| 0010 | Mobilization (1031000) | LS | 1 | $543,500 | $175,000 | $686,500 |
| 0020 | Bonds and insurance (1032010) | LS | 1 | $125,000 | $75,000 | $412,150 |
| 0030 | Removal & disposal of existing pavement (2023000) | SY | 660 | $42.25 | $52.00 | $40.00 |
| 0040 | Removal of exist. guardrail (2027801) | LF | 400 | $1.05 | $3.50 | $1.05 |
| 0050 | Unclassified excavation (2031000) | CY | 200 | $60.00 | $63.00 | $110.00 |
| 0060 | Borrow excavation (2033000) | CY | 1,242 | $85.00 | $100.00 | $158.00 |
| 0080 | Excavation for shoulder paving (2036000) | STA | 352.18 | $62.00 | $200.00 | $222.00 |
| 0090 | Hauling of excavated shoulder material (2072000) | STA | 352.18 | $87.50 | $150.00 | $212.00 |
| 0100 | Maintenance stone (3059900) | TON | 520 | $80.00 | $86.00 | $165.00 |
| 0110 | Cement modified recycled base (12" unif)-curing method B (3063242) | SY | 10,743 | $11.50 | $11.00 | $22.00 |
| 0120 | Portland cement for cement modified recycled base course (3064000) | TON | 430 | $250.00 | $290.00 | $275.00 |
| 0130 | HMA shoulder widening course (3104000) | TON | 2,347.84 | $75.00 | $100.00 | $117.00 |
| 0140 | Liquid asphalt binder PG64-22 (4011004) | TON | 2,123.34 | $700.00 | $675.00 | $625.00 |
| 0150 | Full depth asph. pav. patching 4" unif. (4012040) | SY | 1,500 | $61.40 | $57.00 | $60.00 |
| 0160 | Full depth asph. pav. patching 8" unif (4012080) | SY | 27,500 | $85.75 | $89.00 | $85.00 |
| 0170 | Milling existing asphalt pavement 1.75" (4013117) | SY | 68,637 | $3.05 | $2.90 | $3.70 |
| 0180 | Milling existing asphalt pavement 2.0" (4013120) | SY | 213,543 | $2.25 | $2.75 | $4.35 |
| 0190 | Milling existing asphalt pavement (variable) (4013990) | SY | 30,403 | $8.50 | $10.00 | $10.75 |
| 0200 | Asphalt surface course type B (4040320) | TON | 23,941.16 | $84.50 | $112.00 | $112.15 |
| 0210 | Asphalt surface course type C (4040340) | TON | 10,433.69 | $98.00 | $127.00 | $137.65 |
| 0220 | Driveway paving-surface type C (4047220) | TON | 505.70 | $205.00 | $290.00 | $335.00 |
| 0230 | Traffic control (6011000) | LS | 1 | $860,000 | $912,792 | $1,017,250 |
| 0240 | Permanent construction signs (ground mounted) (6051120) | SF | 7,980 | $6.35 | $7.00 | $6.25 |
| 0250 | 4" white broken lines -(gaps excluded)-fast dry paint (6240005) | LF | 58,120 | $0.13 | $0.14 | $0.13 |
| 0260 | 4" white solid lines (PVT. edge lines)-fast dry paint (6240010) | LF | 139,300 | $0.13 | $0.14 | $0.13 |
| 0270 | 8"white solid lines (crosswalk& channelization)fast dry paint (6240015) | LF | 24,458 | $0.13 | $0.14 | $0.13 |
| 0280 | 24" white solid lines (stop/diagonal lines)-fast dry paint (6240025) | LF | 4,974 | $0.53 | $0.60 | $0.55 |
| 0290 | White single arrow (left, straight, right)-fast dry paint (6240030) | EACH | 104 | $15.75 | $17.00 | $15.10 |
| 0300 | White single bike lane arrow (LT, straight, RT)-fast dry paint (6240031) | EACH | 4 | $15.75 | $17.00 | $15.10 |
| 0310 | White word message "only"- fast dry paint (6240035) | EACH | 28 | $15.75 | $17.00 | $15.10 |
| 0320 | White combination arrow(STR.& RT.or STR.& LT.)fast dry paint (6240040) | EACH | 8 | $15.75 | $17.00 | $15.10 |
| 0330 | White lane drop arrow (left or right)-fast dry paint (6240043) | EACH | 8 | $15.75 | $17.00 | $15.10 |
| 0340 | Bike lane symbol - fast dry paint (6240055) | EACH | 4 | $15.75 | $17.00 | $15.10 |
| 0350 | 4" yellow broken lines(gaps exc) - fast dry paint (6240105) | LF | 20,400 | $0.13 | $0.14 | $0.13 |
| 0360 | 4"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110) | LF | 782,008 | $0.13 | $0.14 | $0.13 |
| 0370 | 4" white broken lines -(gaps excluded) - epoxy paint slow cure (6261005) | LF | 80 | $3.15 | $3.50 | $3.05 |
| 0380 | 4" white solid lines (PVT. edge lines) epoxy paint slow cure (6261010) | LF | 388 | $3.15 | $3.50 | $3.05 |
| 0390 | 4" yellow broken lines(gaps exc) epoxy paint slow cure (6261105) | LF | 80 | $3.15 | $3.50 | $3.05 |
| 0400 | 4"yellow solid lines- PVT.edge&no passing zone - epoxy paint slow cure (6261110) | LF | 748 | $3.15 | $3.50 | $3.05 |
| 0410 | 4" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005) | LF | 14,800 | $0.90 | $1.00 | $0.90 |
| 0420 | 4" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010) | LF | 68,224 | $0.55 | $0.60 | $0.55 |
| 0430 | 8" white solid lines thermoplastic - 125 mil. (6271015) | LF | 12,229 | $2.65 | $2.85 | $2.55 |
| 0440 | 12IN X 18IN white triang. yield bar (gaps exc)thermo-125MIL (6271023) | LF | 20 | $26.35 | $28.75 | $25.15 |
| 0450 | 24" white solid lines (stop/diag lines)-thermo.-125 mil (6271025) | LF | 2,472 | $8.95 | $9.75 | $8.55 |
| 0460 | White single arrows (LT, STRGHT, RT) thermo.-125 mil. (6271030) | EACH | 52 | $89.50 | $97.00 | $85.45 |
| 0470 | White word message "only" - thermoplastic - 125 mil. (6271035) | EACH | 14 | $105.25 | $115.00 | $100.50 |
| 0480 | White word message "school" -thermoplastic - 125 mil. (6271037) | EACH | 2 | $158.00 | $172.00 | $150.75 |
| 0490 | White combination arrows(STR&RT.or STR& LT)thermo-125MIL (6271040) | EACH | 4 | $158.00 | $172.00 | $150.75 |
| 0500 | White lane drop arrow(LT.or RT.)thermo-125MIL (6271043) | EACH | 4 | $210.00 | $229.00 | $201.00 |
| 0510 | 4" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271064) | LF | 5,100 | $0.55 | $0.60 | $0.55 |
| 0520 | 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074) | LF | 138,951 | $0.55 | $0.60 | $0.55 |
| 0530 | Bike lane symbol -preformed thermo - 60MIL (6280055) | EACH | 2 | $263.50 | $285.00 | $150.75 |
| 0540 | Bike lane arrow - preformed thermo - 60MIL (6280056) | EACH | 2 | $158.00 | $172.00 | $150.75 |
| 0550 | Permanent clear pavement markers- mono-dir.- 4"X4" (6300005) | EACH | 778 | $6.35 | $6.90 | $6.05 |
| 0560 | Permanent yellow pavement markers mono-dir.- 4"X 4" perm. yel. (6301005) | EACH | 394 | $6.35 | $6.90 | $6.05 |
| 0570 | Permanent yellow pavement markers BI-dir.- 4"X4" (6301100) | EACH | 1,828 | $6.35 | $6.90 | $6.05 |
| 0580 | Milled-in rumble strip (6321000) | MI | 6.42 | $525.00 | $570.00 | $2,615.00 |
| 0590 | Furnish & install 1.0" schedule 80 PVC conduit (6750275) | LF | 2,730 | $26.05 | $28.00 | $25.55 |
| 0600 | Furnish & instl no. 14 copper wire,1-conductor for loop wire (6770413) | LF | 49,010 | $0.60 | $0.65 | $0.60 |
| 0610 | Sawcut for loop detector (6780495) | LF | 17,810 | $10.00 | $10.75 | $9.80 |
| 0620 | F&I-13"X24"X18"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD (6800518) | EACH | 39 | $740.00 | $800.00 | $725.00 |
| 0630 | Temporary adjustment of traffic signal equipment (6885993) | EACH | 13 | $5,790.00 | $6,300.00 | $5,675.00 |
| 0640 | Concrete sidewalk(4" uniform) (7204100) | SY | 410 | $73.75 | $78.00 | $90.00 |
| 0641 | Concrete sidewalk(4" uniform) with integral curb (7204150) | SY | 75 | $148.00 | $114.00 | $115.00 |
| 0650 | Detectable warning material (7204900) | SF | 87.50 | $58.00 | $57.00 | $55.00 |
| 0660 | Pedestrian ramp construction (7209000) | SY | 175 | $110.50 | $172.00 | $185.00 |
| 0670 | Surface applied detectable warning (7209100) | SF | 90 | $58.00 | $74.00 | $55.00 |
| 0680 | Premash reset W-beam strong post system (8051900) | LF | 1,575 | $18.00 | $19.50 | $17.25 |
| 0690 | Premash type T TL3 leading 50' (8057100) | EACH | 8 | $4,315.00 | $4,900.00 | $4,150.00 |
| 0700 | Permanent grassing for non-permitted resurfacing projects (8100102) | ACRE | 5.36 | $4,475.00 | $4,000.00 | $3,375.00 |