SCDOT contract 1273410 bid tabulation
2026 Chester Rehab/Reconstruction. Let by South Carolina DOT on September 9, 2025, Chester, District 4. 4 bids received; low bid $8,103,590 by Palmetto Corp. of Conway.
- Owner
- South Carolina DOT
- Letting
- 09 SEP 2025
- Pay items
- 98
- Data through
- 13 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Palmetto Corp. of Conway | $8,103,590 | Low |
| 2 | King Asphalt, Inc. | $8,301,629 | +2.0% |
| 3 | Blythe Brothers Asphalt Co., LLC | $8,318,315 | +3.0% |
| 4 | Lci-Lineberger Construction, Inc. | $9,380,719 | +16% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Palmetto Corp. of Conway | 2. King Asphalt, Inc. | 3. Blythe Brothers Asphalt Co., LLC | 4. Lci-Lineberger Construction, Inc. |
|---|---|---|---|---|---|---|---|
| 0010 | Mobilization (1031000) | LS | 1 | $165,000 | $376,500 | $300,000 | $125,000 |
| 0020 | Bonds and insurance (1032010) | LS | 1 | $125,000 | $75,000 | $25,000 | $75,000 |
| 0030 | Railroad insurance and flagging 001 (1071403) | LS | 1 | $35,000 | $28,500 | $75,000 | $7,500.00 |
| 0040 | Removal & disposal of existing pavement (2023000) | SY | 388 | $48.80 | $39.00 | $40.00 | $36.00 |
| 0050 | Removal & disposal of existing curb (2024100) | LF | 219 | $24.65 | $17.50 | $18.00 | $30.00 |
| 0060 | Removal of exist. guardrail (2027801) | LF | 8,997.50 | $1.00 | $1.00 | $1.00 | $1.25 |
| 0070 | Unclassified excavation (2031000) | CY | 550 | $24.60 | $62.10 | $33.00 | $65.00 |
| 0080 | Borrow excavation (2033000) | CY | 1,383.60 | $73.80 | $40.50 | $75.00 | $65.00 |
| 0090 | Station grading (2035000) | STA | 43.95 | $1,555.00 | $2,000.00 | $1,250.00 | $975.00 |
| 0100 | Excavation for shoulder paving (2036000) | STA | 523.73 | $42.65 | $114.00 | $100.00 | $188.00 |
| 0110 | Hauling of excavated shoulder material (2072000) | STA | 523.73 | $84.75 | $67.00 | $100.00 | $325.00 |
| 0120 | Maintenance stone (3059900) | TON | 244.50 | $99.00 | $76.00 | $100.00 | $80.00 |
| 0130 | Cement modified recycled base (8" unif)-curing method B (3063222) | SY | 37,149 | $7.20 | $8.50 | $7.00 | $7.74 |
| 0140 | Cement modified recycled base (10" unif)-curing method B (3063232) | SY | 22,734 | $7.15 | $9.00 | $10.00 | $8.20 |
| 0150 | Portland cement for cement modified recycled base course (3064000) | TON | 1,590 | $250.00 | $223.00 | $255.00 | $245.00 |
| 0160 | HMA shoulder widening course (3104000) | TON | 3,504.90 | $76.55 | $66.50 | $85.50 | $103.00 |
| 0170 | Liquid asphalt binder PG64-22 (4011004) | TON | 1,494.30 | $635.00 | $629.10 | $639.00 | $650.00 |
| 0180 | Full depth asph. pav. patching 6" unif. (4012060) | SY | 125 | $88.05 | $100.00 | $72.00 | $115.00 |
| 0190 | Full depth asph. pav. patching 8" unif (4012080) | SY | 310 | $107.25 | $204.50 | $90.00 | $110.00 |
| 0200 | Full depth asph. pav. patching 12"unif (4012120) | SY | 14,100 | $102.45 | $101.00 | $98.00 | $150.00 |
| 0210 | Milling existing asphalt pavement 1.75" (4013117) | SY | 126,689.20 | $2.50 | $2.80 | $3.90 | $2.95 |
| 0220 | Milling existing asphalt pavement (variable) (4013990) | SY | 9,771 | $6.50 | $9.40 | $10.00 | $8.90 |
| 0230 | Asphalt intermediate course type C (4030330) | TON | 2,182.40 | $72.85 | $68.00 | $77.00 | $88.36 |
| 0240 | Asphalt surface course type B (4040320) | TON | 13,849.97 | $83.45 | $61.00 | $83.40 | $84.03 |
| 0250 | Asphalt surface course type C (4040340) | TON | 5,627.43 | $85.30 | $77.90 | $79.00 | $135.00 |
| 0260 | Asphalt surface course type E (4040360) | TON | 129.07 | $130.00 | $141.95 | $108.00 | $140.00 |
| 0270 | Driveway paving-surface type C (4047220) | TON | 1,318.88 | $209.00 | $229.00 | $175.00 | $185.00 |
| 0280 | Asphalt surface treat (single treatment) (4060010) | SY | 59,883 | $2.75 | $3.00 | $3.20 | $2.60 |
| 0290 | Traffic control (6011000) | LS | 1 | $450,000 | $695,000 | $325,000 | $375,000 |
| 0300 | Permanent construction signs (ground mounted) (6051120) | SF | 1,483 | $5.50 | $7.40 | $7.00 | $7.25 |
| 0310 | Pref. flex.wet retro. PVMT. mark. (T-2) temp. removable 24” X 36” white triangle yield bar yield marking (609138G) | LF | 40 | $20.00 | $5.00 | $5.00 | $5.71 |
| 0320 | 4" white broken lines -(gaps excluded)-fast dry paint (6240005) | LF | 9,386 | $0.03 | $0.15 | $0.15 | $0.17 |
| 0330 | 4" white solid lines (PVT. edge lines)-fast dry paint (6240010) | LF | 255,323 | $0.11 | $0.15 | $0.15 | $0.17 |
| 0340 | 8"white solid lines (crosswalk& channelization)fast dry paint (6240015) | LF | 1,790 | $0.15 | $0.15 | $0.15 | $0.17 |
| 0350 | 24" white solid lines (stop/diagonal lines)-fast dry paint (6240025) | LF | 1,456 | $1.00 | $2.00 | $2.00 | $2.28 |
| 0360 | White single arrow (left, straight, right)-fast dry paint (6240030) | EACH | 36 | $10.00 | $25.00 | $25.00 | $28.55 |
| 0370 | White word message "only"- fast dry paint (6240035) | EACH | 27 | $10.00 | $25.00 | $25.00 | $28.55 |
| 0380 | White combination arrow(STR.& RT.or STR.& LT.)fast dry paint (6240040) | EACH | 4 | $25.00 | $25.00 | $25.00 | $28.55 |
| 0390 | White lane drop arrow (left or right)-fast dry paint (6240043) | EACH | 2 | $50.00 | $25.00 | $25.00 | $28.55 |
| 0400 | Railroad crossing symbols - fast dry paint (6240045) | EACH | 4 | $100.00 | $50.00 | $50.00 | $57.10 |
| 0410 | 4" yellow broken lines(gaps exc) - fast dry paint (6240105) | LF | 15,414 | $0.12 | $0.15 | $0.15 | $0.17 |
| 0420 | 4"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110) | LF | 231,910 | $0.11 | $0.15 | $0.15 | $0.17 |
| 0430 | 6" yellow solid line on curb/median - fast dry paint (6240112) | LF | 519 | $1.00 | $1.50 | $1.50 | $1.71 |
| 0440 | 24" yellow diagonal lines - fast dry paint (6240115) | LF | 404 | $0.50 | $2.00 | $2.00 | $2.28 |
| 0450 | 4" white solid lines (PVT. edge lines) epoxy paint slow cure (6261010) | LF | 360 | $5.00 | $5.00 | $5.00 | $5.71 |
| 0460 | 4" yellow broken lines(gaps exc) epoxy paint slow cure (6261105) | LF | 40 | $5.00 | $7.50 | $7.50 | $8.57 |
| 0470 | 4" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005) | LF | 4,768 | $0.43 | $0.75 | $0.75 | $0.86 |
| 0480 | 4" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010) | LF | 99,259 | $0.44 | $0.50 | $0.48 | $0.55 |
| 0490 | 8" white solid lines thermoplastic - 125 mil. (6271015) | LF | 895 | $3.00 | $3.50 | $3.50 | $4.00 |
| 0500 | 24IN X 36IN white triang. yield bar (gaps exc)thermo-125MIL (6271024) | LF | 40 | $5.00 | $25.00 | $25.00 | $28.55 |
| 0510 | 24" white solid lines (stop/diag lines)-thermo.-125 mil (6271025) | LF | 1,054 | $9.00 | $10.50 | $10.50 | $11.99 |
| 0520 | White single arrows (LT, STRGHT, RT) thermo.-125 mil. (6271030) | EACH | 19 | $65.00 | $75.00 | $75.00 | $85.65 |
| 0530 | White word message "only" - thermoplastic - 125 mil. (6271035) | EACH | 14 | $70.00 | $75.00 | $75.00 | $85.65 |
| 0540 | White combination arrows(STR&RT.or STR& LT)thermo-125MIL (6271040) | EACH | 2 | $100.00 | $100.00 | $100.00 | $114.21 |
| 0550 | White lane drop arrow(LT.or RT.)thermo-125MIL (6271043) | EACH | 2 | $150.00 | $200.00 | $200.00 | $228.41 |
| 0560 | Railroad crossing symbols - thermoplastic - 125 mil. (6271045) | EACH | 2 | $500.00 | $500.00 | $500.00 | $571.03 |
| 0570 | 4" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271064) | LF | 8,502 | $0.46 | $0.50 | $0.48 | $0.55 |
| 0580 | 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074) | LF | 84,111 | $0.44 | $0.50 | $0.48 | $0.55 |
| 0590 | 24" yellow solid lines - thermoplastic - 125 mil. (6271080) | LF | 202 | $10.00 | $6.00 | $6.00 | $6.85 |
| 0600 | Permanent clear pavement markers- mono-dir.- 4"X4" (6300005) | EACH | 235 | $6.00 | $7.50 | $7.50 | $8.57 |
| 0610 | Permanent yellow pavement markers mono-dir.- 4"X 4" perm. yel. (6301005) | EACH | 245 | $6.00 | $7.50 | $7.50 | $8.57 |
| 0620 | Permanent yellow pavement markers BI-dir.- 4"X4" (6301100) | EACH | 1,025 | $6.00 | $7.50 | $7.50 | $8.57 |
| 0630 | Milled-in rumble strip (6321000) | MI | 17.77 | $500.00 | $500.00 | $960.00 | $1,050.00 |
| 0640 | Furnish & install 1.0" schedule 80 PVC conduit (6750275) | LF | 50 | $17.50 | $17.50 | $17.50 | $22.84 |
| 0650 | Furnish & instl no. 14 copper wire,1-conductor for loop wire (6770413) | LF | 1,000 | $1.15 | $1.15 | $1.15 | $4.57 |
| 0660 | Sawcut for loop detector (6780495) | LF | 350 | $9.61 | $9.61 | $9.61 | $22.84 |
| 0670 | F&I-12"X12"X12"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD (6800508) | EACH | 3 | $596.42 | $596.50 | $600.00 | $913.64 |
| 0680 | Temporary adjustment of traffic signal equipment (6885993) | EACH | 1 | $10,000 | $10,000 | $10,000 | $13,705 |
| 0690 | 15" smooth wall pipe (7143615) | LF | 96 | $275.50 | $160.00 | $200.00 | $333.66 |
| 0700 | 18" smooth wall pipe (7143618) | LF | 16 | $755.85 | $200.00 | $250.00 | $407.28 |
| 0710 | 48" smooth wall pipe (7143648) | LF | 24 | $898.45 | $300.00 | $350.00 | $561.92 |
| 0720 | Concrete collar for UP to 24" pipe (7197052) | EACH | 2 | $1,125.00 | $3,900.00 | $3,900.00 | $2,085.00 |
| 0730 | Concrete collar for UP to 48" pipe (7197054) | EACH | 1 | $1,255.00 | $7,000.00 | $7,000.00 | $4,200.00 |
| 0740 | Adjust drop inlet adjust D. I. (7197130) | EACH | 1 | $2,415.00 | $2,500.00 | $2,500.00 | $2,450.00 |
| 0750 | Catch basin T-17 (convert C.B. type 5) (7198291) | EACH | 8 | $7,250.00 | $7,650.00 | $7,650.00 | $2,450.00 |
| 0760 | Catch basin T-17 (convert C.B. type 6) (7198292) | EACH | 10 | $7,045.00 | $7,650.00 | $7,650.00 | $2,450.00 |
| 0770 | Catch basin T-18 (convert C.B. type 7) (7198293) | EACH | 4 | $8,175.00 | $8,000.00 | $8,000.00 | $2,450.00 |
| 0780 | Concrete curb (9" X 15") (7201000) | LF | 15 | $164.15 | $68.00 | $68.00 | $100.00 |
| 0790 | Concrete curb and gutter(1'-6") vertical face (7203110) | LF | 170 | $51.95 | $50.00 | $50.00 | $50.00 |
| 0800 | Concrete sidewalk(4" uniform) (7204100) | SY | 15 | $185.05 | $100.00 | $100.00 | $305.00 |
| 0810 | Detectable warning material (7204900) | SF | 112.50 | $45.00 | $40.00 | $40.00 | $50.00 |
| 0820 | Concrete driveway(6" uniform) (7205000) | SY | 75 | $139.65 | $120.00 | $120.00 | $175.00 |
| 0830 | Concrete median (7206000) | SY | 53 | $135.25 | $120.00 | $120.00 | $115.00 |
| 0840 | Pedestrian ramp construction (7209000) | SY | 225 | $149.85 | $130.00 | $130.00 | $185.00 |
| 0850 | Reseal deck expansion joint (7261127) | LF | 362 | $138.13 | $144.00 | $60.00 | $175.00 |
| 0860 | Rip-rap (class B) (8041020) | TON | 35 | $225.90 | $165.00 | $150.00 | $175.00 |
| 0870 | Geotextile for erosion control under riprap(class 2)type B (8048205) | SY | 100 | $1.35 | $45.00 | $10.00 | $5.25 |
| 0880 | Premash W-beam strong post system WSP3 (8051050) | LF | 1,793.75 | $21.00 | $21.00 | $22.50 | $23.98 |
| 0890 | MT3 leading end treatment TL3 (8051151) | EACH | 22 | $2,561.50 | $2,561.50 | $3,200.00 | $4,054.28 |
| 0900 | MGS3 GR standard shoulder (8052100) | LF | 3,318.75 | $23.00 | $23.00 | $23.00 | $23.98 |
| 0910 | MGS3CS GR compressed shoulder (8052150) | LF | 925 | $29.00 | $29.00 | $28.50 | $34.26 |
| 0920 | Premash W-beam compressed SHLDR 9' post (8053001) | LF | 475 | $27.00 | $27.00 | $28.00 | $33.12 |
| 0930 | Premash thrie strong post guardrail (8053050) | LF | 175 | $32.00 | $32.00 | $38.00 | $34.26 |
| 0940 | Premash thriebeam bridge conn TBBC3 (8053250) | EACH | 8 | $1,800.00 | $1,800.00 | $2,800.00 | $2,284.10 |
| 0950 | Premash type T TL3 leading 50' (8057100) | EACH | 19 | $2,105.00 | $2,105.00 | $3,000.00 | $4,054.28 |
| 0960 | Permanent grassing for non-permitted resurfacing projects (8100102) | ACRE | 5.64 | $3,091.43 | $3,400.00 | $3,200.00 | $3,850.00 |
| 0970 | Temporary erosion control blanket (ecb) (8151110) | MSY | 0.10 | $2,489.45 | $8,350.00 | $2,500.00 | $9,150.00 |
| 0980 | Sediment tubes for ditch checks (8152007) | LF | 100 | $11.30 | $15.00 | $12.00 | $18.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
Every contract let that day: SCDOT letting of September 9, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.