SCDOT contract 5372860 bid tabulation
2026 District 3 Pavement Improvement. Let by South Carolina DOT on September 9, 2025, Greenville, Spartanburg, District 3. 4 bids received; low bid $10,283,710 by Reeves Construction Company.
- Owner
- South Carolina DOT
- Letting
- 09 SEP 2025
- Pay items
- 69
- Data through
- 13 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Reeves Construction Company | $10,283,710 | Low |
| 2 | King Asphalt, Inc. | $11,925,993 | +16% |
| 3 | Rogers Group, Inc. | $12,059,274 | +17% |
| 4 | Palmetto Corp. of Conway | $12,631,149 | +23% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Reeves Construction Company | 2. King Asphalt, Inc. | 3. Rogers Group, Inc. | 4. Palmetto Corp. of Conway |
|---|---|---|---|---|---|---|---|
| 0010 | Mobilization (1031000) | LS | 1 | $207,750 | $550,000 | $600,000 | $630,000 |
| 0020 | Bonds and insurance (1032010) | LS | 1 | $110,175 | $75,000 | $337,500 | $250,000 |
| 0030 | Removal & disposal of existing pavement (2023000) | SY | 250 | $39.00 | $47.50 | $43.50 | $57.65 |
| 0040 | Removal of exist. guardrail (2027801) | LF | 1,300 | $2.15 | $1.05 | $2.15 | $1.00 |
| 0050 | Borrow excavation (2033000) | CY | 2,010 | $71.75 | $105.00 | $112.00 | $66.25 |
| 0060 | Excavation for shoulder paving (2036000) | STA | 601.39 | $158.00 | $80.00 | $190.00 | $75.00 |
| 0070 | Hauling of excavated shoulder material (2072000) | STA | 601.39 | $127.00 | $95.00 | $150.00 | $201.75 |
| 0080 | Maintenance stone (3059900) | TON | 270.25 | $135.00 | $95.00 | $160.00 | $130.00 |
| 0090 | HMA shoulder widening course (3104000) | TON | 4,847.04 | $77.75 | $88.00 | $103.50 | $111.25 |
| 0100 | Liquid asphalt binder PG64-22 (4011004) | TON | 2,445.25 | $635.00 | $680.00 | $650.00 | $630.00 |
| 0110 | Full depth asph. pav. patching 4" unif. (4012040) | SY | 1,200 | $61.30 | $70.00 | $66.00 | $65.55 |
| 0120 | Full depth asph. pav. patching 8" unif (4012080) | SY | 15,825 | $73.00 | $95.00 | $80.00 | $102.55 |
| 0130 | Milling existing asphalt pavement 1.75" (4013117) | SY | 151,083 | $1.80 | $3.60 | $3.40 | $3.05 |
| 0140 | Milling existing asphalt pavement 2.0" (4013120) | SY | 180,998 | $1.35 | $3.20 | $3.30 | $3.95 |
| 0150 | Milling existing asphalt pavement (variable) (4013990) | SY | 19,230 | $9.50 | $6.00 | $11.50 | $6.70 |
| 0160 | Asphalt surface course type B (4040320) | TON | 28,810.65 | $90.00 | $101.50 | $94.25 | $120.30 |
| 0170 | Asphalt surface course type C (4040340) | TON | 8,660.88 | $88.25 | $96.50 | $120.25 | $114.60 |
| 0180 | Driveway paving-surface type C (4047220) | TON | 1,153.70 | $219.50 | $230.00 | $212.00 | $237.00 |
| 0190 | Traffic control (6011000) | LS | 1 | $1,000,750 | $995,000 | $825,000 | $650,000 |
| 0200 | Permanent construction signs (ground mounted) (6051120) | SF | 4,660 | $6.35 | $7.80 | $6.35 | $5.50 |
| 0210 | 4" white broken lines -(gaps excluded)-fast dry paint (6240005) | LF | 57,760 | $0.17 | $0.15 | $0.13 | $0.12 |
| 0220 | 4" white solid lines (PVT. edge lines)-fast dry paint (6240010) | LF | 178,694 | $0.17 | $0.15 | $0.13 | $0.12 |
| 0230 | 6" white solid lines (PVT. edge lines)-fast dry paint (6240012) | LF | 45,622 | $0.27 | $0.20 | $0.22 | $0.20 |
| 0240 | 8"white solid lines (crosswalk& channelization)fast dry paint (6240015) | LF | 13,470 | $0.55 | $0.20 | $0.22 | $0.20 |
| 0250 | 24" white solid lines (stop/diagonal lines)-fast dry paint (6240025) | LF | 4,628 | $1.10 | $1.05 | $1.10 | $1.00 |
| 0260 | White single arrow (left, straight, right)-fast dry paint (6240030) | EACH | 118 | $27.00 | $10.50 | $10.85 | $10.00 |
| 0270 | White word message "only"- fast dry paint (6240035) | EACH | 40 | $27.00 | $10.50 | $10.85 | $10.00 |
| 0280 | White combination arrow(STR.& RT.or STR.& LT.)fast dry paint (6240040) | EACH | 4 | $27.00 | $10.50 | $10.85 | $10.00 |
| 0290 | 4" yellow broken lines(gaps exc) - fast dry paint (6240105) | LF | 55,960 | $0.17 | $0.15 | $0.13 | $0.12 |
| 0300 | 4"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110) | LF | 467,939 | $0.17 | $0.15 | $0.13 | $0.12 |
| 0310 | 6" yellow solid line on curb/median - fast dry paint (6240112) | LF | 3,525 | $0.27 | $0.50 | $0.55 | $0.50 |
| 0320 | 4" white broken lines -(gaps excluded) - epoxy paint slow cure (6261005) | LF | 460 | $9.75 | $5.55 | $5.75 | $5.25 |
| 0330 | 8"white solid lines- crosswalk&channelization- epoxy paint slow cure (6261015) | LF | 845 | $9.75 | $10.80 | $11.00 | $10.25 |
| 0340 | 24"white solid lines(stop lines/diag.lines) epoxy paint slow cure (6261025) | LF | 60 | $27.00 | $12.90 | $13.00 | $12.25 |
| 0350 | White single arrows (left, straight, right) epoxy paint slow cure (6261030) | EACH | 6 | $162.00 | $420.00 | $425.00 | $400.00 |
| 0360 | 4" yellow broken lines(gaps exc) epoxy paint slow cure (6261105) | LF | 160 | $9.75 | $5.55 | $5.75 | $5.25 |
| 0370 | 4"yellow solid lines- PVT.edge&no passing zone - epoxy paint slow cure (6261110) | LF | 1,100 | $9.75 | $5.55 | $5.75 | $5.25 |
| 0380 | 4" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005) | LF | 14,610 | $0.55 | $0.55 | $0.55 | $0.52 |
| 0390 | 4" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010) | LF | 91,247 | $0.55 | $0.50 | $0.50 | $0.46 |
| 0400 | 6" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271012) | LF | 22,811 | $0.80 | $0.85 | $0.85 | $0.78 |
| 0410 | 8" white solid lines thermoplastic - 125 mil. (6271015) | LF | 6,735 | $2.15 | $2.90 | $3.00 | $2.75 |
| 0420 | 12IN X 18IN white triang. yield bar (gaps exc)thermo-125MIL (6271023) | LF | 16 | $10.80 | $5.25 | $5.50 | $5.00 |
| 0430 | 24" white solid lines (stop/diag lines)-thermo.-125 mil (6271025) | LF | 2,314 | $8.70 | $8.50 | $8.75 | $8.00 |
| 0440 | White single arrows (LT, STRGHT, RT) thermo.-125 mil. (6271030) | EACH | 59 | $92.50 | $68.50 | $70.50 | $65.00 |
| 0450 | White word message "only" - thermoplastic - 125 mil. (6271035) | EACH | 20 | $136.00 | $68.50 | $70.50 | $65.00 |
| 0460 | White combination arrows(STR&RT.or STR& LT)thermo-125MIL (6271040) | EACH | 2 | $136.00 | $105.00 | $108.50 | $100.00 |
| 0470 | 4" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271064) | LF | 13,990 | $0.55 | $0.50 | $0.50 | $0.48 |
| 0480 | 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074) | LF | 116,986 | $0.55 | $0.50 | $0.50 | $0.48 |
| 0490 | Bike lane symbol -preformed thermo - 60MIL (6280055) | EACH | 11 | $205.00 | $127.50 | $130.00 | $120.00 |
| 0500 | Bike lane arrow - preformed thermo - 60MIL (6280056) | EACH | 21 | $81.50 | $63.25 | $65.00 | $60.00 |
| 0510 | Permanent clear pavement markers- mono-dir.- 4"X4" (6300005) | EACH | 891 | $7.55 | $6.35 | $6.50 | $6.00 |
| 0520 | Permanent yellow pavement markers mono-dir.- 4"X 4" perm. yel. (6301005) | EACH | 784 | $7.55 | $6.35 | $6.50 | $6.00 |
| 0530 | Permanent yellow pavement markers BI-dir.- 4"X4" (6301100) | EACH | 1,914 | $7.55 | $6.35 | $6.50 | $6.00 |
| 0540 | Milled-in rumble strip (6321000) | MI | 5.24 | $540.00 | $525.00 | $3,050.00 | $500.00 |
| 0550 | Plastic curbing with single post (6562000) | EACH | 4 | $146.00 | $220.00 | $225.00 | $210.00 |
| 0560 | Furnish & install 1.0" schedule 80 PVC conduit (6750275) | LF | 1,680 | $19.00 | $18.50 | $19.00 | $17.50 |
| 0570 | Furnish & instl no. 14 copper wire,1-conductor for loop wire (6770413) | LF | 30,160 | $1.10 | $1.05 | $1.10 | $1.00 |
| 0580 | Sawcut for loop detector (6780495) | LF | 10,960 | $9.75 | $9.50 | $9.75 | $9.00 |
| 0590 | F&I-13"X24"X18"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD (6800518) | EACH | 24 | $900.00 | $875.00 | $900.00 | $831.17 |
| 0600 | Temporary adjustment of traffic signal equipment (6885993) | EACH | 8 | $11,500 | $11,050 | $11,500 | $10,500 |
| 0610 | Concrete sidewalk(4" uniform) (7204100) | SY | 300 | $85.00 | $116.00 | $108.00 | $109.50 |
| 0620 | Detectable warning material (7204900) | SF | 435 | $43.50 | $58.00 | $65.00 | $55.00 |
| 0630 | Pedestrian ramp construction (7209000) | SY | 275 | $185.00 | $152.50 | $215.00 | $144.75 |
| 0640 | Surface applied detectable warning (7209100) | SF | 62.50 | $65.00 | $58.00 | $65.00 | $72.00 |
| 0650 | Premash reset W-beam strong post system (8051900) | LF | 6,275 | $16.25 | $16.85 | $16.00 | $16.00 |
| 0660 | Premash trailing W-beam type B 12.5' (8052210) | EACH | 1 | $1,075.00 | $2,105.00 | $1,065.00 | $2,000.00 |
| 0670 | Premash reset trail W-beam type B 12.5' (8052400) | EACH | 5 | $805.00 | $845.00 | $800.00 | $800.00 |
| 0680 | Premash type T TL3 leading 50' (8057100) | EACH | 26 | $6,300.00 | $2,945.00 | $3,500.00 | $2,795.00 |
| 0690 | Permanent grassing for non-permitted resurfacing projects (8100102) | ACRE | 9.42 | $3,600.00 | $3,675.00 | $3,600.00 | $3,491.90 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
Every contract let that day: SCDOT letting of September 9, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.