,000 | $175,000 |
| 34 | Temporary flexible pavement markers (0225-0149000E) | EACH | 500 | $2.00 | $2.00 | $2.00 | $4.00 | $2.00 |
| 35 | Facility field markers, type S2 (0842-0103001E) | EACH | 2 | $185.00 | $200.00 | $240.00 | $165.00 | $175.00 |
| 36 | Concrete curbs (0759-0100000F) | LF | 360 | $30.00 | $55.00 | $51.00 | $57.00 | $57.00 |
| 37 | Signs, standard sheeting, sheet aluminum (0940-0202000J) | SF | 247 | $27.00 | $30.00 | $25.00 | $24.00 | $25.00 |
| 38 | Permanent seeding (1030-0108000R) | ACRE | 0.65 | $14,500 | $14,300 | $14,150 | $13,000 | $13,800 |
| 39 | Legend removal (0225-0155100J) | SF | 880 | $8.00 | $8.25 | $8.00 | $5.00 | $8.00 |
| 40 | Paved culvert end slopes (0460-0100000J) | SF | 127 | $25.00 | $25.00 | $23.00 | $50.00 | $43.00 |
| 41 | Wood sign posts (0910-0100000K) | FBM | 260 | $20.00 | $25.00 | $5.00 | $18.00 | $19.00 |
| 42 | Flaggers (0223-0168000T) | HR | 500 | $89.00 | $95.00 | $78.00 | $90.00 | $80.00 |
| 43 | Mono-directional white type iar markers, recessed (0855-0106100E) | EACH | 41 | $45.00 | $43.00 | $41.00 | $40.00 | $40.00 |
| 44 | Flagger station lighting (0223-0168100E) | EACH | 4 | $2,250.00 | $1,800.00 | $2,300.00 | $1,000.00 | $1,550.00 |
| 45 | Thermoplastic, extruded, surface, non-profiled (0865-0116610F) | LF | 13,500 | $1.50 | $1.55 | $1.50 | $1.35 | $1.50 |
| 46 | Remove existing signs (0905-0100000A) | LS | 1 | $1,500.00 | $2,500.00 | $2,500.00 | $2,000.00 | $1,500.00 |
| 47 | Lawn seeding (1030-0138000J) | SY | 263 | $8.00 | $7.70 | $8.00 | $7.00 | $7.50 |
| 48 | 18 inch storm sewer pipe, 5 FT depth (0445-035018AF) | LF | 304 | $175.00 | $170.00 | $220.00 | $280.00 | $265.00 |
| 49 | Perforated steel square tube slip base sign supports (0930-0114000A) | LB | 810 | $7.78 | $5.86 | $5.59 | $8.64 | $7.35 |
| 50 | Temporary impact attenuator, truck mounted (0226-0138000E) | EACH | 2 | $6,000.00 | $25,000 | $19,000 | $15,000 | $26,500 |
| 51 | Sediment barrier, type 4 (0280-0115040E) | EACH | 3 | $82.00 | $200.00 | $156.00 | $100.00 | $220.00 |
| 52 | Sloped end sections, 12 inch (0445-0700120E) | EACH | 4 | $460.00 | $1,000.00 | $850.00 | $1,100.00 | $200.00 |
| 53 | Aggregate base (0641-0102000M) | TON | 1,450 | $63.00 | $66.00 | $66.00 | $50.00 | $57.00 |
| 54 | Pavement legend, type B-HS: "school" (0867-0111100E) | EACH | 1 | $1,250.00 | $1,000.00 | $1,200.00 | $1,100.00 | $1,200.00 |
| 55 | Traffic signal installation, US20 @ SE moore DR (0990-0101000A) | EACH | 1 | $465,000 | $473,073 | $448,000 | $455,000 | $437,000 |
| 56 | Temporary pavement bars (0225-0153200J) | SF | 720 | $4.00 | $4.00 | $4.00 | $3.00 | $3.70 |
| 57 | Temporary curb ramp, US20 @ harney ST. (0228-0167670E) | EACH | 1 | $3,000.00 | $1,000.00 | $1,300.00 | $2,000.00 | $1,000.00 |
| 58 | Filling abandoned structures (0490-0117000E) | EACH | 1 | $3,000.00 | $3,000.00 | $1,300.00 | $3,000.00 | $1,650.00 |
| 59 | BI-directional yellow type iar markers, recessed (0855-0107100E) | EACH | 61 | $45.00 | $43.00 | $41.00 | $40.00 | $40.00 |
| 60 | Signal pole mounts (0930-0107000A) | LB | 458.20 | $29.46 | $25.10 | $22.92 | $28.37 | $27.83 |
| 61 | Signs, wide angle sheeting, sheet aluminum (0940-0205100J) | SF | 55 | $34.00 | $40.00 | $25.00 | $30.00 | $32.00 |
| 62 | Sediment barrier, type 9 (0280-0115090F) | LF | 507 | $7.50 | $7.00 | $7.00 | $6.00 | $7.00 |
| 63 | Concrete in blocks (0445-0735030K) | CY | 23 | $720.00 | $500.00 | $1,150.00 | $360.00 | $750.00 |
| 64 | Check dam, type 1 (0280-0106010E) | EACH | 6 | $250.00 | $100.00 | $350.00 | $150.00 | $130.00 |
| 65 | Temporary barricades, type III (0224-0105000E) | EACH | 7 | $225.00 | $200.00 | $25.00 | $125.00 | $200.00 |
| 66 | Temporary barricades, type II (0224-0104000E) | EACH | 20 | $75.00 | $70.00 | $25.00 | $100.00 | $75.00 |
| 67 | Pedestrian channelizing devices (0228-0141600F) | LF | 200 | $28.00 | $30.00 | $3.00 | $35.00 | $25.00 |
| 68 | Temporary curb ramp, perpendicular (0228-0167670E) | EACH | 1 | $1,700.00 | $1,000.00 | $1,300.00 | $2,000.00 | $1,000.00 |
| 69 | Plastic sheeting (0280-0101000J) | SY | 200 | $0.45 | $5.00 | $0.40 | $4.00 | $3.50 |
| 70 | Construction entrance, type 1 (0280-0110010E) | EACH | 3 | $2,700.00 | $2,500.00 | $3,500.00 | $5,000.00 | $4,500.00 |
| 71 | Concrete inlets, type G-2 (0470-0315000E) | EACH | 3 | $3,200.00 | $4,500.00 | $3,700.00 | $5,500.00 | $3,300.00 |
| 72 | Extra for manholes over existing sewers (0490-0123000E) | EACH | 1 | $4,275.00 | $3,500.00 | $1,625.00 | $5,000.00 | $750.00 |
| 73 | Facility field markers, type S1 red (0842-0102001E) | EACH | 2 | $80.00 | $200.00 | $135.00 | $70.00 | $75.00 |
| 74 | Concrete inlets, type D (modified) (0470-0312000E) | EACH | 1 | $3,650.00 | $4,500.00 | $3,700.00 | $4,000.00 | $3,700.00 |
| 75 | Compost erosion blanket (0280-0105100J) | SY | 3,100 | $6.50 | $6.75 | $6.00 | $5.00 | $6.00 |
| 76 | Pollution control plan (0290-0100000A) | LS | 1 | $5,000.00 | $1,500.00 | $500.00 | $100.00 | $620.00 |
| 77 | Inlet protection, type 3 (0280-0114030E) | EACH | 4 | $93.00 | $100.00 | $60.00 | $100.00 | $100.00 |
| 78 | Temporary striping (0225-0153000F) | LF | 14,138 | $0.40 | $0.65 | $0.38 | $0.38 | $0.40 |
| 79 | Concrete washout facility (0280-0112500E) | EACH | 1 | $2,600.00 | $1,000.00 | $3,500.00 | $2,000.00 | $2,200.00 |
| 80 | Matting, type E (0280-0105050J) | SY | 510 | $9.00 | $9.00 | $9.00 | $4.00 | $8.50 |
| 81 | Cold plane pavement removal, 2 inches deep (0620-0120000J) | SY | 9,800 | $3.50 | $7.50 | $4.25 | $4.00 | $8.00 |
| 82 | Temporary plastic drums (0224-0145000E) | EACH | 12 | $28.00 | $85.00 | $25.00 | $125.00 | $57.00 |
| 83 | Level 3, 1/2 inch ACP mixture (0744-0302000M) | TON | 2,070 | $145.00 | $145.00 | $131.00 | $145.00 | $140.00 |
| 84 | Pavement legend, type B-HS: arrows (0867-0103100E) | EACH | 11 | $750.00 | $1,000.00 | $710.00 | $650.00 | $690.00 |
| 85 | Repair temporary impact attenuator, truck mounted (0226-0141400E) | EACH | 1 | $500.00 | $1.00 | $1,000.00 | $100.00 | $2,500.00 |
| 86 | Facility field markers, type S1 green (0842-0101001E) | EACH | 2 | $80.00 | $200.00 | $135.00 | $70.00 | $75.00 |
| 87 | Truncated domes on new surfaces, curb ramp (0765-0100000J) | SF | 96 | $25.00 | $50.00 | $45.00 | $40.00 | $46.00 |
| 88 | Remove and reinstall existing signs (0905-0101000A) | LS | 1 | $500.00 | $500.00 | $650.00 | $500.00 | $500.00 |
| 89 | Guardrail terminals, non-flared (0810-0129000E) | EACH | 4 | $4,100.00 | $4,400.00 | $3,900.00 | $4,000.00 | $3,825.00 |
| 90 | 6 inch concrete surfacing (0759-0140000J) | SF | 500 | $11.00 | $12.00 | $28.00 | $27.00 | $19.50 |
| 91 | Embankment in place (0330-0123000K) | CY | 1,425 | $34.00 | $33.00 | $59.00 | $40.00 | $140.00 |
| 92 | Clearing and grubbing (0320-0100000A) | ACRE | 2 | $10,000 | $25,000 | $45,000 | $16,500 | $10,000 |
| 93 | Erosion and sediment control manager (0280-0110000A) | LS | 1 | $25,000 | $5,000.00 | $5,000.00 | $100.00 | $6,200.00 |
| 94 | Water quality biofiltration swale dfi D00493 (1012-0100000A) | LS | 1 | $20,000 | $17,460 | $9,700.00 | $23,000 | $15,000 |
| 95 | Sediment barrier, type 3 (0280-0115030F) | LF | 315 | $6.00 | $5.00 | $6.00 | $5.00 | $6.00 |
| 96 | Concrete manholes, with inlet (0470-0103000E) | EACH | 6 | $7,800.00 | $7,000.00 | $6,000.00 | $13,000 | $10,250 |
| 97 | Concrete storm sewer manholes (0470-0101000E) | EACH | 4 | $8,000.00 | $7,000.00 | $6,900.00 | $11,000 | $9,200.00 |
| 98 | Portable changeable message signs (0222-0164000E) | EACH | 4 | $6,750.00 | $8,000.00 | $4,400.00 | $5,000.00 | $9,650.00 |
| 99 | Delineators, type 4 alternate 1 (0840-0104100E) | EACH | 20 | $45.00 | $35.00 | $135.00 | $40.00 | $50.00 |
| 100 | Concrete curbs, mountable curb and gutter (0759-0114000F) | LF | 300 | $45.00 | $55.00 | $61.00 | $57.00 | $62.00 |
| 101 | Concrete curbs, curb and gutter (0759-0103000F) | LF | 760 | $42.00 | $55.00 | $61.00 | $57.00 | $62.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of July 23, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.