SCDOT contract 0974020 bid tabulation

2026 Calhoun Rehabilitation. Let by South Carolina DOT on September 9, 2025, Calhoun, District 7. 3 bids received; low bid $4,329,915 by Palmetto Corp. of Conway.

Owner
South Carolina DOT
Letting
09 SEP 2025
Pay items
39
Data through
13 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Palmetto Corp. of Conway$4,329,915Low
2Blythe Construction, Inc.$4,534,368+5.0%
3C.R. Jackson, Inc.$4,567,898+5.0%
SCDOT contract 0974020: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Palmetto Corp. of Conway2. Blythe Construction, Inc.3. C.R. Jackson, Inc.
0010Mobilization (1031000)LS1$155,000$226,700$228,000
0020Bonds and insurance (1032010)LS1$80,000$15,550$91,000
0030Borrow excavation (2033000)CY1,598$51.25$84.50$27.50
0040Excavation for shoulder paving (2036000)STA843.74$35.15$66.85$115.00
0050Hauling of excavated shoulder material (2072000)STA843.74$74.70$83.15$85.00
0060Maintenance stone (3059900)TON24.10$130.00$48.00$150.00
0070HMA shoulder widening course (3104000)TON5,905.97$81.10$84.25$80.00
0080Liquid asphalt binder PG64-22 (4011004)TON1,355.54$575.00$617.00$635.00
0090Aramid fiber (4011500)LB4,220$62.50$66.60$65.00
0100Full depth asph. pav. patching 4" unif. (4012040)SY800$55.55$53.65$55.00
0110Full depth asph. pav. patching 6" unif. (4012060)SY1,500$80.20$61.80$80.00
0120Full depth asph. pav. patching 8" unif (4012080)SY110$159.65$121.50$119.00
0130Milling existing asphalt pavement 2.0" (4013120)SY29,400$2.65$2.75$2.50
0140Milling existing asphalt pavement (variable) (4013990)SY3,700$19.15$26.75$13.00
0150Asphalt surface course type B (4040320)TON10,657.12$91.10$82.50$85.00
0160Asphalt surface course type C (4040340)TON6,164.12$84.70$79.50$82.00
0170Asphalt surface course type D (4040350)TON820$132.20$147.50$99.00
0180Driveway paving-surface type D (4047230)TON499.38$284.20$337.50$215.00
0190Traffic control (6011000)LS1$141,350$240,750$346,000
0200Permanent construction signs (ground mounted) (6051120)SF964$6.25$5.50$6.45
02104" white broken lines -(gaps excluded)-fast dry paint (6240005)LF8,720$0.12$0.12$0.12
02204" white solid lines (PVT. edge lines)-fast dry paint (6240010)LF168,820$0.11$0.11$0.11
023024" white solid lines (stop/diagonal lines)-fast dry paint (6240025)LF580$0.01$0.01$0.01
02404" yellow broken lines(gaps exc) - fast dry paint (6240105)LF17,260$0.12$0.12$0.12
02504"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110)LF130,120$0.11$0.11$0.11
02604" white broken lines(gaps excl.)perm.PVMT.marking (6251005)LF4,360$0.48$0.48$0.48
02704" white solid lines (PVT. edge lines) perm.PVMT.marking (6251010)LF84,410$0.46$0.46$0.46
028024" white solid lines (stop/diag lines)- perm.PVMT.marking (6251025)LF290$13.00$13.00$13.00
02904" yellow broken lines(gaps exc)perm.PVMT.marking (6251064)LF8,630$0.48$0.48$0.48
03004" yellow solid lines(PVT.edge lines) perm.PVMT.marking (6251074)LF65,060$0.46$0.46$0.46
0310Permanent clear pavement markers- mono-dir.- 4"X4" (6300005)EACH220$4.50$4.50$4.50
0320Permanent yellow pavement markers mono-dir.- 4"X 4" perm. yel. (6301005)EACH420$4.50$4.50$4.50
0330Permanent yellow pavement markers BI-dir.- 4"X4" (6301100)EACH935$4.50$4.50$4.50
0340Milled-in rumble strip (6321000)MI18.52$500.00$500.00$500.00
0350Premash W-beam strong post system WSP3 (8051050)LF50$27.00$25.00$27.00
0360Premash thrie with base PL 6.25 space (8051207)LF70$81.40$60.00$81.40
0370Premash thrie strong post guardrail (8053050)LF50$35.00$40.00$35.00
0380Premash type T TL3 leading 50' (8057100)EACH4$2,200.00$4,400.00$2,442.50
0390Permanent grassing for non-permitted resurfacing projects (8100102)ACRE7.99$3,077.82$3,077.82$3,077.82
SCDOT contract 0974020: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.

Every contract let that day: SCDOT letting of September 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.