SCDOT contract 5474330 bid tabulation

2026 District 4 Pavement Improvement. Let by South Carolina DOT on November 12, 2025, Cherokee, Union, District 4. 4 bids received; low bid $7,392,626 by Palmetto Corp. of Conway.

Owner
South Carolina DOT
Letting
12 NOV 2025
Pay items
58
Data through
13 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Palmetto Corp. of Conway$7,392,626Low
2King Asphalt, Inc.$7,903,996+7.0%
3Rogers Group, Inc.$8,316,515+12%
4Reeves Construction Company$8,385,530+13%
SCDOT contract 5474330: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Palmetto Corp. of Conway2. King Asphalt, Inc.3. Rogers Group, Inc.4. Reeves Construction Company
0010Mobilization (1031000)LS1$325,000$395,000$415,000$345,000
0020Bonds and insurance (1032010)LS1$145,000$236,350$225,000$69,500
0030Removal & disposal of existing pavement (2023000)SY490.22$18.10$47.00$40.00$52.75
0040Removal & disposal of existing curb (2024100)LF86$28.15$19.00$18.50$19.75
0050Removal of exist. guardrail (2027801)LF1,499.50$1.00$1.00$2.00$1.15
0060Unclassified excavation (2031000)CY664$51.50$55.50$210.00$17.50
0070Borrow excavation (2033000)CY1,406$86.75$46.00$155.00$109.50
0080Excavation for shoulder paving (2036000)STA124.82$34.15$76.00$165.00$148.00
0090Hauling of excavated shoulder material (2072000)STA124.82$120.00$69.00$95.00$155.00
0100Maintenance stone (3059900)TON171.39$105.00$107.00$285.00$109.00
0110Cement modified recycled base (8" unif)-curing method B (3063222)SY69,521$9.75$9.70$9.55$9.25
0120Cement modified recycled base (10" unif)-curing method B (3063232)SY27,867$9.85$10.80$11.00$9.25
0130Portland cement for cement modified recycled base course (3064000)TON2,882$240.00$236.00$250.00$270.00
0140HMA shoulder widening course (3104000)TON830.72$85.95$89.30$123.00$89.00
0150Liquid asphalt binder PG64-22 (4011004)TON1,404.67$610.00$685.00$625.00$670.00
0160Full depth asph. pav. patching 6" unif. (4012060)SY2,850$65.20$76.70$68.00$76.00
0170Full depth asph. pav. patching 8" unif (4012080)SY279$151.40$216.00$235.00$235.00
0180Full depth asph. pav. patching 10"unif (4012100)SY3,890$107.75$124.00$120.00$97.00
0190Milling existing asphalt pavement 1.5" (4013115)SY5,100$2.25$3.90$4.25$3.60
0200Milling existing asphalt pavement 2.0" (4013120)SY26,704$2.95$4.20$3.15$2.35
0210Milling existing asphalt pavement (variable) (4013990)SY8,318$5.75$10.80$11.50$16.75
0220Asphalt intermediate course type B (4030320)TON2,674.03$91.05$88.00$93.50$93.00
0230Asphalt intermediate course type C (4030330)TON2,675.20$92.85$88.00$95.00$95.75
0240Asphalt surface course type B (4040320)TON2,674.03$95.85$87.40$91.50$90.75
0250Asphalt surface course type C (4040340)TON13,712.71$98.05$92.25$96.50$111.00
0260Driveway paving-surface type C (4047220)TON1,132.25$230.00$237.00$240.00$250.00
0270Asphalt surface treat (single treatment) (4060010)SY97,388$3.02$2.90$2.25$3.50
0290Traffic control (6011000)LS1$275,000$505,500$534,000$720,000
0300Permanent construction signs (ground mounted) (6051120)SF1,824$5.50$5.20$8.50$7.25
03104" white broken lines -(gaps excluded)-fast dry paint (6240005)LF875$0.01$0.01$0.02$0.01
03204" white solid lines (PVT. edge lines)-fast dry paint (6240010)LF335,173$0.12$0.12$0.13$0.14
033024" white solid lines (stop/diagonal lines)-fast dry paint (6240025)LF1,682$0.25$0.50$0.27$0.30
03404" yellow broken lines(gaps exc) - fast dry paint (6240105)LF5,710$0.12$0.12$0.13$0.14
03504"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110)LF304,069$0.12$0.12$0.13$0.14
03604" white solid lines (PVT. edge lines) epoxy paint slow cure (6261010)LF570$6.00$6.00$6.50$7.00
03704" yellow broken lines(gaps exc) epoxy paint slow cure (6261105)LF50$6.00$6.00$6.60$7.00
03804"yellow solid lines- PVT.edge&no passing zone - epoxy paint slow cure (6261110)LF180$6.00$6.00$6.40$7.00
03904" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005)LF687$0.75$0.75$0.80$0.87
04004" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010)LF100,777$0.46$0.46$0.48$0.53
041024" white solid lines (stop/diag lines)-thermo.-125 mil (6271025)LF799$10.00$10.00$10.50$11.50
04204" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271064)LF3,770$0.46$0.46$0.50$0.53
04304" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074)LF80,049$0.46$0.46$0.48$0.53
0440Permanent yellow pavement markers BI-dir.- 4"X4" (6301100)EACH686$6.00$6.00$6.60$7.00
0450Milled-in rumble strip (6321000)MI16.12$500.00$1,150.00$1,950.00$580.00
046015" smooth wall pipe (7143615)LF48$224.50$187.00$585.00$335.00
0470Catch basin type 1 (top only) (7196110)EACH4$2,865.00$2,600.00$2,200.00$3,200.00
0480Catch basin - type 16 (top only) (7196173)EACH1$4,470.00$2,800.00$2,525.00$5,150.00
0490Concrete curb and gutter(2'-0") vertical face (7203210)LF86$72.25$40.00$68.00$72.00
0500Concrete sidewalk(4" uniform) (7204100)SY138.22$105.70$75.00$95.00$102.00
0510Detectable warning material (7204900)SF162.50$55.00$55.00$46.00$48.00
0520Pedestrian ramp construction (7209000)SY325$157.10$105.00$180.00$185.00
0525Reseal deck expansion joint (7261127)LF233$115.88$60.00$142.00$136.50
0530Premash W-beam strong post system WSP3 (8051050)LF412.50$27.29$27.29$24.00$31.50
0540Premash nest thrie 1.56 spa critical offset (8051400)LF237.50$76.63$76.63$132.00$89.00
0550Premash trailing W-beam type B 12.5' (8052210)EACH1$1,606.66$1,606.66$1,525.00$1,850.00
0560Premash thriebeam bridge conn TBBC3 (8053250)EACH8$2,631.26$2,631.26$2,900.00$3,000.00
0570Premash type T TL3 leading 50' (8057100)EACH11$3,293.98$3,293.98$3,300.00$6,000.00
0580Permanent grassing for non-permitted resurfacing projects (8100102)ACRE5.18$3,000.00$3,450.00$3,800.00$4,000.00
SCDOT contract 5474330: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.

Every contract let that day: SCDOT letting of November 12, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way