Walker Brothers, Inc.: SCDOT bid record

Walker Brothers, Inc. submitted 23 bids on South Carolina DOT contracts in the data, from 12 APR 2022 to 09 SEP 2026, and was the low bidder on 10 of them (43%). When it was not low, its total sat a median +21% above the low bid.

Owner
South Carolina DOT
Low bid volume
$7,271,584
Latest bid
09 SEP 2026
Data through
13 OCT 2026
23Bids
10Low bids
43Win rate, percent
+21%Median gap to the low bid when not low, 13 bids

By year

YearBidsLow bidsWin rate
20226467%
2023200%
20243267%
20256233%
20266233%
Walker Brothers, Inc., SCDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 15240%
District 75360%
District 24125%
District 43133%
District 633100%
District 3200%
District 5100%
Walker Brothers, Inc., SCDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Furnish & install - 12" 36865723EACH2320 (87%)$825.00$950.00
Mounting assembly for F.S. sign erctd on span wire6513015EACH1715 (88%)$185.00$346.00
F&I-ped push but.solid state W/ tone assem 9"X15"&sign (R- 10-3E or R10-4A)6865797EACH1813 (72%)$460.00$586.25
F&I - contr 332/336 cabinet assembly - base mounted 0016845511EACH1713 (76%)$18,000$20,949
Furnish & install -12" 46865720EACH1512 (80%)$1,100.00$1,200.00
Furnish & install no. 14 copper wire, 8 conductor (black)6770393LF2111 (52%)$5.40$5.00
Furnish & install no. 14 copper wire, 4 conductor - gray6770389LF1811 (61%)$4.30$4.04
Sawcut for loop detector6780495LF1710 (59%)$8.60$9.04
8" white solid lines thermoplastic - 125 mil.6271015LF1610 (63%)$3.98$3.00
F&I-13"X24"X18"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD6800518EACH1610 (63%)$762.50$755.00
24" white solid lines (stop/diag lines)-thermo.-125 mil6271025LF1510 (67%)$15.00$10.00
F&I-17"X30"X24"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD680052CEACH169 (56%)$950.00$1,000.00
Walker Brothers, Inc., SCDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
W.M. Roebuck, Incorporated1910 of 19
Little Mountain Contracting, LLC51 of 5
Premier Constructors, Inc.50 of 5
Grant Electrical Contracting, LLC42 of 4
Lumin8 Transportation Technologies, LLC41 of 4
Red Electrical Designs, LLC30 of 3
Haynes Electric Utility, A Division of MB20 of 2
Als of North Carolina, LLC10 of 1
Walker Brothers, Inc., SCDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
09 SEP 20265476870District 2District 4 FYA Signal Upgrades2 of 2$190,463+21%
09 SEP 20265776880District 2District 7 FYA Signal Upgrades2 of 2$125,096+16%
11 AUG 20261077530District 6Type II Signal Rebuilds Dist. 61 of 2$1,165,387Low, 29% under the second
14 APR 20260260470District 7Type II Traffic Signal Upgrades in District 72 of 4$841,049+22%
10 FEB 20263260750District 1Type II Traffic Signal Rebuilds in District 12 of 3$978,396+39%
10 FEB 20263272520District 1District 1 Traffic Signal Upgrade1 of 2$344,833Low, 61% under the second
12 NOV 20252056600District 4Traffic Signal Upgrade - US 21 at SC 342 of 3$299,687+25%
09 SEP 20255473240District 4Traffic Signal Upgrades in District 42 of 2$2,088,395+11%
12 AUG 20254058481District 1Signal Rebuilds - District 12 of 3$225,237+4.0%
10 JUN 20255771710District 7Traffic Signal Upgrade for District 71 of 2$789,598Low, 4.0% under the second
13 MAY 20255761880District 7Type II Traffic Signal Upgrade District 71 of 2$596,439Low, 9.0% under the second
11 MAR 20255361690District 3Type II Traffic Signal Rebuild District 3 RY232 of 2$845,971+7.0%
10 DEC 20240460340District 2Type II Traffic Signal Upgrades City of Anderson FY221 of 1$1,272,574Low
09 JUL 20245769540District 7Type II Traffic Signal Installation at SC 19 and S-816 D71 of 2$243,458Low, 58% under the second
09 APR 20245260330District 2Traffic Signal Rebuilds in District 22 of 2$4,156,886+43%
12 SEP 20230264100District 7Type II District 7 Rebuild Project FY232 of 3$797,326+19%
14 FEB 20235164260District 1Signal Upgrades - Lexington/Richland Co3 of 4$1,453,454+25%
09 AUG 20224261560District 3Signal Upgrades - District 32 of 6$306,489+8.0%
09 AUG 20225161951District 1Signal Upgrades - Lexington/Richland Co1 of 5$513,609Low, 2.0% under the second
09 AUG 20225461550District 4Signal Upgrades - District 41 of 6$424,297Low, 2.0% under the second
09 AUG 20225661730District 6Signal Upgrades - District 61 of 4$619,962Low, 7.0% under the second
09 AUG 20225662610District 6Signal -Mast Arm Install (Charleston/Berkeley Co)1 of 2$1,301,427Low, 2.0% under the second
12 APR 20225559881District 5Safety Improvements - District 52 of 2$823,724+54%
Walker Brothers, Inc.: latest SCDOT bids in the data

How this record was read

SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; SCDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy