SCDOT contract 5476870 bid tabulation

District 4 FYA Signal Upgrades. Let by South Carolina DOT on September 9, 2026, District 4, District 2. 2 bids received; low bid $157,678 by W.M. Roebuck, Incorporated.

Owner
South Carolina DOT
Letting
09 SEP 2026
Pay items
11
Data through
13 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1W.M. Roebuck, Incorporated$157,678Low
2Walker Brothers, Inc.$190,463+21%
SCDOT contract 5476870: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. W.M. Roebuck, Incorporated2. Walker Brothers, Inc.
0010Mobilization (1031000)LS1$16,000$25,000
0020Bonds and insurance (1032010)LS1$4,592.55$2,303.00
0030Traffic control (6011000)LS1$16,000$23,000
0040Flat sheet, type III, fixed SZ. & MSG. sign (6510105)SF157.50$45.00$24.00
0050Mounting assembly for F.S. sign erctd on span wire (6513015)EACH21$395.00$330.00
0060Furnish & install no. 14 copper wire, 8 conductor (black) (6770393)LF4,985$6.50$6.00
0070Furnish & install -12" 4 (6865720)EACH17$1,300.00$1,250.00
0080Furnish & install - 12" 3 (6865723)EACH22$1,000.00$895.00
0090Backplate W/ retrorefl.borders for traff. sig. (6865834)EACH56$200.00$350.00
0100Removal,salvage,&disp.of existing traf. signal equipment (6885990)LS1$5,000.00$13,000
0110Temporary adjustment of traffic signal equipment (6885993)EACH13$1,000.00$2,000.00
SCDOT contract 5476870: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.

Every contract let that day: SCDOT letting of September 9, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy