| 0010 | Mobilization (1031000) | LS | 1 | $68,000 | $195,000 |
| 0020 | Mobilization - subcontractor (1031100) | LS | 1 | $20,000 | $35,000 |
| 0030 | Bonds and insurance (1032010) | LS | 1 | $40,000 | $10,000 |
| 0040 | Construction stakes, lines & grades (1050800) | EACH | 1 | $35,000 | $39,000 |
| 0050 | Utility staking (1052001) | LS | 1 | $6,250.00 | $13,000 |
| 0060 | CPM progress schedule (1080300) | LS | 1 | $10,500 | $15,000 |
| 0070 | Clearing & grubbing within roadway (2012000) | LS | 1 | $175,000 | $195,000 |
| 0080 | Unclassified excavation (2031000) | CY | 249 | $54.00 | $295.00 |
| 0090 | Borrow excavation (2033000) | CY | 2,566 | $65.00 | $76.00 |
| 0100 | Fine grading (2081001) | SY | 1,560 | $13.50 | $16.00 |
| 0110 | Liquid asphalt binder PG64-22 (4011004) | TON | 60.10 | $650.00 | $750.00 |
| 0120 | Milling existing asphalt pavement 2.0" (4013120) | SY | 2,400 | $12.50 | $16.00 |
| 0130 | Asphalt base course - type A (4020310) | TON | 595.70 | $225.00 | $179.00 |
| 0140 | Asphalt intermediate course type B (4030320) | TON | 249.30 | $256.00 | $246.00 |
| 0150 | Asphalt surface course type B (4040320) | TON | 358.50 | $210.00 | $192.00 |
| 0160 | Traffic control (6011000) | LS | 1 | $142,000 | $300,000 |
| 0170 | Permanent construction signs (ground mounted) (6051120) | SF | 460 | $6.35 | $10.00 |
| 0180 | Construction zone electric changeable message sign (trailer (6062000) | EACH | 2 | $5,000.00 | $22,500 |
| 0190 | Temporary clear pavement markers mono-dir.- 4"X4" (6092100) | EACH | 75 | $7.50 | $7.50 |
| 0200 | Temporary yellow pavement markers BI-dir.- 4"X4" (6092155) | EACH | 15 | $7.50 | $7.50 |
| 0210 | 4" white broken lines -(gaps excluded)-fast dry paint (6240005) | LF | 1,400 | $0.20 | $0.25 |
| 0220 | 4" white solid lines (PVT. edge lines)-fast dry paint (6240010) | LF | 4,600 | $0.20 | $0.25 |
| 0230 | 24" white solid lines (stop/diagonal lines)-fast dry paint (6240025) | LF | 280 | $2.00 | $0.26 |
| 0240 | White single arrow (left, straight, right)-fast dry paint (6240030) | EACH | 16 | $25.00 | $32.90 |
| 0250 | White word message "only"- fast dry paint (6240035) | EACH | 16 | $25.00 | $32.90 |
| 0260 | 4"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110) | LF | 8,000 | $0.20 | $0.26 |
| 0270 | 4" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005) | LF | 700 | $1.00 | $1.32 |
| 0280 | 4" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010) | LF | 2,300 | $0.75 | $0.99 |
| 0290 | 24" white solid lines (stop/diag lines)-thermo.-125 mil (6271025) | LF | 140 | $15.00 | $19.74 |
| 0300 | White single arrows (LT, STRGHT, RT) thermo.-125 mil. (6271030) | EACH | 8 | $100.00 | $131.59 |
| 0310 | White word message "only" - thermoplastic - 125 mil. (6271035) | EACH | 8 | $100.00 | $131.59 |
| 0320 | 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074) | LF | 4,000 | $0.75 | $0.99 |
| 0330 | Permanent clear pavement markers- mono-dir.- 4"X4" (6300005) | EACH | 50 | $7.50 | $9.87 |
| 0340 | Permanent yellow pavement markers BI-dir.- 4"X4" (6301100) | EACH | 10 | $7.50 | $9.87 |
| 0350 | Flat sheet, type III, fixed SZ. & MSG. sign (6510105) | SF | 153.07 | $30.00 | $39.48 |
| 0360 | Flat sheet, type III, size determined by MSG (6510106) | SF | 8.25 | $35.00 | $46.06 |
| 0370 | Mounting assembly for F.S. sign erctd on span wire (6513015) | EACH | 1 | $500.00 | $657.93 |
| 0380 | U-section post for sign supports - 2P (6531205) | LF | 40 | $18.00 | $23.69 |
| 0390 | U-section post for sign supports - 3P (6531210) | LF | 262 | $20.00 | $26.32 |
| 0400 | Furnish & install 1.0" schedule 80 PVC conduit (6750275) | LF | 100 | $20.00 | $28.95 |
| 0410 | Furnish & install 2.0" schedule 80 PVC conduit (6750278) | LF | 1,190 | $20.00 | $28.95 |
| 0420 | Furnish & install 3.0" schedule 80 PVC conduit (675027C) | LF | 30 | $50.00 | $72.37 |
| 0430 | Furnish & install no. 14 copper wire, 4 conductor - gray (6770389) | LF | 2,610 | $5.20 | $7.53 |
| 0440 | Furnish & install no. 14 copper wire, 8 conductor (black) (6770393) | LF | 360 | $8.00 | $11.58 |
| 0450 | Furnish & install no. 14 copper wire, 12 conductor (black) (6770395) | LF | 290 | $12.50 | $18.09 |
| 0460 | Furnish & instl no. 14 copper wire,1-conductor for loop wire (6770413) | LF | 2,040 | $3.00 | $4.34 |
| 0470 | Sawcut for loop detector (6780495) | LF | 990 | $15.00 | $21.71 |
| 0480 | Furnish & install electrical service for traffic signal (6800499) | EACH | 1 | $3,000.00 | $4,342.38 |
| 0490 | F&I-13"X24"X18"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD (6800518) | EACH | 11 | $1,200.00 | $1,736.95 |
| 0500 | F&I-17"X30"X24"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD (680052C) | EACH | 1 | $4,000.00 | $5,789.83 |
| 0510 | Furnish & install 13" X 32' steel strain pole and foundation (682505D) | EACH | 4 | $18,000 | $26,054 |
| 0520 | Furnish & install 3/8" galvanized steel cable (6825092) | LF | 660 | $10.00 | $14.47 |
| 0530 | F&I - contr 332/336 cabinet assembly - base mounted 001 (6845511) | EACH | 1 | $25,000 | $36,186 |
| 0540 | Furnish & install - 12" 5 (6865710) | EACH | 1 | $2,500.00 | $3,618.65 |
| 0550 | Furnish & install -12" 4 (6865720) | EACH | 1 | $2,500.00 | $3,618.65 |
| 0560 | Furnish & install - 12" 3 (6865723) | EACH | 5 | $2,000.00 | $2,894.92 |
| 0570 | F&I-ped push but.solid state W/ tone assem 9"X15"&sign (R- 10-3E or R10-4A) (6865797) | EACH | 4 | $900.00 | $1,302.71 |
| 0580 | Backplate W/ retrorefl.borders for traff. sig. (6865834) | EACH | 7 | $500.00 | $723.73 |
| 0590 | Furnish & install concrete cabinet foundation (6887951) | EACH | 1 | $1,800.00 | $2,605.42 |
| 0600 | 15" smooth wall pipe (7143615) | LF | 8 | $661.08 | $757.90 |
| 0610 | 18" smooth wall pipe (7143618) | LF | 8 | $671.30 | $757.90 |
| 0620 | Cleaning existing pipe (7149999) | LF | 250 | $15.70 | $65.79 |
| 0630 | Drop inlet type 125 double 4'X4' box (719125D) | EACH | 1 | $12,056 | $23,672 |
| 0640 | Junction box - convert drop inlet 36" X 36" (7198322) | EACH | 1 | $7,578.76 | $12,540 |
| 0650 | Rip-rap (class A) (8041010) | TON | 50 | $234.26 | $210.34 |
| 0660 | Rip-rap (class B) (8041020) | TON | 30 | $235.95 | $283.67 |
| 0670 | Geotextile for erosion control under riprap(class 2)type D (8048215) | SY | 200 | $7.91 | $28.09 |
| 0680 | Permanent cover (8100100) | ACRE | 0.80 | $1,600.00 | $2,105.40 |
| 0690 | Temporary cover (8100200) | ACRE | 1.60 | $1,425.00 | $1,875.11 |
| 0700 | Fertilizer (nitrogen) (8104005) | LB | 80 | $5.00 | $6.58 |
| 0710 | Fertilizer (phosphoric acid) (8104010) | LB | 80 | $5.00 | $6.58 |
| 0720 | Fertilizer (potash) (8104015) | LB | 80 | $5.00 | $6.58 |
| 0730 | Agricultural granular lime (8105005) | LB | 1,600 | $0.40 | $0.53 |
| 0740 | Selective watering (8109050) | GAL | 54,300 | $0.09 | $0.12 |
| 0750 | Mowing (8109901) | ACRE | 4.80 | $525.00 | $690.83 |
| 0760 | Turf reinforcement matting (TRM) type 1 (8151101) | MSY | 1 | $3,800.00 | $5,000.31 |
| 0770 | Temporary erosion control blanket (ecb) (8151110) | MSY | 2.20 | $1,600.00 | $2,105.40 |
| 0780 | Hydraulic erosion control product (hecp) - type 1 (8151201) | ACRE | 2.40 | $1,300.00 | $1,710.63 |
| 0790 | Sediment tubes for ditch checks (8152007) | LF | 320 | $15.00 | $19.74 |
| 0800 | Silt fence (8153000) | LF | 1,090 | $3.00 | $3.95 |
| 0810 | Cleaning silt basins (8154010) | CY | 10 | $229.45 | $328.97 |
| 0820 | Inlet filter cleaning (8154155) | EACH | 3 | $152.96 | $657.93 |
| 0830 | Inlet structure filter - type B (8156210) | EACH | 2 | $539.76 | $328.97 |
| 0840 | Inlet structure filter - type A (8156219) | LF | 80 | $8.55 | $13.16 |
| 0850 | Aggregate no.5 or 57 for erosion control (8156410) | TON | 20 | $103.08 | $274.09 |
| 0860 | Stabilized construction entrance (8156490) | SY | 550 | $18.56 | $47.37 |