| 0010 | Mobilization (1031000) | LS | 1 | $480,000 | $582,500 | $482,450 |
| 0020 | Bonds and insurance (1032010) | LS | 1 | $230,000 | $233,000 | $80,000 |
| 0030 | Railroad insurance and flagging CSX (1071403) | LS | 1 | $30,000 | $19,200 | $20,000 |
| 0040 | Removal & disposal of existing pavement (2023000) | SY | 1,845 | $35.45 | $47.00 | $41.00 |
| 0050 | Removal & disposal of existing curb (2024100) | LF | 4,400 | $9.75 | $16.00 | $15.00 |
| 0060 | Removal of exist. guardrail (2027801) | LF | 1,100 | $1.65 | $1.65 | $1.65 |
| 0070 | Unclassified excavation (2031000) | CY | 49 | $192.50 | $98.00 | $407.75 |
| 0080 | Borrow excavation (2033000) | CY | 2,754 | $44.70 | $62.00 | $98.70 |
| 0090 | Excavation for shoulder paving (2036000) | STA | 1,365.40 | $37.05 | $66.00 | $57.25 |
| 0100 | Hauling of excavated shoulder material (2072000) | STA | 1,365.40 | $72.40 | $43.00 | $170.15 |
| 0110 | Maintenance stone (3059900) | TON | 83.75 | $130.00 | $90.00 | $52.00 |
| 0120 | HMA shoulder widening course (3104000) | TON | 9,215.21 | $69.20 | $81.00 | $91.25 |
| 0130 | Liquid asphalt binder PG64-22 (4011004) | TON | 3,542.00 | $595.00 | $662.00 | $622.25 |
| 0140 | Full depth asph. pav. patching 6" unif. (4012060) | SY | 3,625 | $53.80 | $71.00 | $67.50 |
| 0150 | Full depth asph. pav. patching 8" unif (4012080) | SY | 4,750 | $78.95 | $86.00 | $98.50 |
| 0160 | Milling existing asphalt pavement 2.0" (4013120) | SY | 308,845 | $2.50 | $1.75 | $4.00 |
| 0170 | Milling existing asphalt pavement (variable) (4013990) | SY | 52,500 | $3.70 | $1.00 | $7.90 |
| 0180 | Asphalt intermediate course type B (4030320) | TON | 8,363.52 | $71.15 | $76.00 | $92.70 |
| 0190 | Asphalt surface course type B (4040320) | TON | 23,355.68 | $78.65 | $80.00 | $92.70 |
| 0200 | Asphalt surface course type C (4040340) | TON | 18,613.91 | $78.95 | $80.00 | $95.95 |
| 0210 | Driveway paving-surface type C (4047220) | TON | 2,736 | $166.00 | $200.00 | $300.00 |
| 0220 | Traffic control (6011000) | LS | 1 | $605,150 | $294,800 | $845,150 |
| 0230 | Permanent construction signs (ground mounted) (6051120) | SF | 2,860 | $5.75 | $5.75 | $5.75 |
| 0240 | 4" white broken lines -(gaps excluded)-fast dry paint (6240005) | LF | 35,690 | $0.11 | $0.11 | $0.11 |
| 0250 | 4" white solid lines (PVT. edge lines)-fast dry paint (6240010) | LF | 537,170 | $0.10 | $0.10 | $0.10 |
| 0260 | 8"white solid lines (crosswalk& channelization)fast dry paint (6240015) | LF | 6,000 | $0.01 | $0.01 | $0.01 |
| 0270 | 24" white solid lines (stop/diagonal lines)-fast dry paint (6240025) | LF | 9,510 | $0.01 | $0.01 | $0.01 |
| 0280 | White single arrow (left, straight, right)-fast dry paint (6240030) | EACH | 78 | $0.01 | $0.01 | $0.01 |
| 0290 | White word message "only"- fast dry paint (6240035) | EACH | 63 | $0.01 | $0.01 | $0.01 |
| 0300 | White combination arrow(STR.& RT.or STR.& LT.)fast dry paint (6240040) | EACH | 6 | $0.01 | $0.01 | $0.01 |
| 0310 | Railroad crossing symbols - fast dry paint (6240045) | EACH | 6 | $0.01 | $0.01 | $0.01 |
| 0320 | 4" yellow broken lines(gaps exc) - fast dry paint (6240105) | LF | 42,650 | $0.11 | $0.11 | $0.11 |
| 0330 | 4"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110) | LF | 388,480 | $0.10 | $0.10 | $0.10 |
| 0340 | 6" yellow solid line on curb/median - fast dry paint (6240112) | LF | 750 | $2.00 | $2.00 | $2.00 |
| 0350 | 24" yellow diagonal lines - fast dry paint (6240115) | LF | 3,600 | $0.01 | $0.01 | $0.01 |
| 0360 | 4" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005) | LF | 11,410 | $0.43 | $0.43 | $0.43 |
| 0370 | 6" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271007) | LF | 500 | $1.00 | $1.00 | $1.00 |
| 0380 | 4" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010) | LF | 116,390 | $0.41 | $0.41 | $0.41 |
| 0390 | 6" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271012) | LF | 65,370 | $0.63 | $0.63 | $0.63 |
| 0400 | 8" white solid lines thermoplastic - 125 mil. (6271015) | LF | 2,000 | $4.00 | $4.00 | $4.00 |
| 0410 | 12IN X 18IN white triang. yield bar (gaps exc)thermo-125MIL (6271023) | LF | 15 | $34.00 | $34.00 | $34.00 |
| 0420 | 24" white solid lines (stop/diag lines)-thermo.-125 mil (6271025) | LF | 3,280 | $12.00 | $12.00 | $12.00 |
| 0430 | White single arrows (LT, STRGHT, RT) thermo.-125 mil. (6271030) | EACH | 26 | $140.00 | $140.00 | $140.00 |
| 0440 | White word message "only" - thermoplastic - 125 mil. (6271035) | EACH | 21 | $150.00 | $150.00 | $150.00 |
| 0450 | White combination arrows(STR&RT.or STR& LT)thermo-125MIL (6271040) | EACH | 2 | $200.00 | $200.00 | $200.00 |
| 0460 | Railroad crossing symbols - thermoplastic - 125 mil. (6271045) | EACH | 2 | $600.00 | $600.00 | $600.00 |
| 0470 | 4" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271064) | LF | 13,300 | $0.43 | $0.43 | $0.43 |
| 0480 | 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074) | LF | 142,305 | $0.41 | $0.41 | $0.41 |
| 0490 | 24" yellow solid lines - thermoplastic - 125 mil. (6271080) | LF | 1,200 | $12.00 | $12.00 | $12.00 |
| 0500 | Bike lane symbol -preformed thermo - 60MIL (6280055) | EACH | 12 | $315.00 | $315.00 | $315.00 |
| 0510 | Bike lane arrow - preformed thermo - 60MIL (6280056) | EACH | 12 | $150.00 | $150.00 | $150.00 |
| 0520 | Permanent clear pavement markers- mono-dir.- 4"X4" (6300005) | EACH | 560 | $4.00 | $4.00 | $4.00 |
| 0530 | Permanent yellow pavement markers mono-dir.- 4"X 4" perm. yel. (6301005) | EACH | 510 | $4.00 | $4.00 | $4.00 |
| 0540 | Permanent yellow pavement markers BI-dir.- 4"X4" (6301100) | EACH | 1,695 | $4.00 | $4.00 | $4.00 |
| 0550 | Milled-in rumble strip (6321000) | MI | 24.79 | $500.00 | $500.00 | $500.00 |
| 0560 | Furnish & install 1.0" schedule 80 PVC conduit (6750275) | LF | 465 | $17.50 | $17.75 | $17.75 |
| 0570 | Furnish & install 2.0" schedule 80 PVC conduit (6750278) | LF | 3,075 | $18.00 | $18.75 | $18.75 |
| 0580 | Furnish & install 2" schedule 80 HDPE conduit (directional bored) (6760065) | LF | 125 | $35.00 | $28.00 | $28.00 |
| 0590 | Furnish & install no. 14 copper wire, 4 conductor - gray (6770389) | LF | 3,200 | $5.21 | $5.30 | $5.30 |
| 0600 | Furnish & install no. 14 copper wire, 8 conductor (gray) (6770394) | LF | 125 | $5.70 | $5.55 | $5.55 |
| 0610 | Furnish & instl no. 14 copper wire,1-conductor for loop wire (6770413) | LF | 11,250 | $1.15 | $1.25 | $1.25 |
| 0620 | Sawcut for loop detector (6780495) | LF | 3,625 | $9.61 | $9.50 | $9.50 |
| 0630 | F&I-12"X12"X12"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD (6800508) | EACH | 25 | $596.42 | $620.00 | $620.00 |
| 0640 | F&I-13"X24"X18"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD (6800518) | EACH | 5 | $831.17 | $850.00 | $850.00 |
| 0650 | Adjust drop inlet adjust D. I. (7197130) | EACH | 1 | $2,350.00 | $2,200.00 | $2,500.00 |
| 0660 | Catch basin T-17 (convert C.B. type 5) (7198291) | EACH | 36 | $5,680.00 | $4,750.00 | $6,000.00 |
| 0670 | Concrete curb and gutter(1'-6") vertical face (7203110) | LF | 4,400 | $38.10 | $38.00 | $30.00 |
| 0680 | Concrete driveway(6" uniform) (7205000) | SY | 1,000 | $112.90 | $115.00 | $82.00 |
| 0690 | Concrete median (7206000) | SY | 200 | $112.95 | $130.00 | $78.00 |
| 0700 | Premash W-beam strong post system WSP3 (8051050) | LF | 600 | $22.00 | $22.00 | $22.00 |
| 0710 | MT3 leading end treatment TL3 (8051151) | EACH | 8 | $3,100.00 | $3,100.00 | $3,100.00 |
| 0720 | Premash thrie with base PL 6.25 space (8051207) | LF | 100 | $105.00 | $105.00 | $105.00 |
| 0730 | Premash thrie strong post guardrail (8053050) | LF | 100 | $38.00 | $38.00 | $38.00 |
| 0740 | Premash thriebeam bridge conn TBBC3 (8053250) | EACH | 8 | $2,700.00 | $2,700.00 | $2,700.00 |
| 0750 | Permanent grassing for non-permitted resurfacing projects (8100102) | ACRE | 16.70 | $3,000.00 | $3,300.00 | $2,750.00 |