| 0010 | Mobilization (1031000) | LS | 1 | $266,700 | $263,000 | $175,000 |
| 0020 | Bonds and insurance (1032010) | LS | 1 | $106,500 | $10,900 | $75,000 |
| 0030 | Railroad insurance and flagging 001 (1071403) | LS | 1 | $30,000 | $11,625 | $8,500.00 |
| 0040 | Selected clearing & grubbing (2014000) | LS | 1 | $21,500 | $130,000 | $50,000 |
| 0050 | Removal & disposal of existing pavement (2023000) | SY | 1,267.70 | $36.00 | $36.00 | $10.75 |
| 0060 | Removal & disposal of existing curb (2024100) | LF | 650 | $16.00 | $16.00 | $25.00 |
| 0070 | Removal of exist. guardrail (2027801) | LF | 412 | $1.00 | $1.00 | $1.50 |
| 0080 | Unclassified excavation (2031000) | CY | 35 | $125.00 | $75.00 | $150.00 |
| 0090 | Borrow excavation (2033000) | CY | 399 | $31.00 | $80.00 | $65.00 |
| 0100 | Station grading (2035000) | STA | 3.17 | $2,000.00 | $1,500.00 | $1,500.00 |
| 0110 | Maintenance stone (3059900) | TON | 134.50 | $80.00 | $75.00 | $110.00 |
| 0120 | Liquid asphalt binder PG64-22 (4011004) | TON | 1,191.94 | $646.20 | $662.92 | $650.00 |
| 0130 | Full depth asph. pav. patching 6" unif. (4012060) | SY | 3,500 | $47.00 | $58.17 | $130.00 |
| 0140 | Full depth asph. pav. patching 8" unif (4012080) | SY | 820 | $106.00 | $93.41 | $135.00 |
| 0150 | Full depth asph. pav. patching 10"unif (4012100) | SY | 450 | $123.00 | $122.81 | $140.00 |
| 0160 | Full depth asph. pav. patching 12"unif (4012120) | SY | 3,800 | $105.05 | $122.45 | $150.00 |
| 0170 | Milling existing asphalt pavement 1.5" (4013115) | SY | 7,605 | $3.25 | $3.23 | $5.50 |
| 0180 | Milling existing asphalt pavement 1.75" (4013117) | SY | 108,100 | $2.65 | $2.61 | $5.50 |
| 0190 | Milling existing asphalt pavement (variable) (4013990) | SY | 38,285 | $3.00 | $5.33 | $3.50 |
| 0200 | Asphalt intermediate course type C (4030330) | TON | 2,235.90 | $58.49 | $74.91 | $98.00 |
| 0210 | Asphalt surface course type B (4040320) | TON | 12,835.26 | $65.74 | $77.04 | $103.00 |
| 0220 | Asphalt surface course type C (4040340) | TON | 4,291.61 | $79.50 | $82.08 | $98.00 |
| 0230 | Asphalt surface course type E (4040360) | TON | 534 | $58.31 | $99.01 | $110.00 |
| 0240 | Driveway paving-surface type C (4047220) | TON | 1,061.63 | $170.36 | $170.40 | $185.00 |
| 0250 | Traffic control (6011000) | LS | 1 | $478,000 | $305,000 | $246,000 |
| 0260 | Permanent construction signs (ground mounted) (6051120) | SF | 1,672 | $7.30 | $7.00 | $6.12 |
| 0270 | 4" white broken lines -(gaps excluded)-fast dry paint (6240005) | LF | 20,068 | $0.14 | $0.14 | $0.16 |
| 0280 | 4" white solid lines (PVT. edge lines)-fast dry paint (6240010) | LF | 61,214 | $0.14 | $0.14 | $0.16 |
| 0290 | 6" white solid lines (PVT. edge lines)-fast dry paint (6240012) | LF | 338 | $0.14 | $0.14 | $0.16 |
| 0300 | 8"white solid lines (crosswalk& channelization)fast dry paint (6240015) | LF | 8,936 | $0.14 | $0.14 | $0.16 |
| 0310 | 24" white solid lines (stop/diagonal lines)-fast dry paint (6240025) | LF | 3,390 | $0.50 | $0.50 | $0.57 |
| 0320 | White single arrow (left, straight, right)-fast dry paint (6240030) | EACH | 166 | $10.00 | $10.00 | $11.43 |
| 0330 | White word message "only"- fast dry paint (6240035) | EACH | 98 | $10.00 | $10.00 | $11.43 |
| 0340 | White combination arrow(STR.& RT.or STR.& LT.)fast dry paint (6240040) | EACH | 16 | $10.00 | $10.00 | $11.43 |
| 0350 | Railroad crossing symbols - fast dry paint (6240045) | EACH | 8 | $25.00 | $25.00 | $28.58 |
| 0360 | 4" yellow broken lines(gaps exc) - fast dry paint (6240105) | LF | 2,484 | $0.14 | $0.14 | $0.16 |
| 0370 | 4"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110) | LF | 183,402 | $0.20 | $0.14 | $0.16 |
| 0380 | 6" yellow solid line on curb/median - fast dry paint (6240112) | LF | 1,920 | $1.00 | $1.00 | $1.14 |
| 0390 | 4" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005) | LF | 10,085 | $0.85 | $0.85 | $0.97 |
| 0400 | 4" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010) | LF | 30,757 | $0.42 | $0.42 | $0.48 |
| 0410 | 6" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271012) | LF | 169 | $0.85 | $0.85 | $0.97 |
| 0420 | 8" white solid lines thermoplastic - 125 mil. (6271015) | LF | 4,468 | $2.65 | $2.65 | $3.03 |
| 0430 | 24" white solid lines (stop/diag lines)-thermo.-125 mil (6271025) | LF | 1,695 | $8.75 | $8.75 | $10.00 |
| 0440 | White single arrows (LT, STRGHT, RT) thermo.-125 mil. (6271030) | EACH | 85 | $75.00 | $75.00 | $85.73 |
| 0450 | White word message "only" - thermoplastic - 125 mil. (6271035) | EACH | 49 | $75.00 | $75.00 | $85.73 |
| 0460 | White combination arrows(STR&RT.or STR& LT)thermo-125MIL (6271040) | EACH | 8 | $150.00 | $150.00 | $171.46 |
| 0470 | Railroad crossing symbols - thermoplastic - 125 mil. (6271045) | EACH | 4 | $400.00 | $400.00 | $457.22 |
| 0480 | 4" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271064) | LF | 1,242 | $0.42 | $0.42 | $0.48 |
| 0490 | 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074) | LF | 91,701 | $0.42 | $0.42 | $0.48 |
| 0500 | Permanent clear pavement markers- mono-dir.- 4"X4" (6300005) | EACH | 470 | $6.00 | $6.00 | $6.86 |
| 0510 | Permanent yellow pavement markers mono-dir.- 4"X 4" perm. yel. (6301005) | EACH | 200 | $6.00 | $6.00 | $6.86 |
| 0520 | Permanent yellow pavement markers BI-dir.- 4"X4" (6301100) | EACH | 777 | $6.00 | $6.00 | $6.86 |
| 0530 | Furnish & install 1.0" schedule 80 PVC conduit (6750275) | LF | 100 | $24.75 | $25.00 | $28.58 |
| 0540 | Furnish & instl no. 14 copper wire,1-conductor for loop wire (6770413) | LF | 12,004 | $0.56 | $0.56 | $4.57 |
| 0550 | Sawcut for loop detector (6780495) | LF | 4,283 | $9.00 | $9.00 | $9.14 |
| 0560 | F&I-12"X12"X12"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD (6800508) | EACH | 4 | $264.00 | $270.00 | $1,714.57 |
| 0570 | Temporary adjustment of traffic signal equipment (6885993) | EACH | 7 | $9,000.00 | $9,000.00 | $32,577 |
| 0580 | Catch basin - type 16 (top only) (7196173) | EACH | 1 | $2,300.00 | $2,300.00 | $3,500.00 |
| 0590 | Catch basin T-17 (convert C.B. type 6) (7198292) | EACH | 48 | $6,800.00 | $6,800.00 | $3,500.00 |
| 0600 | Catch basin T-18 (convert C.B. type 7) (7198293) | EACH | 6 | $7,200.00 | $7,200.00 | $3,500.00 |
| 0610 | Concrete curb and gutter(1'-6") vertical face (7203110) | LF | 400 | $32.00 | $32.00 | $35.00 |
| 0620 | Concrete curb and gutter(2'-0") vertical face (7203210) | LF | 250 | $37.00 | $37.00 | $40.00 |
| 0630 | Concrete sidewalk(4" uniform) (7204100) | SY | 370 | $75.00 | $75.00 | $88.00 |
| 0640 | Detectable warning material (7204900) | SF | 612.50 | $40.00 | $40.00 | $20.00 |
| 0650 | Concrete median (7206000) | SY | 80 | $110.00 | $110.00 | $135.00 |
| 0660 | Pedestrian ramp construction (7209000) | SY | 1,225 | $110.00 | $110.00 | $135.00 |
| 0670 | Surface applied detectable warning (7209100) | SF | 75 | $60.00 | $60.00 | $20.00 |
| 0680 | MT3 leading end treatment TL3 (8051151) | EACH | 1 | $3,400.00 | $3,400.00 | $4,457.87 |
| 0690 | MB trailing end treatment (8051710) | EACH | 1 | $1,800.00 | $1,800.00 | $2,228.93 |
| 0700 | MGS3CS GR compressed shoulder (8052150) | LF | 125 | $24.00 | $24.00 | $33.15 |
| 0710 | Premash type T TL3 leading 50' (8057100) | EACH | 4 | $3,200.00 | $3,200.00 | $4,457.87 |
| 0720 | Permanent grassing for non-permitted resurfacing projects (8100102) | ACRE | 1.97 | $4,250.00 | $8,000.00 | $3,623.45 |