SCDOT contract 4573560 bid tabulation
2026 Williamsburg Rehab/Reconstruction. Let by South Carolina DOT on September 9, 2025, Williamsburg, District 5. 5 bids received; low bid $9,247,487 by Coastal Asphalt, LLC.
- Owner
- South Carolina DOT
- Letting
- 09 SEP 2025
- Pay items
- 43
- Data through
- 13 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Coastal Asphalt, LLC | $9,247,487 | Low |
| 2 | Palmetto Corp. of Conway | $9,850,412 | +7.0% |
| 3 | King Asphalt, Inc. | $10,938,074 | +18% |
| 4 | C.R. Jackson, Inc. | $11,660,171 | +26% |
| 5 | L. Dean Weaver Company LLC | $12,690,481 | +37% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Coastal Asphalt, LLC | 2. Palmetto Corp. of Conway | 3. King Asphalt, Inc. | 4. C.R. Jackson, Inc. | 5. L. Dean Weaver Company LLC |
|---|---|---|---|---|---|---|---|---|
| 0010 | Mobilization (1031000) | LS | 1 | $195,000 | $238,915 | $370,000 | $583,000 | $615,000 |
| 0020 | Bonds and insurance (1032010) | LS | 1 | $52,000 | $185,000 | $43,500 | $233,200 | $150,000 |
| 0030 | Borrow excavation (2033000) | CY | 3,880 | $58.00 | $52.75 | $92.85 | $70.00 | $82.00 |
| 0040 | Excavation for shoulder paving (2036000) | STA | 1,416.10 | $77.00 | $28.95 | $44.50 | $84.00 | $82.00 |
| 0050 | Hauling of excavated shoulder material (2072000) | STA | 1,416.10 | $32.00 | $92.25 | $106.50 | $41.00 | $55.00 |
| 0060 | Additional rock for full depth reclamation (3059001) | TON | 3,176 | $44.00 | $71.15 | $47.50 | $101.00 | $105.00 |
| 0070 | Maintenance stone (3059900) | TON | 183 | $44.00 | $115.00 | $80.00 | $130.00 | $100.00 |
| 0080 | Cement modified recycled base (12" unif)-curing method B (3063242) | SY | 71,280 | $6.89 | $6.90 | $11.00 | $8.00 | $8.40 |
| 0090 | Portland cement for cement modified recycled base course (3064000) | TON | 2,673 | $208.00 | $232.00 | $200.00 | $185.96 | $240.00 |
| 0100 | HMA shoulder widening course (3104000) | TON | 9,621.92 | $65.00 | $71.70 | $77.85 | $89.00 | $106.00 |
| 0110 | Liquid asphalt binder PG64-22 (4011004) | TON | 2,301.43 | $565.00 | $612.00 | $670.00 | $776.25 | $690.00 |
| 0120 | Aramid fiber (4011500) | LB | 4,181.64 | $55.00 | $62.50 | $48.00 | $65.00 | $60.00 |
| 0130 | Full depth asph. pav. patching 8" unif (4012080) | SY | 5,500 | $75.00 | $64.15 | $79.35 | $97.00 | $89.00 |
| 0140 | Full depth asph. pav. patching 10"unif (4012100) | SY | 12,800 | $91.00 | $82.95 | $87.25 | $102.00 | $98.00 |
| 0150 | Milling existing asphalt pavement 2.0" (4013120) | SY | 172,244 | $2.25 | $2.30 | $2.15 | $2.40 | $3.00 |
| 0160 | Milling existing asphalt pavement (variable) (4013990) | SY | 420 | $34.00 | $48.25 | $22.50 | $31.50 | $50.00 |
| 0170 | Asphalt surface course type B (4040320) | TON | 24,087.24 | $82.00 | $83.40 | $90.00 | $95.00 | $117.00 |
| 0180 | Asphalt surface course type C (4040340) | TON | 6,063.96 | $76.00 | $83.50 | $78.35 | $92.00 | $112.00 |
| 0190 | Asphalt surface course type D (4040350) | TON | 310 | $90.00 | $127.80 | $108.00 | $160.00 | $133.00 |
| 0200 | Driveway paving-surface type D (4047230) | TON | 1,436.25 | $145.00 | $182.00 | $220.00 | $223.25 | $215.00 |
| 0210 | Traffic control (6011000) | LS | 1 | $220,000 | $290,000 | $640,000 | $188,000 | $395,000 |
| 0220 | Permanent construction signs (ground mounted) (6051120) | SF | 1,648 | $5.50 | $6.50 | $5.65 | $5.50 | $6.95 |
| 0230 | 4" white broken lines -(gaps excluded)-fast dry paint (6240005) | LF | 1,551 | $0.11 | $0.11 | $0.11 | $0.11 | $0.15 |
| 0240 | 4" white solid lines (PVT. edge lines)-fast dry paint (6240010) | LF | 614,748 | $0.10 | $0.10 | $0.10 | $0.10 | $0.11 |
| 0250 | 24" white solid lines (stop/diagonal lines)-fast dry paint (6240025) | LF | 1,065 | $0.01 | $0.01 | $0.10 | $0.01 | $0.11 |
| 0260 | 4" yellow broken lines(gaps exc) - fast dry paint (6240105) | LF | 55,050 | $0.12 | $0.12 | $0.12 | $0.12 | $0.14 |
| 0270 | 4"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110) | LF | 256,800 | $0.11 | $0.11 | $0.11 | $0.11 | $0.14 |
| 0280 | 4" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005) | LF | 425 | $0.48 | $0.48 | $0.48 | $0.48 | $0.75 |
| 0290 | 6" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271007) | LF | 92 | $1.00 | $1.00 | $0.95 | $1.00 | $1.25 |
| 0300 | 4" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010) | LF | 163,156 | $0.46 | $0.46 | $0.50 | $0.46 | $0.50 |
| 0310 | 6" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271012) | LF | 41,760 | $0.90 | $0.90 | $0.95 | $0.90 | $1.00 |
| 0320 | 24" white solid lines (stop/diag lines)-thermo.-125 mil (6271025) | LF | 355 | $20.00 | $20.00 | $20.55 | $20.00 | $15.00 |
| 0330 | 4" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271064) | LF | 13,560 | $0.48 | $0.48 | $0.50 | $0.48 | $0.44 |
| 0340 | 6" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271066) | LF | 4,790 | $0.90 | $0.90 | $0.95 | $0.90 | $0.75 |
| 0350 | 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074) | LF | 75,650 | $0.46 | $0.46 | $0.48 | $0.46 | $0.50 |
| 0360 | 6" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271076) | LF | 9,950 | $0.90 | $0.90 | $0.95 | $0.90 | $0.75 |
| 0370 | Evaluation of pavement marking retroreflectivity (6290001) | LS | 1 | $3,500.00 | $3,500.00 | $3,600.00 | $3,500.00 | $12,500 |
| 0380 | Permanent yellow pavement markers BI-dir.- 4"X4" (6301100) | EACH | 1,304 | $5.00 | $5.00 | $5.15 | $5.00 | $6.00 |
| 0390 | Milled-in rumble strip (6321000) | MI | 48.56 | $400.00 | $400.00 | $412.00 | $400.00 | $470.00 |
| 0400 | Premash reset W-beam strong post system (8051900) | LF | 1,420 | $17.00 | $17.00 | $17.50 | $18.35 | $17.00 |
| 0410 | Premash reset type T TL3 leading 50' (8052420) | EACH | 9 | $595.55 | $595.55 | $615.00 | $595.55 | $595.55 |
| 0420 | Premash type T TL3 leading 50' (8057100) | EACH | 3 | $4,500.00 | $4,500.00 | $4,640.00 | $5,000.00 | $4,500.00 |
| 0430 | Permanent grassing for non-permitted resurfacing projects (8100102) | ACRE | 12.93 | $3,600.00 | $3,091.82 | $3,300.00 | $3,300.00 | $3,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
Every contract let that day: SCDOT letting of September 9, 2025. Compiled by Mirage Metrics.