SCDOT contract 2357431 bid tabulation
US 29 (MP 8.6 - 11.3) Safety Improvements/RSA US 29 (MP 14.4. Let by South Carolina DOT on August 12, 2025, Greenville, District 3. 3 bids received; low bid $14,381,508 by Palmetto Corp. of Conway.
- Owner
- South Carolina DOT
- Letting
- 12 AUG 2025
- Pay items
- 99
- Data through
- 13 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Palmetto Corp. of Conway | $14,381,508 | Low |
| 2 | Reeves Construction Company | $16,304,004 | +13% |
| 3 | Rogers Group, Inc. | $18,417,820 | +28% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Palmetto Corp. of Conway | 2. Reeves Construction Company | 3. Rogers Group, Inc. |
|---|---|---|---|---|---|---|
| 0010 | Mobilization (1031000) | LS | 1 | $715,000 | $775,000 | $919,500 |
| 0020 | Bonds and insurance (1032010) | LS | 1 | $285,000 | $267,500 | $555,000 |
| 0030 | Construction stakes, lines & grades (1050800) | EACH | 1 | $90,000 | $60,000 | $552,000 |
| 0040 | CPM progress schedule (1080300) | LS | 1 | $15,000 | $15,000 | $415,000 |
| 0050 | Selected clearing (2015005) | ACRE | 1 | $35,000 | $35,000 | $75,000 |
| 0060 | Removal & disposal of existing pavement (2023000) | SY | 2,245 | $75.00 | $95.00 | $79.00 |
| 0070 | Removal & disposal of existing asphalt pavement (2025000) | SY | 1,000 | $45.50 | $18.00 | $75.00 |
| 0080 | Site excavation (2031200) | LS | 1 | $1,280,000 | $1,075,000 | $975,000 |
| 0090 | Maintenance stone (3059900) | TON | 100 | $140.35 | $155.00 | $235.00 |
| 0100 | Liquid asphalt binder PG64-22 (4011004) | TON | 713 | $720.00 | $815.00 | $750.00 |
| 0110 | Full depth asph. pav. patching 10"unif (4012100) | SY | 6,150 | $105.45 | $145.00 | $190.00 |
| 0120 | Milling existing asphalt pavement 2.0" (4013120) | SY | 123,000 | $4.15 | $5.75 | $9.00 |
| 0130 | Asphalt surface course type B (4040320) | TON | 17,968 | $108.70 | $160.00 | $187.00 |
| 0140 | Traffic control (6011000) | LS | 1 | $2,135,000 | $1,750,000 | $1,650,000 |
| 0150 | Permanent construction signs (ground mounted) (6051120) | SF | 2,422 | $7.00 | $8.50 | $9.00 |
| 0160 | Pavement markings (temporary paint) 12"X18" white triangle yield bar (609136A) | LF | 150 | $1.00 | $3.25 | $3.25 |
| 0170 | 4" white broken lines -(gaps excluded)-fast dry paint (6240005) | LF | 31,000 | $0.15 | $0.20 | $0.18 |
| 0180 | 4" white solid lines (PVT. edge lines)-fast dry paint (6240010) | LF | 55,220 | $0.15 | $0.20 | $0.18 |
| 0190 | 8"white solid lines (crosswalk& channelization)fast dry paint (6240015) | LF | 32,080 | $0.50 | $0.65 | $0.28 |
| 0200 | 24" white solid lines (stop/diagonal lines)-fast dry paint (6240025) | LF | 35,500 | $0.50 | $2.00 | $1.00 |
| 0210 | White single arrow (left, straight, right)-fast dry paint (6240030) | EACH | 330 | $10.00 | $35.00 | $18.50 |
| 0220 | White word message "only"- fast dry paint (6240035) | EACH | 260 | $10.00 | $45.00 | $18.50 |
| 0230 | White combination arrow(STR.& RT.or STR.& LT.)fast dry paint (6240040) | EACH | 24 | $10.00 | $55.00 | $18.50 |
| 0240 | 4" yellow broken lines(gaps exc) - fast dry paint (6240105) | LF | 80 | $0.15 | $0.20 | $0.18 |
| 0250 | 4"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110) | LF | 11,100 | $0.15 | $0.20 | $0.18 |
| 0260 | 6" yellow solid line on curb/median - fast dry paint (6240112) | LF | 38,500 | $0.45 | $0.30 | $1.00 |
| 0270 | 24" yellow diagonal lines - fast dry paint (6240115) | LF | 700 | $1.00 | $3.00 | $0.55 |
| 0280 | 4" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005) | LF | 15,500 | $0.60 | $0.65 | $1.00 |
| 0290 | 4" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010) | LF | 27,610 | $0.60 | $0.65 | $0.55 |
| 0300 | 8" white solid lines thermoplastic - 125 mil. (6271015) | LF | 16,040 | $2.50 | $2.50 | $3.20 |
| 0310 | 12IN X 18IN white triang. yield bar (gaps exc)thermo-125MIL (6271023) | LF | 75 | $6.00 | $12.00 | $28.00 |
| 0320 | 24" white solid lines (stop/diag lines)-thermo.-125 mil (6271025) | LF | 17,750 | $6.50 | $9.00 | $8.45 |
| 0330 | White single arrows (LT, STRGHT, RT) thermo.-125 mil. (6271030) | EACH | 165 | $65.00 | $100.00 | $85.00 |
| 0340 | White word message "only" - thermoplastic - 125 mil. (6271035) | EACH | 130 | $75.00 | $125.00 | $85.00 |
| 0350 | White combination arrows(STR&RT.or STR& LT)thermo-125MIL (6271040) | EACH | 12 | $100.00 | $175.00 | $175.00 |
| 0360 | White U-turn arrow thermo- 125MIL (6271042) | EACH | 10 | $200.00 | $450.00 | $175.00 |
| 0370 | 4" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271064) | LF | 40 | $0.75 | $0.65 | $0.55 |
| 0380 | 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074) | LF | 5,550 | $0.65 | $0.65 | $0.55 |
| 0390 | 24" yellow solid lines - thermoplastic - 125 mil. (6271080) | LF | 350 | $7.00 | $10.00 | $8.50 |
| 0400 | Permanent clear pavement markers- mono-dir.- 4"X4" (6300005) | EACH | 600 | $6.00 | $9.00 | $8.50 |
| 0410 | Permanent yellow pavement markers BI-dir.- 4"X4" (6301100) | EACH | 350 | $6.00 | $9.00 | $8.45 |
| 0420 | Flat sheet, type III, fixed SZ. & MSG. sign (6510105) | SF | 160.75 | $12.00 | $25.00 | $45.00 |
| 0430 | Flat sheet, type XI, size determined by MSG, overhead (6510108) | SF | 463 | $47.85 | $95.00 | $57.50 |
| 0440 | Mounting assembly for F.S. sign erctd on span wire (6513015) | EACH | 40 | $327.01 | $400.00 | $385.00 |
| 0450 | U-section post for sign supports - 3P (6531210) | LF | 230 | $7.25 | $19.00 | $28.00 |
| 0460 | Barricade - permanent with type III sheeting (6584690) | LF | 18 | $45.00 | $30.00 | $60.00 |
| 0470 | Furnish & install 1.0" schedule 80 PVC conduit (6750275) | LF | 2,030 | $20.00 | $25.00 | $24.00 |
| 0480 | Furnish & install 2.0" schedule 80 PVC conduit (6750278) | LF | 2,610 | $18.00 | $22.00 | $21.50 |
| 0490 | Furnish & install 3.0" schedule 80 PVC conduit (675027C) | LF | 950 | $78.00 | $100.00 | $88.00 |
| 0500 | Furnish additional conduit within directional bore (675027Z) | LF | 1,620 | $6.48 | $8.50 | $7.65 |
| 0510 | Furnish & install 2" schedule 80 HDPE conduit (directional bored) (6760065) | LF | 90 | $35.00 | $45.00 | $39.50 |
| 0520 | Furnish & install 3" schedule 80 HDPE conduit (directional bored) (6760075) | LF | 1,620 | $35.00 | $45.00 | $39.50 |
| 0530 | Furnish & install no. 14 copper wire, 4 conductor - black (6770388) | LF | 4,470 | $5.11 | $6.50 | $6.25 |
| 0540 | Furnish & install no. 14 copper wire, 4 conductor - gray (6770389) | LF | 4,300 | $5.21 | $6.75 | $6.35 |
| 0550 | Furnish & install no. 14 copper wire, 8 conductor (black) (6770393) | LF | 27,140 | $5.40 | $7.00 | $6.55 |
| 0560 | Furnish & install no. 14 copper wire, 8 conductor (gray) (6770394) | LF | 7,320 | $5.70 | $7.00 | $6.75 |
| 0570 | Furnish & install electrical service for traffic signal (6800499) | EACH | 11 | $1,586.97 | $2,000.00 | $1,845.00 |
| 0580 | F&I-13"X24"X18"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD (6800518) | EACH | 23 | $831.17 | $1,000.00 | $995.00 |
| 0590 | F&I-17"X30"X24"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD (680052C) | EACH | 20 | $1,051.00 | $1,250.00 | $1,250.00 |
| 0600 | Furnish & install 13" X 32' steel strain pole and foundation (682505D) | EACH | 14 | $15,000 | $19,500 | $17,650 |
| 0610 | Furnish & install 3/8" galvanized steel cable (6825092) | LF | 4,870 | $9.14 | $12.00 | $10.75 |
| 0620 | Furnish & install 10' break- away alum pedestal pole and base (6825484) | EACH | 31 | $1,884.50 | $2,250.00 | $2,215.00 |
| 0630 | F&I - contr 332/336 cabinet assembly - base mounted 001 (6845511) | EACH | 11 | $23,800 | $30,000 | $28,000 |
| 0640 | Furnish and install battery back-UP including foundation (6845518) | EACH | 4 | $9,800.00 | $12,500 | $11,500 |
| 0650 | Furnish & install - 12" 5 (6865710) | EACH | 5 | $1,370.25 | $1,800.00 | $1,600.00 |
| 0660 | Furnish & install -12" 4 (6865720) | EACH | 25 | $1,126.65 | $1,250.00 | $1,325.00 |
| 0670 | Furnish & install - 12" 3 (6865723) | EACH | 125 | $800.00 | $1,000.00 | $935.00 |
| 0680 | F&I - 1-way-1SECT.hand/man countdown pedestrian signal head (6865782) | EACH | 74 | $896.10 | $1,000.00 | $1,025.00 |
| 0690 | F&I-ped push but.solid state W/ tone assem 9"X15"&sign (R- 10-3E or R10-4A) (6865797) | EACH | 74 | $1,500.00 | $1,750.00 | $1,800.00 |
| 0700 | Furnish & install internally illuminated street name sign, including mast arm mounting (6865823) | EACH | 9 | $7,500.00 | $9,500.00 | $8,750.00 |
| 0710 | Backplate W/ retrorefl.borders for traff. sig. (6865834) | EACH | 155 | $330.00 | $425.00 | $375.00 |
| 0720 | Removal,salvage,&disp.of existing traf. signal equipment (6885991) | EACH | 1 | $25,900 | $32,500 | $30,400 |
| 0730 | F&I - video detection system W/ one camera, hardware & lead-in (6886040) | EACH | 5 | $35,000 | $45,000 | $40,850 |
| 0740 | Install video detection system including lead-in (6886041) | EACH | 7 | $6,900.00 | $9,000.00 | $8,100.00 |
| 0750 | Furnish & install video detection camera W/ hardware & lead-in (6886042) | EACH | 5 | $6,850.00 | $8,750.00 | $8,050.00 |
| 0760 | Remove foundation for steel strain pole - 18" below grade (6887941) | EACH | 23 | $1,750.00 | $2,250.00 | $2,050.00 |
| 0770 | Furnish & install concrete cabinet foundation (6887951) | EACH | 11 | $1,479.00 | $1,750.00 | $1,900.00 |
| 0780 | Powdercoating per mast arm over base (6888166) | EACH | 11 | $2,000.00 | $2,500.00 | $2,275.00 |
| 0790 | Decorative option per mast arm (6888168) | EACH | 11 | $3,500.00 | $4,500.00 | $4,050.00 |
| 0800 | Design, furnish & install steel pole with mast arm including foundation (6888179) | EACH | 11 | $40,000 | $50,000 | $47,250 |
| 0810 | Powdercoating option for 10' aluminum pedestal pole (6888194) | EACH | 7 | $350.00 | $450.00 | $410.00 |
| 0820 | 18" smooth wall pipe (7143618) | LF | 50 | $400.00 | $450.00 | $395.00 |
| 0830 | Catch basin -type 16 (7191605) | EACH | 2 | $13,000 | $16,000 | $14,200 |
| 0840 | Drop inlet (24" X 24") (7192010) | EACH | 2 | $9,500.00 | $11,500 | $9,850.00 |
| 0850 | Drop inlet (24" X 24") top only (7196181) | EACH | 2 | $3,000.00 | $3,750.00 | $3,450.00 |
| 0860 | Junction box - convert drop inlet 24" X 24" (7198310) | EACH | 2 | $5,000.00 | $6,000.00 | $5,650.00 |
| 0870 | Junction box - convert CB T-9 (7198370) | EACH | 1 | $5,000.00 | $6,000.00 | $5,850.00 |
| 0880 | Concrete curb and gutter(1'-6") vertical face (7203110) | LF | 650 | $110.00 | $50.00 | $45.00 |
| 0890 | Concrete curb and gutter(2'-0") vertical face (7203210) | LF | 1,900 | $73.20 | $50.00 | $47.00 |
| 0900 | Concrete sidewalk(4" uniform) (7204100) | SY | 9,510 | $105.50 | $120.00 | $110.00 |
| 0910 | Detectable warning material (7204900) | SF | 1,565 | $45.00 | $75.00 | $68.00 |
| 0920 | Concrete median (7206000) | SY | 8,200 | $140.00 | $150.00 | $165.00 |
| 0930 | Pedestrian ramp construction (7209000) | SY | 2,360 | $235.90 | $275.00 | $248.00 |
| 0940 | Permanent grassing for small projects (8100101) | ACRE | 4.50 | $3,650.00 | $4,000.00 | $4,500.00 |
| 0950 | Inlet structure filter - type F (weighted) (8152004) | LF | 240 | $10.50 | $21.00 | $13.50 |
| 0960 | Silt fence (8153000) | LF | 9,975 | $3.75 | $4.00 | $6.00 |
| 0970 | Replace/repair silt fence (8153090) | LF | 997.50 | $5.00 | $7.00 | $6.00 |
| 0980 | Removal of silt retained by silt fence (8154050) | LF | 2,493.75 | $2.00 | $5.00 | $2.25 |
| 0990 | Stabilized construction entrance (8156490) | SY | 2,475 | $30.00 | $8.50 | $52.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
Every contract let that day: SCDOT letting of August 12, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.